ML20058G541

From kanterella
Jump to navigation Jump to search
Requalification Dynamic Simulator Exam Rept 50-373/OL-90-03 Administered on 901030 for Both Units.Exam Results:Senior Reactor Operator Satisfactorily Passed Exam
ML20058G541
Person / Time
Site: LaSalle  
Issue date: 11/05/1990
From: Bielby M, Jordan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20058G540 List:
References
50-373-OL-90-03, 50-373-OL-90-3, NUDOCS 9011130256
Download: ML20058G541 (3)


Text

.

e h

s U.S. NUCLEAR REGULATORY COMMISSION REGION 111 i

Report No. 50-373/0L-90-03 Docket Nos. 50-373; 50-374 Licenses No. NPF-11; !!PF-'18 Licensee: Commonwealth Edison Company Opus West 111 1400 Opus Place Downers Grove, IL 60515 Facility Name:

LaSalle County Nuclear Station Examination Administered At:

Production Training Center Braidwood, Illinois 9

Examination Conducted: October 30, 1990

, h-

///r/fc Chief Examiner:

M. Bielby Date.

Approved By:

// "[fu' M. J// Jfrdan, Chief ate Operator Licensing Section i Examination Summary Examination administered on October 30,1990(Report 110 50-373/0L-90-03)) '

A requalification dynamic simulator examination was administered to-a non-onerating crew, which included one Senior Reactor Operator '(SRO) who was an indivie.al dynamic simulator failure from the previous NRC LaSalle Requalii t.,

  • ion Examination of April,1990.

Results: H e individual SR0 satisfactorily passed the examination.

Independent grading by the NRC and facility. satisfied the criteria of ilVREG-1021, Operator Licensing Examiner Standards, ES-601.

901113n256 901106 PDR ADOCK 0500 "g3

E REPORT DETAILS ~

1.

Examiners M. Bielby, Sr., Rlll NRC Chief Examiner M. Leach, k!!! NRC Observer-2.

Exit Meeting An informal exit meeting was conducted with the Training Staff'atithe Production Training Center LaSalle Simulator on October 30, 1990. The following personnel were in attendance at this meeting:-

Facility Represcinatives.

1. Schaffer, Plant Training Manager.

1 D. Sheldon, Operations Training Group Leader r

J. Atchley, Operations Representative P. Leheny, Operations ~ Training Group Leader K. Rech, PTC Simulator Opu ator 3

NRC Representatives

[

11. Bie1Dy, Sr.,-Rlll NRC Chief Examiner tt Leach, Rlll NRC 0bserver t

There were no comments at-the Exit Meeting.-

]

3.

Examination Results Comparison-f i

A comparison of the facility and NRC scenario evaluation results satisfied the criteria of NUREG-1021, Operator Licensing Examiner l

Standards, ES-601.

4.

Overall Requalification Program Evaluation f

u The LaSalle Requalification program was previous!y: assigned'an'overall:

I l

rating of satisfactory (See Report NO.- 50-373/0L-90-02)

.i 1

'l 1

2-a

/

,+.

REQUAllFICATION PROGRAtt-EVALUATION REPORT Facility: LaSalle County Nuclear Station Examiner: 11.E. Bielby, Sr.

Date of Evaluation: October 30, 1990 Area Evaluated:

Dynamic Simulator. (Retake from ApH11990)

. v.

Examination Results:

R0 SRO

> Total Evaluation-Pass / Fail

. Pass / Fail; Pass / Fail.

(S or U)

Dynamic Simulator, N/A

.1/0 1/0 (Retake)

Evaluat!on of facility resuts: A comparison of the facility and NRC Evaluation results satisfie G ri u *ia specified in NUREG-1021, OJerator Licensing Examiner Stat,a rds, ES 601.

-Overall Program Evaluation SATISFACTORY (SeeReportNo.50-373/0L-90-02)'

Su mitted:.

Forwarde'd*-

roved:--

jf6

/.

-B elby Jordan.

W ht Examip/90 Sectji n Chief:

Branch Chief:

er 11/5 11/4 /90; 11/4/90-a

. 3.

~'

1

-