s tC) 22 Docket No.:
50-395 License No.: NPF-12 South Carolina Electric & Gas Company ATTN: Mr. John L. Skolds Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- V. C. SUMMER This refers to the meeting conducted at your request at the NRC Region II Office in Atlanta, Georgia on November 16, 1993. The purpose of the meeting was to discuss Summer's plant status and current issues, its engineering training /qualifica. ion program and organization changes, and the direction and i
initiatives engineering plans.
It is our opinion that this meeting was beneficial in that it provided us with a better understanding of the licensee's engineering organizations, their i
respective responsibilities, goals and initiatives planned.
{
Should you have any questions concerning this letter, please let us know.
i Sincerely, i
kLv
, b;1 i
u
[
347,-
,qk.N k&L 7c -
1 s
is W. Mers ff, Direc or Division of Reactor Projects i
Enclosures.
1.
List of Attendees 2.
Presentation Summary cc w/encls:
t R. J. White Nuclear Coordinator t'
S.C. Public Service Authnrety Virgil C. Summer Nuclear Station P. O. Box 88 (Mail Code 802)
Jenkinsville, SC 29065 (cc w/encls cont'd:
See page 2) 9312140103 931122 PDR ADOCK 05000395
[
P ppy
r.
4 NOV 2 21993 South Carolina Electric &
2 Gas Company (cc w/encls cont'd)
G. J. Taylor, General Manager Nuclear Plant Operations South Carolina Electric & Gas Co.
Virgil C. Summer Nuclear Station P. O. Box 88 (Mail Code 300)
Jenkinsville, SC 29065 J. B. Knotts, Jr., Esq.
Winston and Strawn 1400 L Street, NW Washington, D. C.
20005-3502 Chairman Fairfield County Council P. O. Drawer 60 Winnsboro, SC 29180 Max Batavia, Chief Bureau of Radiological Health S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Mr. R. M. Fowlkes, Manager Nuclear Licensing and Operating Experience South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 bcc w/encis:
G. F. Wunder, NRR F. Cantrell, Ril Document Control Desk NRC Resident Inspector
- U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenkinsville, SC 29065 Z.-Tolsme.,,
baf RII:DRP Rll:DRP RII:DRP RI RP
%W Y
'l>n RWright:tj FCantrell DVer elli J ohnson 11/6/93 ll/g/93 11/[/93 ll/Lk/93
t ENCLOSURE I NRC Attendees:
S. D. Ebneter, Regional Administrator, Regior, II (RII)
A. F. Gibson, Director, Division of Reactor Safety (DRS), RII D. M. Verrelli, Chief, Reactor Projects Branch I, DRP, RII G. F. Wunder, Project Manager, Office of Nuclear Reactor Regulation F. S. Cantrell, Chief, Section IB, DRP, RII J. L. Shackelford, Reactor Engineer, Operational Programs Section, DRS, RII Licensee Attendees:
M. Quinton, General Manager, Engineering Sersices R. Waselus, Manager, Systems and Performance Engineering L. Hipp, Manager, Materials and Procurement M. Browne, Manager, Design Engineering i
