Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses ML20210D9011999-07-23023 July 1999 Forwards Safety Evaluation Re Inservice Testing Plan Request for Relief RR-5 Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210C2111999-07-21021 July 1999 Forwards Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626.Two Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209H9231999-07-16016 July 1999 Discusses South Texas Project,Units 1 & 2 Updated Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Staff Revised Info for Plant in Rvid & Being Released as Rvid Version 2 ML20207H6261999-07-0808 July 1999 Responds to Re 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546, Alternative Requirements for Qualification of VT-2 Exam Personnel,Section Xi,Division 1.Forwards SE ML20195J6731999-06-17017 June 1999 Responds to Re Request for Relief from ASME Code, Section Xi,Requirement to Perform VT-1 Visual Exam on Accessible Surfaces of RPV Flange Inserts (Bushings). Safety Evaluation Encl ML20195F7561999-06-10010 June 1999 Forwards Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515 at South Texas Project Electric Generating Station,Units 1 & 2.No Violations Were Identified ML20207H0031999-06-0909 June 1999 Discusses 990419 Meeting in Region IV Ofc Re South Texas Project EP Program Status,Including Initiatives in EP Program,Future Revs to EP & Dept Performance Indicators. Meeting Attendance List & Licensee Presentation Encl ML20195G3241999-06-0909 June 1999 Ack Receipt of Re Changes to Plant Emergency Plan Change Notice 18-2.No Violations of 10CFR50.54(q) Were Identified ML20207D7371999-05-28028 May 1999 Discusses Re Process for Reclassification of non- Risk Significant Components.Forwards Concerns & Cautions for Consideration Based on Limited Review of Reclassification Process Overview That Was Provided IR 05000498/19980151999-05-28028 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/98-15 & 50-499/98-15.Corrective Actions Reviewed & Found to Be Responsive to Issues Raised ML20207E1961999-05-25025 May 1999 Forwards Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Primary Focus of Insp to Review Operational Status of Emergency Preparedness Program ML20207A8771999-05-25025 May 1999 Forwards RAI Re Licensee 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant,Units 1 & 2.Response Requested within 120 Days from Date of Ltr IR 05000498/19990061999-05-12012 May 1999 Submits Corrected First Page of Cover Ltr Re Insp Repts 50-498/99-06 & 50-499/99-06 Conducted on 990221-0403.Subj Line Was Corrected ML20206S3201999-05-12012 May 1999 Forwards Corrected First Page of Cover Ltr,Which Forwarded Insp Repts 50-498/99-06 & 50-499/99-06,issued on 990505. Subj Line Indicated on NOV Was Incorrect ML20206N5481999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ra Gramm Will Be Section Chief for South Texas Project.Organization Chart Encl ML20206J4321999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info.Without Encl ML20206J4211999-05-0606 May 1999 Ack Receipt of in Response to & Insp Repts 50-498/99-04 & 50-499/99-04,confirming Commitments as Stated in 990225 Exit Meeting ML20206H6201999-05-0505 May 1999 Forwards Insp Repts 50-498/99-06 & 50-499/99-06 on 990221- 0403.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206H3811999-05-0505 May 1999 Responds to STP Nuclear Operating Co Which Provided Update to TS Bases Pages B 3/4 2-6.Revised TS Bases B 3/4 2-6 That NRC Staff Will Use to Update Copy of STP Bases Encl ML20206H2001999-05-0404 May 1999 Forwards Exemption from Requirements of 10CFR50.60, Acceptance Criteria for Fracture Prevention Measures for Lightwater Nuclear Power Reactors for Normal Operation ML20206B6091999-04-22022 April 1999 Forwards Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted ML20206B3281999-04-22022 April 1999 Forwards Insp Repts 50-498/99-07 & 50-499/99-07 on 990405- 09.Insp Focused on Radiological Controls in Place During Unit Refueling Outage.Violations Identified Involving Failure to Follow Radiation Work Permit Instructions ML20205Q8151999-04-16016 April 1999 Forwards Request for Addl Info Re Proposed Amends on Operator Action for small-break-LOCA,dtd 980728.Response Requested within 45 Days of Ltr Date ML20205P5821999-04-15015 April 1999 Advises That Version of Application & Affidavit Dtd 990127, Executed by Ha Sepp,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended 1999-09-09
[Table view] |
See also: IR 05000498/1993030
Text
. _ . _
.
