Confirms Completion of Items 1 & 2 of Requested Actions for Operating Reactors Specified by NRC Bulletin 90-001, Suppl 1
ML20058H704
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/06/1993
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C311-93-2159, IEB-90-001, IEB-90-1, NUDOCS 9312130190
Download: ML20058H704 (1)


Text

.

GPU Nuclear Corpwation d Nuclear

en:r38'

)

i" Forked River, New Jersey 08731-0388 609 971-4000 Wnter's Direct Dial Nurnber.

(717) 948-8005 I

December 6, 1993 C311-93-2159 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Three Mile Island Nuclear Station Unit I, (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Completion of Requested Actions from NRC Bulletin 90-01, Supplement 1: Loss of Fill-Oil in Transmitters Manufactured by Rosemount This letter confirms that GPUN has completed Items 1 and 2 of the requested actions for Operating Reactors specified by NRC Bulletin 90-01, Supplement 1.

As of October 28, 1993 two Rosemount Model 1153 Series B transmitters, MU24A-l FT and MU24B-FT were replaced. The units were classified as: manufactured prior to July ll,1989, in service in high pressure safety related applications but not installed in reactor protection trip systems, ESF actuation systems or ATWS applications. Although, data evaluation provided confirmation that the transmitters continued to perform their intended safety functions, the option to replace these transmitters was chosen over that of continuing to perform enhanced surveillance at a quarterly frequency.

Sincerely, T. G. Brott ston Vice President & Director, TMI-1 WGH cc: Administrator, Region 1 9312130190 931206 TMI-l Senior Project Manager

{DR ADOCK 05000289

/

TMl Senior Resident Inspector PDf GPU Nuclear Corporanon is a subsd.any of General Pubhc Ubhbes Corporabon

.