ML20058G382

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-1113/82-15 on 820712-16.No Noncompliance Noted.Major Areas Inspected:Measurement Control Program & Verification of Export SNM Shipment & Tampersafing.Details Withheld (Ref 10CFR2.790)
ML20058G382
Person / Time
Site: 07001113
Issue date: 07/28/1982
From: Bates J, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19262G673 List:
References
70-1113-82-15, NUDOCS 8208030304
Download: ML20058G382 (1)


Text

/

'o,,

UNITED STATES y

NUCLEAR REGULATORY COMMISSION o

t z

REGION il

/[

101 MARIETTA ST., N.W.. SUITE 3100 Q

ATLANTA,GEORotA 3G303 JUL 281982 cONTAINS 2J90 INFORVATION/AATERIAL Report ho-70-1113/g2-15 Docket No. 70-1113 License No. SNM-1097 Safeguards Group No. III Licensee: General Electric Company P. O. Box 780 Wilmington, NC 28402 Date of Inspection: July 12-16,1982 Type of Inspection:

Unannounced Material Control and Accountability Inspector:

b@ ' O 1ovru 7/21/t t J. W. Batei, Safeguards Chemist Date Signed Approved by:

bW ' O_( cate,x, 7/2 7 /7 L E. J. McAlpine, Chief, Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected: Measurement control program and verification of export shipment of SNM including: processing; packaging and tampersafing, and SNM verification.

The inspection involved 35 inspector hours on site by one NRC inspector and was l

begun during the regular hours.

l Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.

l 89

/c2B s-r2 Copy Id of V Copios 7

_ Paged This Document is net to be reproduced without specific j

l I

approval o f IE:II

/AATERIAL TR ANSVITTED HEREWITM CONTAINS 2190 INFoRMATION 8208030304 820728 PDR ADOCK 07001113 C

PDR