i i
I
< m o es< 2 Purpose of Visit Plant Status 1
Organization Changes i
Engineer TraIining j
t i
Direction and Initiatives
. Systems and Components
. Materials and Procurement
. Design
l PLANT STATUS e
80% RATED THERMAL POWER e
198 DAYS ON-LINE i
PRESENT PLANT ISSUES l
e REACTOR POWER IS BEING MAINTAINED AT 80%
RTP TO CONSERVE FUEL l
1 e
REACTOR COOLANT PUMP "B" NUMBER ONE 1
SEAL LEAKOFF ELEVATED AND STABLE I
j l
i t
4 9
/
_ - _ ~
g
- - - ~
1 1
4 9
/
0 4
1 9
/
9 4
9 9
/
/
9 49
/
7 4
9
/
7 4
9 4
/
9
/
1
/
6 6
49
/
5 Y
G 4
9 E S 4
/
T Y
A A R
4 c
T D 9
4
/
SE 9
1
/
/
NA 3
3 I T E.
T U 4
TA.-
A 9
O 2
/
R D
EO P N 4
O H 9
B i
T EI 1
LW C
9 3
Y
/
C 12 3
9
/
1 1
3 9
9 3
/
/
1 0
/
0 1
1 3
9
/
9 3
9
/
8 3
9
/7 3
9 3
/
6 9
/0_
3 2
9
/
0_
/
. - - ~
d
- ~ - -
- - ~
- - - ~
- - - ~
=
5 1
9 8
7 1
O 1
6 5
4' 3
2 1
1 M.
F POWER FRACTI ON N
O O
4 9
/
- - m W
1 k
1 h
4 9
4
/
0
^
9 9
h 1
/
/
4 9
h 4
9 9
/
/
9 l
9 1
l
/
8 l
49
/
k 7
l l
4 9
/
k 7
4 k
9 4
/
9 1
/
/
6 6
h h
49
/
5 Y
4 G
9 E S h
4
/
T Y A A l
RT D h
49 SE
/
GG 3
NA E
T 4
T IT U 9
A A
/
O 2
D-REO h
P N 4
O 9
H
/
8 T 1
EILW C
3 9
Y
/
2 C
3 1
9
/
3 1
9
/
/
1 1
4 1
1 3
9 3
/
9
/
1 0
/
1 0
1 3
9
/
9 3
9
/
8 3
9
/7 3
9
/
3 -
6 9
//-
0 3
2 9
/
0
. W e
4
~
- - ~ ~
u e
- M e
- 4 6 e\\
- e p
m s
R p
u 5
1 9
8 7'
6 5
4 3
2 1
1 1
M 1
F.
N _.
POWER FRACTION
i.
+
4 General Manager, Engineering Services M. D. Quinton Team Leader, Nuclear
- Manager, Manager, Manager, Systems i
Fuel Management Design Engineering Materials and and Component Procurement Engineering B.J. Johnson M. N. Browne L C. Hipp R. J. Waselus i
f i
1 I
i
- }.
l l
l 1
i b
5 1
Engineer Training Curriculum 'A' - Broad Overview of Nuclear Plant Administration; 4 weeks 98% complete Curriculum 'B' - Detailed Systems Training; 9 weeks 58% complete Curriculum 'C' - Principles of Reactor Operation, Heat Transfer and Plant Controls; 8 weeks 38% complete Curriculum 'D' - Detailed Plant Operations; 9 weeks l
(includes 2 weeks on simulator) 30% complete Engineer Qualification Program ACAD 91-017, ' Guidelines for Training and Qualification of Engineering Support Personnel' ENGINEER QUALIFICATION GUIDES:
e Design e
System and Component e
Procurement e
Procurement Quality e
Reactor e
Licensing
9 SYSTEMS & COMPONENT ENGINEERING e ORGANIZATION AND RESPONSIBILITIES e FUTURE DIRECTION e CURRENTISSUES 1
9 4
6 0
m m
Z w
e rw v
K w
~s z
w w
2 22 4
W Z
C V
w%
^
O-U W
Z m
c H
m.
w O m.
2<
>w YHZw J
2 9 Z 4,-
<w 4
v<-
w, w
sa
- o. *-
"5 Z
7 wn
)m2 O
"0 k
1 w
m O
e n.
g&
n.
