ML20058G662

From kanterella
Jump to navigation Jump to search
Forwards Documents Which Will Be Required for Response to Request for Proposal on Upcoming Task Order Under Jcn J-2017 & Subsequently,To Successfully Perform Work.W/O Encl
ML20058G662
Person / Time
Issue date: 11/30/1993
From: Ronaldo Jenkins
Office of Nuclear Reactor Regulation
To: Nowlen S
SANDIA NATIONAL LABORATORIES
References
NUDOCS 9312100032
Download: ML20058G662 (1)


Text

,

November 30, 1993 Mr. Steve P. Nowlen Nuclear Energy Technology Organization 6449 l

Sandia National Laboratories Albuquerque, New Mexico 87185-0737 l

Dear Mr. Nowlen:

I i

Enclosed are documents which will be required for you to respond to a request for proposal on an upcoming task order under JCN J-2017 and, subsequently,. to successfully perform the work. The documents relate to the fire endurance test program results of Thermo-Lag protected cable systems as directed by t

Texas Utilities (TU) Electric Company for Comanche Peak Steam Electric Station (CPSES) Unit 1.

This letter is not an authorization to begin work on this task order. The authorization to begin work on the upcoming task order will be provided in a letter signed by the Director, Division of Engineering, NRR, after agreement is reached on the acceptability of your proposal.

If you have any questions, please call me. Thank you for your assistance.

l Sincerely, Original Signed by Ronaldo Jenkins Ronaldo Jenkins Electrical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation

Enclosures:

1. (Scheme #15-2), Memorandum from William J. Cahill Jr.,

i TU Electric to U.S. NRC dated October 28, 1993, "Thermo-Lag Laboratory Test Results and Responses to Request for Additional Information for CPSES Unit 1" 2.

Memorandum from William J. Cahill Jr., TU Electric to U.S. NRC dated September 16,1993, " Draft Cable Functionality Evaluation Report and Evaluation of Jacket Swelling," (Evaluation of Jacket Swelling only) 3.

Test Report - Fire Endurance Test of a Thermo-Lag 330-1 fire Protective envelope (3/4", lin" & 2" Conduits), 12-28-92, OMEGA POINT LABORATORIES, Project 12340-94367j, Scheme 9, Assembly 3 i

DISTRIBUTION d enclosures JTWiggins, NRR CHBerlinger, NRR PGill, NRR RJenkins, NRR BGrenier, NRR PDR Official Contract File (7 026) Central. Files -