ML20058G722
| ML20058G722 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/05/1990 |
| From: | Mroczka E NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20058G726 | List: |
| References | |
| B13666, GL-89-04, NUDOCS 9011130379 | |
| Download: ML20058G722 (2) | |
Text
{{#Wiki_filter: i '!i Genera 1011 ices
- Seiden Street, Berlin, Connecticut E
7 IhrEro*n'o', CONNECTICUT 061410270 cL =,=== aa n ww November 5,.1990 Docket No. S0-245 B13666 i Re: Generic Letter 89-04 ISAP Topic 1.104 Attention: Document Control' Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen: Millstone Nuclear Power Station, Unit'No. 1 Generic Letter 89-04 In Service Test Proarams Northeast Nuclear Energy Company (NNECO) responded to Generic Letter 89-04, " Guidance on Developingcceptable Inservice Testing Programs," by lettor i dated October 2, 1989. In the letter, MECO provided a schedule for revising plant procedures to implement the changes to the Millstone Unit No. I In-Service Testing (IST) program. The commitment dates were based on our understanding that the Staff would be providing concurrence to utilize por-tions of ASME/ ANSI OH 6 and OH-10 by January 31, 1990. NNECO discussed our intent to use ASME program with the NRC Project Manager on/ ANSI OH-6 and OH-10 in our revised-IST several occasions. However, it.is our understanding that the Staff is unable to approve use of OM 6 and OM-10 at this time. Revision 4 of its IST arogram, adapted to the range of hydraulic parametersIn and vibration amplituces depicted in the latest NRC-approved version of ASME Section XI, Article IWP, rather than using OM-6. Since ASME/ ANSI OM '~ meets or exceeds the requirements of Article IWV, NNECO has' opted to utili portions of OH-10 in the Revision 4 IST program. have indicated this approach would resolve the issue. Conversations with the Str Accc-dingly, Millstone Unit No.1 commits to the' following implementation dates for the Revision 4 IST Program: 1. Existing quarterly surveillance procedures were revised and implemented by August 31, 1990. ] 1 (1) E. J. Mroczka letter to U.S. Nuclear' Regulatory Commission, " Response tot Generic letter 89 04--Guidance on Developing Acceptable In-Service Test . Programs," dated October 2, 1989. 9011130379 901105 PDR ADOCK 05000245 kt 'I PDC
- l *T i
.v, P . osa422 nev 4.es
l U.S. Nuclear Regulatory Commission B13666/Page 2 November 5, 1990 1 2. Where new quarterly surveillance procedures are necessary, these will be -{ prepared and implemented by November 30, 1990. 3. Revised or new procedures required for cold shutdown / refueling outages will be completed and implemented by March 1,1991 (in support of the 1991 refueling outage). Enclosed for your information is a copy of Revision 4 of the Millstone Unit No. 1 IST Program. Please contact us if you have questions. Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY Sen e resi nt cc: T. T. Martin, Region 1 Administrator M. L. Boyle, NRC Project Manager, Millstone Unit No. 1 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 4 l l I -l}}