,gy r
8
tJNIT f() ST ATE 5 - i
'
NUCLEAR REGULA TORY COMMISSION
- -
f
4 , ,
.~ '
us cias e
'
. k,[;jjf4:s); .= t.n n s as sv.u w. s su i c eau
anw.umy<txn vonaou
"' "
. ..... g .- 7 1993 -
,
Dockets: 50-498
50-499
Licenses: NPF-76
NPF-80 t
i
-;
Houston Lighting & Power Company
ATTN: William T. Cottle, Group
Vice President, Nuclear
P.0. Box 289
Wadsworth, Texas 77483
SUBJECT: NRC INSPECTION REPORT 50-498/93-30; 50-499/93-30 j
Thank you for your letter of November 24, 1993, in response to our
letter and Notice of Violation dated October 27, 1993. We have reviewed your
,
reply and find it responsive to the concerns raised in our Notice of
Violation. We will review the implementation of your corrective actions
during a future inspection to determine that full compliance has been achieved
and will be maintained. l
Sincerely,
i
I I
/
~ J
. Bill Beach, Director .
Division of Reactor Projects
cc:
Houston Lighting & Power Company
ATTN: James J. Sheppard, General Manager
Nucleer Licensing j
P.O. Box 289
Wadsworth, Texas 77483 '
I
f
i
p AD DR ;.
O
r
_. __ _ _ _ _ . . . ._. . . _
..
l
!
'
,
!
!
Houston Lighting & Power Company -2- 1
l
!
i
City of Austin :l
r
Electric Utility Department
ATTN: J. C. Lanier/M. B. Lee -!
721 Barton Springs Road
Austin, Texas 78704
$
City Public Service Board '
ATIN: K. J. Fiedler/M. T. Hardt ,
P.O. Box 1771
San Antonio, Texas 78296
i
Newman & Holtzinger, P. C.
ATTN: Jack R. Newman, Esq. l
1615 L Street, NW t
Washington, D.C. 20036 ll
f
-
Central Power and Light Company
ATIN: G. E. Vaughn/T. M. Puckett
P.O. Box 2121 ll
Corpus Christi, Texas 78403 l
'
INPO
Records Center
700 Galleria Parkway i
Atlanta, Georgia 30339-5957 .f
I
Mr. Joseph M. Hendrie
50 Be11 port Lane
1
Bellport, New York 11713 j
Bureau of Radiation Control !
State of Texas ;
1100 West 49th Street i
Austin, Texas 78756 l
t
'
';
Judge, Matagorda County '
Matagorda County Courthouse ;
1700 Seventh Street
Bay City Texas 77414 l
l
Licensing Representative j
Houston Lighting & Power Company ;
Suite 610
Three Metro Center l
Bethesda, Maryland 20814. t
!
h
!
!
- -
.5
_ , -
- . - . . . . . . . . . . . . . . . ..- . . . _ . . .-
e l
i
'
.
- Houston Lighting & Power Company -3- l
i
!
i
l
'
.
Houston Lighting & Power Company ;
'
ATTN: Rufus S. Scott, Associate
General Counsel !
P.0, Box 61867 i
Houston, Texas 77208 [
'
s
.!
i
i
?
f
!
!
!
I
f
1
!
s
t
!
I
.i
l
,
'
>
, j
t
'
a
I
t
I
I
I
i
s
,
!
f
)
)
.1
I
- -. - , - , , , _ . . , . , - - - , -- -. .- - - .__ - - - - - -
. _ - _
'
1
-
,
!
,
Houston Lighting & Power Company -3- DEC - T l993 ,
,
bcc to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan Resident inspector
Section Chief (DRP/A) Lisa Shea, RM/ALF, MS: HNBB 4503
MIS System DRSS-FIPS
RIV File Project Engineer (DRP/A)
R. Bachmann, OGC, MS: 15-B-18 Section Chief (DRP/TSS) ,
STP:DRS
,
!
t
.
RIV:PE:DRP/d C:DRP/Ak k D: 6RP
'~
MASatorius:ww WDJohnsoN ABBehch
12/(,/93 12/(9/93 12/1 /93 ,
_
.
.
.
i
Houston Lighting & Power Company -3- DEC - T 1993 ;
bcc to DMB (IE01) \(
bec distrib. by RIV:
J. L. Milhoan Resident Inspector "
Section Chief (DRP/A) Lisa Shea, RM/ALF, MS: MNBB 4503 '
MIS System DRSS-FIPS '
RIV File Project Engineer (DRP/A)
R. Bachmann, OGC, MS: 15-B-18 Section Chief (DRP/TSS)
STP:DRS
!
