ML20058G253

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-1113/82-13 on 820621-25.No Noncompliance Noted.Major Areas Inspected:Physical Inventory Verification & Production Enrichment Analyzer.Details Withheld (Ref 10CFR2.790)
ML20058G253
Person / Time
Site: 07001113
Issue date: 07/19/1982
From: Earnestine Clay, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19262G671 List:
References
70-1113-82-13, NUDOCS 8208030243
Download: ML20058G253 (1)


Text

, - - -

[jkD "'Gog UNITED STATES MUCLEAR REGULATORY COMMISSION

,,og

[

REGION 18 o

MATERIAL TaANSMRTED HESEWllH s

101 M ARIETTA STREET, N.W.

CONTAINS 2.790 INFORMATION

y r#

o AT LANTA, GEORGI A 30303 JUL 101982 i

Report No. 70-1113/82-13 Docket No. 70-1113 License No. SNM-1097 Safeguards Group No. III i

Licensee: General Electric Company P. O. Box 780 Wilmington, NC 28401 Date of Inspection: June 21-25, 1982 Type of Inspection:

Announced Material Control and Accountability Inspector:

h l9 6F o

E. L. Clay, Safeguards Engt beh

~0 ate Signed

~

Approved by:

hkO W CUlc m 7 /19 / 8 2.

E. J. McAlbine, Chief,\\ Material Control and Date Signed Accountability Section j

Technical Inspection Branch j

Division of Engineering and Technical Programs Inspection Summary 4

Areas Inspected:

Physical Inventory Verification - 85206, 85213 (U02 Packaged for shipment) and Production Enrichment Analyzer (PEA) - 85206.

The inspection involved 35 inspector hours on site by one NRC inspector and was begun during the regular hours.

-Results: The licensee was found to be in compliance with NRC requirements in all areas examined during the inspection.

i t

R8

- MS s-r2 4

Copy 9 of J Copies 6

Pages Thin Document ia not to be reproduced without specific approval of IE:II i

j MATERIAL TRANSMITTTD HEREWITH cCNTAINS 2J90 INFORMATION i

8208030243 820719 i

C R ADOCK 07oog3j3 PDR i

--,.,,,,e

--,w.

,,n--