Advises of Discontinuation of Activities Associated w/motor- Operated Valve Program,Per 891208 Response to Generic Ltr 89-10.All Valves Accessible & Sufficient Time Available to Manually Operate Valves for Alignment
ML20058G458
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/02/1990
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To: Weiss S
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
GL-89-10, P-90316, NUDOCS 9011130168
Download: ML20058G458 (2)


Text

{{#Wiki_filter:- t [ q t a g y "a";.0 % Public Service

  • m P.O. Box 840 e

Denver CO 80201 0840-- ..I A. Clegg Crawford November 2, 1990 Vice President + Fort St. Vrain Nuclear Operations N Unit No. 1 P-90316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk . ashington, D. C. 20555 i W ATTNi Mr. Seymour H. Weiss, Director s" N Power Reactor, Decommissioning, Ana Environmental Project Directorate Docket No.iS0-267 I SUBJECTi Motor Operated Valve Program, Generic Letter 89-10

REFERENCES:

1) NRC. Generic Letter 89-10, Supplement'2, dated August 3,1990(G-90182) l a
2) PSC Letter, Crawford to Document Control Desk, dated

~! December 8, 1989 (P-89464) j Dear Mr. Weiss; } ) The= NRC:'recently issued Supplement ~2 to Generic Letter 89-10 -(Reference 1), which requested licensees to' contact. their. project

manager when their program ~ descriptions; for motor operated valve 1

(MOV)-testing woula be a'vailable for NRC review. 'Public Service Company of Colorado (PSC) previously indicated that.no additional measures to improve MOV performance at Fort St. Vrain i (FSV) are necessary, in response to Generic Letter 89-10 (Reference 2).~ This position was based on the= permanent shutdown condition of H the _ plant, the low energy remaining in FSV systems,. and an engineering evaluation that no MOVs are relied upon to prevent or j -mitigate the consequences of any design basis accidents for the i remainder of defueling. In addition, all FSV valves are accessible and sufficient time is available to manually operate MOVs for any i remaining operational or postulated accident valve alignments, i ( N 0 0t 9011130168 901102 PDR ADOCK 05000267 i p PDC p/S h t= z

(b, h' P-90316 Page 2 n.ec - "~ November 2,:1990 7 Based upon-the 'above discussion' and the evaluation provided in . Reference 2, PSC is discontinuing all activities associated with the r FSV MOV. program.. If you have any questions concerning this matter, please contact Mr. M. H. Holmes at-(303) 480-6960. i Very truly yours. t CY* -[ ps" 7 A. Clegg Crawford { Vice President Nuclear 10perations ACC/SWC/imb cc':. Regional Administrator, Region IV . ATTN: Mr. J. B. Baird-Technical Assistant Division'of Reactor Projects l Mr.'D. Garrison. Site Resident Inspector 'j Fort St. Vrain 1 + L s =}}