7 E
u 2
8 O
O O
v e
v m
9 Z
O w
E m
Z m
m 00 w
w g
w w
cmZ O Z Z
W $ -l" C
Q m-O Ow SO
< uw 55
+5 2
Z sg-9
- o. m DE w
s-m w
i w
+
H M
w m
m m
i O
w H
cr a,
v e w
2 e
w w e
E e
0" O w
m w
4 m
w 2w w
- o. a m
o sa h
W I
w N
N g
am 1
32 w
m s
- w
+
H m
\\
+
w W
m I
{
1
^
PLANT ENGINEERING SERVICES I
TOP PLANT PROBLEM SYSTEM WALKDOWNS NPRDS I
SYSTEM IMPROVEMENTS I
THERMAL PERFORMANCE GROUP l
ENGINEERING REVIEW BOARD MANAGEMENT PROCUREMENT llCENSING l
PREDICTIVE M AINTENANCE TEAM I
l OPERATING EXPERIENCE l
MAINTENANCE RULE l
MAINTENANCE RCM OPERATION I
i 1r1 P1P1P1 P1 P1 F1 Pt 1 P1P1 P1 P1P1 P1 P SYSTEM ENGINEERING FOCAL POINT /lNTERFACE BETWEEN PLANT AND ENGINEERING SERVICES E
I I
I I
I
> DEslGN CHANGE REQUEST l
OPERATION DIRECTION l
) TECH MANUAL REVISIONS MAINTENANCE DAY TO DAY ASSISTANCE 4 l
> ERB PRESENTATIONS g
REE DISPOSITIONS 1
l SYSTE M NCN DISPOSITIONS l
DESIGN BASIS DOCUMENT u
PROCEDURE REVIEWS & CHANGES 4 l
" VERiflCATION/ CHANGES PLANT PROBLEM RESOLUTIONS 4
I I
I I
4 m
4 COMPONENT ENGINEERING - PROVIDES HIGH LEVEL OF TECHNICAL EXPERTISE IN SPECIFIC AREAS OF COMPONENT SPECIALITY CROSSING SYSTEM BOUNDARIES.
I INPUTS 1.
COMPONENT PERFORMANCE 2.
- 3. CHAMPS 4.
MAINTENANCE AND OPERATIONS 5.
INDUSTRY GROUPS (NIC, AOV USERS GROUP, ETC.)
6.
OPERATING EXPERIENCE 7.
PROCUREMENT 8.
RCM 9.
MAINTENANCE RULE
- 10. TRAINING I
COMPONENT ENGINEERING (CONT'D)
OUTPUTS i
1.
NCN DISPOSITIONS 2.
ROOT CAUSE EVALUATION (ES-508 AND SAP-900) 3.
HEAT EXCHANGER PROGRAM 4.
RCM LIVING PROGRAM 5.
VALVE PROGRAMS i
6.
OPTICALALIGNMENTS 7.
TRACKING AND TRENDING 8.
ETBT'S 9.
VALVE PACKING 11ANUAL 10.
P.TI PROGRAll 11.
11AINTENANCE RULE LTIPLE11ENTATION - LONG TER31 12.
EROSION / CORR.OSION PROGRAll l
13.
SCAFFOLDING / EXCAVATION EVALUATION l
11.
11AINTENANCE WORK PRACTICE PROCEDURES 15 LUBE 11 ANUAL j
10.
SUPPORT OF ISI/IST PROGRAll l
l l
I
j 4
l e
PREDICTIVE MAINTENANCE TEAM 1
q i
- 1. VIBRATION ANALYSIS j
- 2. INFRARED THERMOGRAPHY
- 3. MOTOR CURRENT SIGNATURE ANALYSIS
- 4. OIL ANALYSIS
- 5. EDDY CURRENT EXAMINATIONS
)
e DATA IS TAKEN BY TECHNICAL SERVICES GROUP (EXCEPT FOR THERMOGRAPHY). TEAM DEVELOPES j
THE ENGINEERING ANALYSIS OF DATA AND MAKES i
j RECOMMENDATIONS FOR PROBLEM RESOLUTIONS.
PRIMARILY TO THE SYSTEM OR COMPONENT ENGINEER.
1 o
DEVELOP AND TEACH NEW MAINTENANCE TECHNOLOGY. (OPTICAL AND LASER ALIGNMENT) a l
i i
SPECIAL PROJECTS TEAM e
PROJECT MANAGEMENT AND COORDINATION OF j
" MAJOR" PROJECTS ASSIGNED TO GROUP i
i 9
RCM, MAINTENANCE RULE, LIFE CYCLE M ANAG EMENT, ETC.
l
\\
O WILL UTILIZE INTERNAL (SCE&G) AND EXTERNAL
~
(CONTRACTORS) RESOURCES AS REQUIRED i
e WILL INTERFACE WITH ALL PLANT GROUPS AND MAY CONTAIN PEOPLE FROM OTHER NOD j
DEPARTM ENTS.
i
-i 9
DEPARTM ENT WORK TRACKING, PROCEDU RE DEVELOPMENT AND MAINTENANCE
'l i
l l
i J
l CURRENTISSUES 4
1.
