Forwards SE Re Plant Unit 1 IST Program Relief Requests for Pumps & Valves
ML20058H608
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/02/1993
From: Stolz J
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20058H609 List:
References
GL-89-04, GL-89-4, TAC-M87231, NUDOCS 9312130149
Download: ML20058H608 (4)


Text

f ga a'og

'fo

.k UNITED STATES

[ kT.lf j

NUCLEAR REGULATORY COMMISSION

im y WASHINGTON, D.C. 205E0001

[,[,,

December 2, 1993 Docket No. 50-245 Mr. John F. Opeka Executive Vice President, Nuclear Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT 1 - INSERVICE TESTING PROGRAM RELIEF REQUESTS FOR PUMPS AND VALVES (TAC N0. M87231)

By lettcr dated August 16, 1993, Northeast Nuclear Energy Company (NNECO) provided the NRC staff with their resolution of the outstanding items r

regarding the Inservice Testing (IST) Program at Millstone Unit 1.

By letter dated February 18, 1993, the staff issued its safety evaluation in response to NNEC0's submittal of Revision 5 of the Millstone Unit 1 IST Program and associated relief requests.

In the NRC's February 18, 1993, safety i

evaluation, the staff requested NNECO to provide additional information for several of the relief requests. NNEC0's August 16, 1993, submittal provided resolution of the outstanding items regarding Revision 5 of the Millstone Unit 1 IST Program. The staff's review of NNECO's submittal is provided in the.

enclosed safety evaluation.

The Code of Federal Regulations,10 CFR 50.55a, requires that inservice testing of certain ASME Code Class 1, 2, and 3 pumps and valves be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda, except where relief has been granted or proposed alternatives authorized by the Commission pursuant to 50.55a(f)(6)(1),

(a)(3)(i), or (a)(3)(ii). Guidance on acceptable alternatives to Section XI requirements was provided in Generic Lett2r 89-04, Guidance on Developing Acceptable Inservice Testing Programs, for certain aspects of IST.

The staff concludes that relief as evaluated and modified in the enclosed safety evaluation will provide reasonable assurance of the operational readiness of the pumps and valves to perform their safety-related functions, provided NNECO makes the applicable modifications described in the relief requests during refueling outages 14 (1994) and 15 (1996).

Relief Request V-12 is not required to verify closure of the applicable valves by the proposed method.

Depending on whether an exemption from 10 CFR Part 50, Appendix-J is received, the relief request should be deleted or modified at a later date.

The staff has determined that granting relief pursuant to N

h0 & Q i

9312130149 931202 PDR ADOCK 05000245 l

i P

pyg

Mr. John F. Opeka December 2, 1993 10 CFR 50.55a(f)(6)(1) is authorized by law and will not endanger life or property, or the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon NNECO that could result if the requirements were imposed on the facility.

Sincerely, Original signed by:

John F. Stolz, Director Project Directorate I-4 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation tnclosure:

As stated cc w/ enclosure:

See next page Distribution 1 Docket File NRC & Local PDRs PD I-4 Plant T. Murley/F. Miraglia J. Partlow E. Rossi J. Lieberman S. Varga J. Calvo J. Stolz S. Norris J. Andersen 0GC E. Jordan G. Hill (2)

ACRS (10)

OPA OC/LFDCB V. McCree, EDO L. T. Doerflein, RI orncE LA:PDI-4 PM:PDI-4 /

DDDI-4 OGCd[

Sil0N7 JAnderseM JStMr

- !_7Io. k NAME DATE

/ l //O/93 1I/lOf93

[ /IO/93

/@/ N93

/ /

OFFICIAL RECORD COPY Document Name:

G:\\ANDERSEN\\87231

F~

i:

i Mr. John F. Opeka December 2, 1993 10 CFR 50.55a(f)(6)(i) is authorized by law and will not endanger life or property, or the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon NNECO that could result if the requirements were imposed on the facility.

Sincerely, M.

Jo$ F. Stolz, Directcy Prdject Directorate I' ivision of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

1 See next page

't M

n

i 3

Mr. John F. Opeka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit 1 l

t cc:

?

Gerald Garfield, Esquire R. M. Kacich, Director Day, Berry and Howard Nuclear Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 l

Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President J. P. Stetz, Vice President Nuclear Operations Services Haddam Neck Plant Northeast Utilities Service Company Connecticut Yankee Atomic Power Company Post Office Box 270 362 Injun Hollow Road l

Hartford, Connecticut 06141-0270 East Hampton, Connecticut 06424-3099 Kevin T. A. McCarthy, Director Regional Administrator Monitoring and Radiation Division Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission 79 Elm Street 475 Allendale Road Post Office Box 5066 King of Prussia, Pennsylvania 19406 Hartford, Connecticut 06102-5066 Allan Johanson, Assistant Director First Selectmen Office of Policy and Management Town of Waterford Policy Development and Planning Division Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Vice President P. D. Swetland, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station t

Northeast Nuclear Energy Company c/o U.S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 513 Waterford, Connecticut 06385 Niantic, Connecticut 06357 H. F. Haynes, Nuclear Unit Director J. M. Solymossy, Director h

Millstone Unit No. 1 Nuclear Quality and Assessment Services Northeast Nuclear Energy Company Northeast Utilities Service Company Post Office Box 128 Post Office Box 270 Waterford, Connecticut 06385 Hartford, Connecticut 06141-0270 Nicholas S. Reynolds Winston & Strawn 1400 L Street, NW i