Northem States Power Company 414 Nicollet Mail Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 December 1, 1993 Technical Specification 4.12 E.1 U S Nuclear Regulatory Commission Attn: Document Control Desk
{
Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Steam Generator Tube Plugginn s
In accordance with Technical Specification 4.12.E.1, the following steam generator tube plugging and sleeving information is provided for the l
information of the NRC staff.
Following the recent inservice inspection of the Unit 2 steam generators, twelve tubes were plugged for the first time.
The percentage of tubes plugged 1
is 2.54% on steam generator 21.
The percentage of tubes plugged is 4.81% on steam generator 22.
A summary is attached.
This information will be expanded upon in the Inservice Inspection Report for Unit 2 which will be submitted within 90 days of the end of the current refueling outage. Also Table 4.3-14 of the Prairie Island Updated Safety Analysis Report will be updated in the next revision.
In this correspondence, we have made no new NRC commitments, if you have any questions concerning this information please call Jack Leveille (612-388-1121, Ext. 4662).
l (h
' CfA fPt -
I Roger O Anderson Director Licensing and Management Issues c: Regional Administrator - Region III, NRC Senior Resident Inspector, NRC NRR Project Manager, NRC j
[
J E Silberg
Attachment:
Steam Generator Tube Plugging Swnmary (1 page) t g
9312090310 931203 DR ADOCK 05000282 p
-. ~..
4 ';
i Attachmera l
USNRC I
i I
Duereer tr1993 i
?
I STEAM CENERATOR TUBE PLUCCING
SUMMARY
t Steam Generator No. 21 Summarv l
Tubes plugged this outage:
7
{
Total tubes plugged:
86 f
21 Steam Cencrator % plugged:
2.54%
I Number of plugs removed this outage:
0 New Indications:
Seven tubes were plugged; one tube had a single axial indication at the
[
rolled transition zone and six tubes had multiple axial indications.at the rolled transition zone.
A hydrostatic test at 800 psi on the secondary side vas done; one tdbe was found leaking, the leaking tube was also one of the six tubes with multiple axial indications at the rolled transition zone.
All tubes were plugged with Alloy 690 ABB/ Combustion Engineering
{
mechanical (rolled) tube plugs.
}
Steam Generator No. 22 Summary Tubes plugged this outage:
5 l
Total tubes plugged:
163 22 Steam Generator % plugged:
4.81%
i Number of plugs removed this outage:
0 New Indications:
Five tubes were plugged; one tube had a single axial indication at the rolled transition zone, three tubes had multiple axial indications at the rolled transition zone, and one tube had a 40% through-wall indication at the first cold le6 tube support plate. A hydrostatic test at 800 psi on the secondary side was done; inspection of the tube sheet found no leaks.
All tubes were plugged with Alloy 690 ABB/ Combustion Engineering mechanical (rolled) tube plugs.
i I