OPEN CYCLE COOLING WATER EVALUATION TEAM i
i I
e OPEN CYCLE COOLING / RAW WATER SYSTEMS (SW, CC, CW, FS, TC, AC, FI, )
t i
e TEAM OF 3 SYSTEM AND 2 DESIGN ENGINEERS.
e TEAM COMMITTED FULLTIME FOR S MONTHS.
1 e USING KEPNER-TREGO DECISION ANALYSIS TECHNOLOGIES TO SYSTEMATICALLY DETERMINE PROBLEM AND FIXES.
i I
i e HAVE ISSUED TWO REPORTS TO DATE.
e CURRENTLY WORKING ON CONCEPTUAL DESIGNS / COST EVALUATIONS FOR TOP RANKED I
ALTERNATIVES.
e BENEFITS - THE BEST, MOST COST EFFECTIVE RESOLUTIONS TO RAW WATER SYSTEM PROBLEMS.
)
CURRENT ISSUES (CONT'D) l 1
2.
RELIABILITY CENTERED MAINTENANCE (RCM) e RCM ANALYSIS ON 102 PLANT SYSTEMS COMPLETED.
t e COMPLETE RCM/FMEA ON 32 SYSTEMS.
l l
e SECONDARY BENEFITS ANALYSIS ON 69 SYSTEMS.
[
e RCM LIVING PROGRAM DEVELOPMENT COMPLETE THIS MONTH. PLAN FOR FULL IMPLEMENTATION BY THE END OF 1993.
e RCM RECOMMENDATIONS.
)
i 9
SYSTEMS IMPLEMENTED 26 SYSTEMSIN PLANNING AND SCHEDULING l
1 SYSTEM IN SYSTEM ENGINEERING REVIEW 25 SYSTEMS NO CHANGE
{
61 TOTAL 4
i i
CURRENT ISSUES (CONT'D) i I
3.
MAINTENANCE RULE e RCM COMPLETION HAS GIVEN US " HEAD START" ON IMPLEM ENTATION.
e DEVELOPMENT OF IMPLEMENTATION PLAN IN PROGRESS. SCHEDULED COMPLETION IS BY FEBRU ARY 1994.
e WILL USE EXISTING PROGRAMS TO THE EXTENT POSSIBLE.
e V & V SYSTEMS TEST RUN COMPLETE PRIOR TO RF-8.
e CYCLE 8 & 9 WILL BE USED AS BASIS FOR PERFORMANCE EVALUATIONS REQUIRED BY RULE.
i
CURRENT ISSUES (CONT'D) 4.
SALEM ROD EVENT 1
e SYSTEM ENGINEERING PARTICIPATED AS PART OF THE WOG TEAM IN DEVELOPING INDUSTRY RESPONSE IN THE TESTING AND PHYSICAL EQUIPMENT UPGRADES ASPECTS.
i
~
5.
RCP SEAL LEAKAGE e SHOWN DEFINITE TEMPERATURE DEPENDENCE.
e BELIEVE WATER CHEMISTRY PLAYS ROLE.
i e STABILIZED AT== 4 GPM.
i i
r l
O e
O T
N E
E C
M E
N R
E E
U m.
m.
R I
m U
R T
m R
E U
C 4
E m.
P F
M O
X E
u R
E M
P H
Y T
u_
2 U
D B
R S
N D
O C
A m_
E F
S Z
D V
L I
A N
E A
S I
I R
G O
E T
R P
A O
M llll
Organized by Experience Recognized the inadequate control of o
aurchased material, equipment, and services ay vendors and took proactive compensatory action l
e Developed a Material Management System that could handle " Nuclear" specific requirements Engaged engineering in the audit process.
o prior to PBSA Performed CTF evaluations and assembly e
breakdowns as part of PTR effort Structured to eliminate organizational e
barriers
Organized by Experience
~
EXAMPLE: Excerpt from 1984 letter to Colt as a result of audit identified discrepancies.
j Colt is expected to:
q
" Establish procedures for performing the dedication of Essentialto Function parts in accordance with the means of dedication as determined by engineering."