,
,
1:
,
1301;2
,
L
k D: 6hP
RIV:PE:DRP/d' C:DRP/Ak
MASatorius:ww WDJohnsod AliB bch
12/y/93 12/b/93 12/7 /93
i
!
i
.. ,
..
-
The Light .
'
c o m p a nySouthp
Texas Project Electric Generating P.Station o. Box 289 Wadsworth. Texas 77483
!= A l ~
"
f'i?) &[f:N% }fll ? j' /p:,m.7,
s
'
-
-
, November 24, 1993
I -
ST-HL-AE-4633 -
000,. INf7 // . File No.: G02.04
. 10CFR2.201
,
U. S. Nuclear Regulator- Commissa h
Attention: Document Control Desk
Washington, DC 20555
&
South Texas Project
Units 1 & 2
Docket No. STN 50-498 & 50-499 !
Reply to Notice of Violation 9330-02
Regarding the Installation of Non-Identical Replacement
Parts Without Proper Engineerino Evaluation and Modification
Houston Lighting & Power has reviewed Notice of Violation 9330-02,
dated October 27, 1993 regarding the installation of non-identical '
replacement parts without proper engineering evaluation and
modification and submits the attached reply.
If there are any questions please contact Mr. S. M. Head at ;
(512) 972-7136 or me at (512) 972-8757.
J. J. Sheppard
General Manager,
Nuclear Licensing
,
DNB/eg
Attachment: Reply to Notice of Violation 9330-02 i
!
)
9 -cu/
Panject Manager on Uchalf of the Participants in the South letas Project ;
'
y , ,+7/_ _
~ ~
r . j j y J "' L/
.
_. -. _ . . _. . . . . . . . . _. .. . . . _ . . _ , .
,
'
,
.,* _
,
ST-HL-AE-4633
.
' Houston Lighting & Power Company
South Texas Project Electric Generating Station File No.: G02.04
Page 2' ;
i
t
i
C:
I
i
!
Regional Administrator, Region IV Rufus S.= Scott l
. U. S. Nuclear Regulatory Commission Associate General Counsel !
611'Ryan Plaza Drive, Suite 400 Houston Lighting & Power Company- :
Arlington, TX 76011 P. O. Box 61867
Houston, TX 77208
Institute of Nuclear Power,
Lawrence E. Kokajko
' Project Manager Operations Records Center ,
..U. S. Nuclear Regulatory Commission 700 Galleria Parkway ,
Washington, DC 20555 13H15 Atlanta, GA 30339-5957 l
t
David P. Loveless Dr. Joseph M. Hendrie ,
f
Sr. Resident Inspector 50 Bellport Lane
c/o U.S. Nuclear Regulatory Comm. Bellport, NY 11713 'I
P. O. Box 910 f
Bay City, TX 77404-910 !
J. R. Newman, Esquire 'D. K. Lacker
Newman & Holtzinger, P.C., STE 1000 Bureau of Radiation Control. l
Texas Department of Health
-
1615 L Street, N.W. r
Washington, DC 20036 1100 West 49th Street
Austin, TX 78756-3189 -l
D. E. Ward /T. M. Puckett
Central Power and Light Company ]
P. O. Box 2121
Corpus Christi, TX 78403 ;
J. C. Lanier/M. B. Lee
l
City of Austin
Electric Utility Department
721 Barton Springs Road f
Austin, TX 78704 ,
i
K. J. Fiedler/M. T. Hardt .;
City Public Service L
P. O. Box 1771
San Antonio, TX 78296 ;
i
!
.
I
mm,um.m
1
m . - - - - - ,
. _ . . . _ . _ . _ _ ..
. .. ,
!
. ;
Attachment ;
ST-HL-AE-4633
'
Page 1 of 3 j
~
!
!
I. Statement of Violation-
Technical Specification 6.8.1.a states, in part, that !
written procedures shall be established, implemented, and !
maintained including the applicable procedures recommended i
in Appendix A of Regulatory Guide 1.33, Revision 2, !
February 197 8. Item 9.a of Appendix A states, in part, !
" Maintenance.that can affect the performance of safety- l
related equipment should be properly preplanned and
performed in accordance with written procedures, l
documented instructions, or drawings appropriate to the
circumstances." A note to Step 6.9.2.A of Operations
Engineering Procedure OEP 6.03Q, Revision 7, " Design
Document Change Control," implements.this requirement for
modification work and states, " Items tagged with ECNP/ MOD ,
Hold tag shall not be installed until a ECNP/ MOD package !
