ML20058H697
| ML20058H697 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/30/1982 |
| From: | Maier J ROCHESTER GAS & ELECTRIC CORP. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| REF-SSINS-6820 IEB-82-02, IEB-82-2, NUDOCS 8208090048 | |
| Download: ML20058H697 (2) | |
Text
(m~\\
(_
LJ L.,i
$$s'f ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.14649
....,,..m,..
, ~ra.no July 30, 1982 Mr. 1:onald C.
llaynes, Regional Administrator U.
S.
1;uclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406
Subject:
IE Bulletin No. 82-02 Degradation of Threaded Fasteners In The Reactor Coolant Pressure Boundary of PWR Plants R.
U.
Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
Dear Mr. !!aynes:
In response to NRC IC Bulletin No. 82-02, action item #5, attached please find the report you requested in action iten 43.
This report identifies those bolted closures of the Reactor Coolant Pressure Boundary (RCPB) within the scope of this bulletin that have experienced leakage since original plant start-up and the history of the use of fastener lubricants and injection sealant materials for these bolted closures.
In accordance with action item #4, a report will be forwarded 60 days following our 1983 Refueling Outage for the remaining action items of this bulletin.
Very truly yours, W,<
E.
Maier Attachment Subscribed and sworn to me on this 30th day of July 1982.
/
+
/
/66^ d (uCc LYNN I. HAUCK NOTARY PUBUC State cf N.Y., Menroe County W Comm is<on Expres March 30.19E'/
e20eo9oo4a e2o7ao 6 d PDR ADOCK 0500o244 o
7 p,
!.u, '
!, / >
Attachment to IE Bulletin No. 82-02 1.
Component 1A Reactor Coolant Pump Main Flange Date of Leakage 1976 Corrective Action Replaced gaskets Fastener Lubricant Neo-lube Injection Sealant None used 2.
Component IB Reactor Coolant Pump Main Flange Date of Leakage 1970 Corrective Action Replaced gaskets Fastener Lubricant Neo-lube Injection Sealant None used 3.
Component Pressurizer Manway Date of Leakage 1974, 1976, 1978 Corrective Action Replaced gaskets
- Fastener Lubricant Fel-Pro C-5A Injection Sealant None used 4.
Component MOV-700, RHR Suction from RCS Date of Leakage 1978, 1979, 1980, 1981 Corrective Action Seal welded; 1981**
Fastener Lubricant Fel-Pro C-5A Injection Sealant Furmanite; 1978, 1979, 1980 5.
Component MOV-721, RHR Return to RCS Date of Leakage 1976 Corrective Action Seal welded; 1976 Fastener Lubricant Neo-lube Injection Scalant None used Currently RG&E replaces this gaoket each refueling outage All studs of this valve were replaced daring the 1981 Refueling outage and this valve was seal welded.
No significant corrosion was identified on the removed studs of this valve.
L