ML20058G006

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-0600/82-01 on 820721.No Noncompliance Noted.Major Areas Inspected:Snm Protection, Security Plan & Procedures,Physical Barriers,Detection Aids & Surveillance.Details Withheld (Ref 10CFR2.790)
ML20058G006
Person / Time
Site: 07000600
Issue date: 07/29/1982
From: Mcqueen A, Schuster M, Schwan C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20058F986 List:
References
70-0600-82-01, 70-600-82-1, NUDOCS 8208030167
Download: ML20058G006 (1)


Text

,'

The.information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.

U.S. NUCLEAR REGULATORY COMMISSION Region V Report flo. 70-600/82-01 (IE-V-512)

Docket flo.70-600 License No. SNM-589 Safeguards Group Licensee:

Seattle University School of Engineering Seattle, Washington 98122 Facility Name:

Sub-Critical Facility Inspection at:

Seattle, Washington Inspection Conducted: July 21, 1982 Pace of Last Physical Security Inspection Visit: Security Survey May 17, 1979 Type of Inspection:

Unannounced Physical Security M k !7A Inspectors:

~ A. Schwan, Physical Secu ity Inspector Date Signed b

LLEAvs d tLks;TM./4F2--

A. D. McQueen, Physical Security Inspector-

'{ Q ate S1gned Date Signed 72.9 /[2-Approvedby:r'k dAh

.h 4(dd e

/

$} M. D. Schuster, Chief

'Date Signed Physical Security Section Inspection Summary:

Areas Inspected:

Protection of -SNM; Security Plan and Procedures; Physical Barriers; Locks and Keys; Detection Aids; Surveillance; Response; Communications;

  • Security Organization; and Independent Effort. The inspection involved six inspector hours by two NRC inspectors. The inspection was conducted during regular hours.

Results: No items of noncompliance were noted in the eight areas inspected.

8208030167 820729 PDR ADOCK 07000600 C

PDR

.