'y-a November 5, 1990 U. S. '.. clear Regulatory Commission Document Control Desk Washington, D.C.
20555 ULNRC-2318 1
p Gerstlemen:
l DOCKET NUMBER 50 483 CALIAWAY PLANT UNIT 1 3'
FACILITY OPEPATING LICENSE NPF 30 SPECIAL REPORT 90 03 NUMBER OF TUBES PLUGGED DURING FOURTH STEAM GENERATOR TUBE INSERVICE INSPECTION i
This;Special Report is being. submitted ~in<accordance with Technical
' Specification (T/S) 4.4;5.5.'a; which: states:.
"Within 15, days:following the completion of each inservice inspection ~of steam'generatorftubes;=the' number.of tubes j
'^
iplugged in each steam. generator.shall be reported to.the.
Commission'in a Special. Report pursuant to Specification t
. 6. 9. 2 ",.
-n
~
.' 1The' Fourth Steam Generator (S/G) Inservice Inspection-was completed for
.i y
S/G's !A' and 'D' Eon.10/23/90 to meet the. surveillance requirements of T/S 3/4.4;5, " Steam Generators". The plant was,in Mode.6 Refueling, with the i
core defueledlfor; the planned Refuel IV outage. ? Twenty two tubes were plugged j
i Las 'a'. result cof:the., inspection 1and~are identified below:.
S/G
'A' Row Column
(
32-
~10 i
39
'45 40 17~
i E'
~4 6 37
't 53 33 es:
. Sie 36 s
.,,,t 1-, ~..
F
' 'l t t
6 F
f$4/ 7 V
9011090110 901105
.. /[/ g H
- PDR
- ADOCK 05000483 PDC 1
-Q-
f
<t Page 2 ULNRC-2318 i
i S/C
'D' S/G
'D' Row Column Row Col umn
{
35 110 47 28 36 15 47 35 37 17 47 38 41 21 47 41 42 65 48 82 45 33 49 85 45 37 50 85 45 44 52 74 A
(h M'D J! D. Blosser Manager, Callaway Plant TPS/MKD/dj r cc:
Distribution attached i
a cc distribution for ULNRC 2318 Mr. A. Bert Davis Mr. Anthony T. Gody (2 copies)
Regional Administrator U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission OWFN - Mail Step E1321
~
Region III Washington, D.C.
20555 799 Roosevelt Road Glen Ellyn, IL 60137 r
American Noelcar Insurers Mr. O. Maynard c/o Dottie Sherman, Library Wolf Creek Nuclear Operating Corp.
The Exchange Suite 245 P. O. Box 411 270 Farmington Avenue Burlington, KS 66839 Farmington, CT 06032 Manager, Electric Department Mr. Met 11n Williams Miusouri Public 6ervico Commission Supt. of Regulatory Quality &
F-P. O. Box 360 Administrative Services Jefferson City, MO 65102 Wolf Crook Nuclear Operating Corp.
P. O. Box 411 Burlington, KS 66839 7
Records Center Mr. R. L. Hague Institute of Nuclear Power Operations Chief, Project Section 3A Suite 1500 U.S. Nuclear Regulatory Commission 1100 Circle 75 Parkway Region III Atlanta, CA 30339 799 Roosevelt Road Glen Ellyn, IL 60137
=r NRC Resident Inspector D. F. Schnell (400)
C. L. Randolph R. P. Wendling (470)
J. V. Laux A. C. Passwater/D. E. Shafor/D. J. Walker (490)
G. A. Hughes Z170.0005 (QA Record)
Z40SR (Z170.0009 Commercial Record)
M. S. Evans M. E. Taylor H = Wuertenbaccher, J r. (100)
S. L. Auston (490)(NSRB)
S, J. Bellers/D. R. Oelrichs J. C. Beck E210.0001 240ULNRC A160.0761 N. Date (Sandra Auston)(490)
=
=
M
-