Text
?
y'
,3 TIIE CINCINNATI GAS & ELECTRIC COMPANY ss CIN CIN N ATI.O HIO 4 52ol July 26, 1982 QA-1899 E. A, BORG MANN SEN60R vnCE 9RLS* DENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J. G. Keppler Regional Administrator RE:
WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 10CFR50.55(e) - ITEM M WELDS REJECTED UPON RADIOGRAPHIC REVIEW - DOCKET No. 50-358 CONSTRUCTION PERMIT NO. CPPR-88, W.O. #57300 JOB E-5590, FILE NO. NRC-8, M-22 Gentlemen:
This is a second interim report on a 10CFR50.55(e) event which was reported verbally to Mr. F. T. Daniels, Resident Inspector, on May 2, 1980.
As mentioned in our previous interim report, QA-1312, dated Msy 29,1980, in October 1979, the CG&E Company initiated a review of all field radiographs of piping welds. This review was completed in May, 1980. However, CG&E has recently experienced difficulties with preparing a final report regarding this review. The difficulties encountered are as follows:
1.
Lack of documented evidence that the personnel performing the review were qualified at the time in accordance with CG&E certification program.
2.
Lack of a documented program which details the scope of the review program and the methods for implementation.
3.
Lack of documented evidence that the review of radiographs was performed in accordance with the applicable approved procedures and/or codes and standards.
4.
Lack of documented evidence that appropriate corrective action has been taken 63garding those welds rejected during this review.
t
/
8208090263 820726 PDR ADOCK 05000358 AUG 21982 S
& 19
, q's
.o Mr. J. G. Keppler Regional Administrator Region III July 26, 1982 - QA-1899 Page 2 As a result of these difficulties, a final report cannot be issued at this time. A documented program for this review process will be initiated by CG6E and the radiographs, as appropriate, will be re-reviewed by, or under, the direction of CG&E Quality Assurance.
This re-review should be completed by November 15, 1982, at which time a final report will be submitted.
We trust the above will be found acceptable as an interim report under 10CFR50.55(e).
Very'truly yours.
TIIE CINCINNATI CAS & ELECTRIC COMPANY
}&==
E. A. BORGMANN SENIOR VICE PRESIDE!ff FKP:plc cc: NRC Of fice of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector Attn:
W. F. Christianson NIC Zinmer Project Inspector Pegion III