URF0: DLJ ll0V 0 1 1990 Docket No. WM-64 040WM064840E U.S. Department of Energy ATTN: Mark L. Matthews, Project Manager Uranium Mill Tailings Project Office Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115

Dear Mr. Matthews:

Our letter of October 31, 1990, was inadvertently sent to you without the appropriate enclosure. The summary of the Project Interface Documents for the Lakeview, Oregon, UMTRA site is therefore enclosed with this letter.

We apologize for any inconvenience this oversight may have caused you.

Should you have any questions, please contact R. Gonzales or D. Jacoby of my staff on FTS 776-2805.

Sincerely, W W By R. E.' HALL Ramon E. Hall Director

Enclosure:

As stated cc:

M. Abrams, 00E S. Hamp, DOE bec:

iPDR/DCS URF0 r/f ABBeach, RIV

.. i r LLO Branch, LLWM

,;d DLJacoby RCPD, OR WM64/840E/DLJ/90/11/01/L PM:URF0h DD:URF0 DLJacoby/dh EFHawkins y

\\\\ / \\'/90

( g./y/90 9011140254 901102

\\

PDR WASTE WM -64 PDC

i a-

..e I

110V 6 8 1990--

SlM4ARY OF PROJECT INTERFACE DOCLMENTS ISSUED FOR LAKEVIEW UMTRA PROJECT l

PID No.

Class Date Section Action / Issue 13 Affected j

6/12/86 02832

3. 0 Delete / Fencing-1 6/23/86 02200 3.2.B.2.b Revise / Seasonal Shutdowns

-1 2

3.4.0.2.a Revise / Fill-QC Program-

3. 4. C. 9

-Revise / Fill Placement-6/24/86 Special Conditions Revise /Name change to MK-F 3

7/18/86 02674 2.1.E:

Revise / Monitoring Well Filter 4

3.4.8 Revise / Monitoring Well-Filter 2.1.D Revise / Casing and Screens.

Dwg LKV-DS-10-1321 Revise / Reduce Slot Size 8/1/86 Dwg LKV-PS-10-1307 Revise / Holding Tank 5

8/8/86 Dag LKV-PS-10-1324 Add /Woodchip Storage Area 6

i 8/26/86 02200 3.3.C.1 Revir.e/ Backfill Compaction 7

(Section Does Not Exist)

. g.

8/28/86 02200 2.1.C.2.b Delete / Cover PI 8

10/22/86 02200 3.4.B.1 Delete & Renumber /Subgrade

- i 9

3.5.C Add /Subgrade Compaction

~

3.5.D.

Add /Subgrade Compaction 2/12/87 Dwg LKV-PS-10-1309 Revise / Reduce Tailing Excavation 10 3/03/87 Add /Retenetion Basin 1

11 7/10/87 02278 2.1.B.4

. Reissue /Pepperling Qt.arry Adj.

12-2 2.1. B. 5 Reissue /Pepperling Quarry Adj.

3/27/87 03000 Add / Concrete Work-Section 13 Dwg LKV-PS-10-1307 Revise / Decontamination Pads Dwg LKV-DS-10-1320 Revise / Decontamination Pads 14 II 6/1/87 02935 2.1.B Add / Approve Proposed. Seed

~

3.2.A Revise / Approve Seeding Method 15 II 7/8/87 02728 3.8 Add / Interceptor Drain Drawings as Required Revise / Interceptor Drain--

16 Not Issued q

~5

.a NOV 0 21990 I

LAKEVIEW PID SUMARY Page 2 j

PID No.

Class Date Section Action / Issue 13-S-Affected 17 II 10/24/87 None Lower Finish Grade 18 II 3/31/88 02850 Reissue / Signs Bid Schedule Revise / Signs 19-1 I

8/31/88 Owg LKV-05-10-1319 Revise / Rock-Soil Matrix 02200 3.8 Delete / Rock-Soil Matrix 02278 2,1.B.5.a.2)

Revise / Bedding Gradation (2.1.B.5.b)??-

3.2.A.2 Revise /8edding Thickness Owg LKV-OS-10-1319 Revise /fetails 1, 2, 4,.and 5 Dwg LKV-DS-10-1321 Revise /0 1 b l Bedding 02935 Revise./ Seeding for Rock-Soil NOTE:

PID 25-1 REFERS TO PID 19-2 ?????

20 II 6/21/88 02200 2.1.C.1 Revise / Processing Site Backfill 21 II 6/22/88 02200 3.4.C Revise / Backfill Compaction 22 Not Issued 23-2 II 9/16/88 02935 2.1.C Revise / Final Grade Seed Mixture r

2.1.0 Add / Final Grade Seed Mixture

2. 5 Revise / Mulch 3.2 Revise / Application 24 8/11/88 Field Revise / Ditch Geometry 25-1 I

1/27/89 02278 1.4.A.1

. Revise / Testing Standards 2.1.B 4 Revise / Rock Quality i

2.1.B.5 Revise / Rock Gradation-PID 19-2 1

26 II 11/17/88 01052 1.6.8 Revise / Layer Thickness Tolerance l

02278 3.2.A.1 Delete & Renumber / Thickness Tol.

3.2.A.3 Revise / Layer Thickness Tolerance l

27 II 7/28/89 02935 3.1. B Revise / Seeding Rock-Soil Layer 3.2.A.

. Revise / Seeding Method-Rock-Soil j

28 II 8/15/89 Dwg LKV-OS-10-1363 Revise / Monument Locations 29 II 9/12/89 Substitute B-2 for 8-1 Bedding l

30 II 9/19/89 Add Trench Drain for Energy Dissipation Area

.