The letter further stated that:
"The term dedication as used in our previous conversations and in the items listed above is defined as: the process whereby systems, i
i components, parts or services are transformed from unqualified commercial status to quality i
verified and traceable status for use in Nuclear Safety Related applications. This dedication confirms the correct form, fit and function for the application."
1
Materials and Procurement MANAGER SUPERVISOR SUPERVISOR INVENTORY SUPERVISOR SUPERVISOR PROCUREMENT ENGR.
PROCUREMENT QUAllTY MANAGEMENT MATERIALS STATION PROCUREMENT
& RECEIVING INSP.
TEAM
& CONTRACTOR SERVICES Sr. Engineer Engineers Inventory Specialists Storekeepers Procurement Specialists Engineers inspectors Material Specialist PROJECTTEAM Engineer Speciali;ts Manufactur;ng Surveillance Specialists Engineer Others as assigned
~
... - ~
THE PRESENT i
o Focus on Job
Purpose:
l Not just task performance i
e Aggressively Seeking The Right Answer-Not the easy answer j
i Receiving Inspection Lab Capabilities e
FUTURE CHALLENGES e
UNAVAILABILITY OF NUC/. EAR SAFETY RELATED MATERIAL Commercial Dedication Equivalency Evaluations t
t
't i
e MAJOR COMPONENT REPLACEMENT DUE TO DEGRADATION l
I i
l l
l V. C. SU M MER l
DESIGN ENGINEERING L
i l
t M. N. BROWNE f
i
)
i i
i f
4
c i
DESIGN ENGINEERING
~
't CONFIGURATION CONTROL GOAL: A/E INDEPENDENCE P
e DESIGN BASIS DOCUMENTS i
e DESIGN BASIS CUSTODY e
CONFIGURATION MANAGEMENT PLAN e
TECHNICAL REVIEW / TURNOVER 1
4 i
r il f
~
i DESIGN ENGINEERING i
i PROCESS ASSESSMENT i
e USER / CUSTOMER INTERVIEWS i
1 o
PROCESS FLOW CHARTS e
EVALUATION TEAMS INCLUDE USERS i
e OPTIMlZED PROCESS i
e IMPLEMENTATION PLANS I
l 4
I t
l DESIGN ENGINEERING
~
i CHALLENGES 1
I e
S/G REPLACEMENT e
PLANT SUPPORT / CUSTOMER SERVICE i
e LONG TERM CONFIGURATION MANAGEMENT o
CURRENTISSUES 1
STRATEGIES i
e ORGANIZATION e
PLANNING e
SELF EVALUATION e
PLANT MODIFICATIONS
a e
a O
e DESIGN ENGINEERING NEW ORGANIZATION MANAGER DESIGN ENGINEERING SPECIAL PROJECT DE DE DE SUPERVISOR ENGINEERING SUPERVISOR SUPERVISOR CONFIGURATION ANALYSIS ELECTRICAL /
MECHANICAL /
CONTROL TEAM i&C CIVIL /
STRUCTURAL SR. ENGINEER SR. ENGINEER SR. ENGINEER SR. ENGINEER ENGINEER ENGINEER ENGINEER ENGINEER SPECIALIST SPECIALIST SPECIALIST SPECIALIST
i l
DESIGN ENGINEERING CURRENT ORGANIZATION MANAGER DESIGN ENGINEERING PLANT PLANT PLANT PLANNING ASSOCIATE SUPPORT SUPPORT SUPPORT AND MANAGER ELECTRICAL I&C MECHANICAL SCHEDULING DBE SENIOR SPECIALISTS SPECIALISTS SPECIALISTS ENGINEERS ENGINEERS
~. -
m DESIGN ENGINEERING CURRENTISSUES e
FIRE PROTECTION SYSTEM UPGRADE e
IPE RESULTS 51 AND CCW PUMP COOLING r
RCP THERMAL BARRIER COOLING e
MOTOR OPERATED VALVES 7
COMPLETE GL 89-10 COMMITMENT e
o LP TURBINE ROTOR REPLACEMENT e
IPEEE l
l
.