'
is issued authorizing the use of a given part."
i
Contrary to the above, on or about June 7, 1993,
maintenance personnel installed a replacement reverse ,
power relay, which had been tagged with an engineering i
change notice / modification package (ECNP/ MOD) hold tag, in j
'3
the Standby Diesel Generator 23 control panel, without an
ECNP/ MOD package issued authorizing its use.
I
This is a Severity Level IV violation. (Supplement I) j
(499/9330-02) j
j
II. Houston Lichtinc & Power Position: j
1
,
Houston Lighting & Power (HL&P) concurs that the violation ;
occurred. )
i
III. Reason for Violation: f
i
The non-safety-related replacement relay was installed J
without modification documentation because the on-shift ,
engineer whc was contacted regarding the ECNP/ MOD Hold Tag -!
attached to the relay. improperly responded to maintenance j
'
that the associated Document Change Notice (DCN).was ;
- sufficient authorization to proceed with installation. -)
The cause of the improper response was a lack of training ,
l
'
of the on-shift engineer who was contacted.
l
..
)
'
,
b* .4 * - '.
,. . ... .. - . - .. . .
If
,8
Attachment
ST-HL-AE-4633
- Page 2 of 3
HL&P also determined during the investigation of this
violation that a sepatale problem existed in that'the
applicable vendor wiring diagram (contained in the SDG
Generator Control Panel Instruction Manual) did not match
the original reverse power relay configuration. The
vendor wiring diagram showed the relays wired for A-B-C
phase rotation, but the relays had been internally
modified to accommodate the C-B-A rotation. 'This
situation caused the reverse power trips which occurred
during post maintenance testing of Diesel Generator 23.
The most likely cause was a failure on the part.of the
equipment supplier to properly document the internal
modification to the relay. This problem is not reportable
under 10 CFR Part 21.
IV. Corrective Actions:
The corrective actions listed below address the violation,
the separately identified internal wiring problem, and the
overall " Engineering Hold" program enhancements.
1. Appropriate modification documentation has been
completed for the reverse power relay in Standby
Diesel Generator 23.
2. The engineers currently on-shift have been trained on
the programmatic aspects of the ECNP/ MOD' Hold Tag
program. The engineers who are not currently on-
shift will be trained upon their return to shift
duties. The remaining engineers will be trained by-
December 10, 1993.
3. The En-Tronic Control System Instruction Manual
(4041/8041-01009-CEO) for the Standby Diesel
Generator Control Panels has been amended to correct
the wiring diagram for the reverse power relays.
4. A training bulletin has been issued to appropriate
pcrsonnel in the Maintenance Department to explain
and emphasize the importance of the Engineering
Notification and ECNP/ MOD Hold. Tagging program. This
bulletin also emphasized the importance of
maintaining a questioning attitude when performing
work.
5. Engineering will review the electrical power
distribution systems at STP to determine if there are
other negative phase sequence relays which may be
affected. This action will be completed prior to
Mode 4 on either unit.
IR-93 d)-324.001
. > _ . . _ . - _ -. - __ .
- _ , .
'
.-
.*
.i t
Attachment
ST-HL-AE-4633 !
~
Page 3 of 3 'i
I
.
I
6. Procedures and databaras applicable to the process of i
ensuring engineering totifications and engineering i
holds on material will be modified as follows: !
,
a. To make the procram easier to anderstand and ,
-use, OPGP03-ZG-0001, " Material Control," has :
!
been revised to specify.the key requirements of
the overall program. ;
b. To clearly identify when engineering involvement :
is required, the Material Management System !
(MMS) database has been revised to support the
designation of HL&P Part Numbers (class bins) as j
requiring " Engineering Notification," or on :
" Engineering Hold." [
t
7. An integrated Replacement Parts program will be
developed to enhance.the overall engineering j
notification and engineering hold program, improve
the plant personnel understanding of the process and 'l
provide timely support to Operations and Maintenance. !
'
This action will be completed by May 31, 1994.
f
V. Date of Full Compliance: ,
HL&P is in full compliance. ;
.
VI. Additional Information: j
During the testing of the replacement relays, improper. 'l
polarity (due to the difference in phase rotation between .
the originally installed relay and that assumed by the !
test procedure, which was based upon the vendor wiring l
diagram.) was noted by the technician, but not identified j
as a problem. The calibration procedure applicable to the
reverse power relay has been revised to account for the ' ,
proper polarity. As stated in the corrective-actions i
above, a training bulletin has been issued that emphasized j
the importance of maintaining a questioning attitude. !
,
'