1 l
- peo n fit h,
UNITED STATES E
,j NUCLEAR REGULATORY COMMISSION g
WASHINGTON. D.C. 205554C1 f
November 24, 1993 Docket Nos. 50-313 and 50-368 Mr. Jerry W. Yelverton Vice President, Operations ANO Entergy Operations, Inc.
l Route 3 Box 137G l
Russellville, Arkansas 72801
Dear Mr. Yelverton:
SUBJECT:
STATION BLACK 0UT (SBO) COMMITMENT FOR A ONE-TIME CONFIRMATORY LOAD l
TEST, ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (AND-l&2) (TAC N05. M85956 AND M85957)
^
By letter dated February 26, 1993, Entergy Operations, Inc., confirmed its intent to conduct a one-time shutdown equipment load test of the new non-safety-related diesel generator (alternate AC power source) in accordance with Part B.12 of NUMARC 87-00. The letter also stated that the expected schedule i
for conducting the B.12 test will be during the spring and fall outages in l
1995 for ANO-l&2, respectively, and the B.12 test is not an exception to the December 31, 1994, implementation date for the new diesel generator.
Based on our review of the february 26, 1993, letter and the additional l
information provided, the NRC staff agrees that the new diesel generator will be available for responding to an SB0 event by the implementation date of December 31, 1994.
The staff agrees with your position of conducting the B.12 I
test in the spring and fall outages of 1995 and considers this issue to be l
resolved. Accordingly, ANO-1&2 must be in compliance with the SB0 Rule by December 31, 1994, in all respects (including any related procedure changes, calculations, tests, etc.), except for testing of the alternate AC diesel j
generator in accordance with Part B.12 of NUMARC 87-00, and the B.12 test must I
i y@l '
NBC RE CEY!i31 fifPY 9312080208 931124 PDR ADDCK 0500 3
P
E l
Mr. Jerry W. Yelverton i l
be completed prior to restart from the spring and fall outages of 1995 for i
AND-l&2, respectively. The staff requests that you inform us, in writing, when you are in compliance with the SB0 Rule except for the B.12 test, and alro when you have completed the B.12 test for ANO-1 and ANO-2.
i i
l Our related Supplemental Safety Evaluation is enclosed.
l Sincerely, l
\\
ORIGINAL SIGNED BY:
l Roby B. Bevan, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V i
Office of Nuclear Reactor Regulation ORIGINAL SIGNED BY:
i Thomas W. Alexion, Project Manager Project Directorate IV-1 i
Division of Reactor Projects - III/IV/V i
Office of Nuclear Reactor Regulation i
Enclosure:
Supplemental Safety Evaluation I
cc w/ enclosure:
See next page i
i DISTRIBUTION:
Docket File NRC & Local PDRs PD4-1 Reading l
R. Bevan E. Adensam W. Beckner P. Noonan PD4-1 Plant File T. Alexion OGC ACRS (10) (P-315)
A. B. Beach J. Roe A. Pal 0FC LA:PD4-h w PM:PD4-1 PM:PD4-M [\\
D:PD4-l M D NAME PNoon$n$II RBeN TAlexionk' WBeckner DATE lI/j)/93 11 4J/93 (3 /22/93 11/d/93 J
l COPY YES[N0 YES/NO
- YES//40 YES/fND v
i 0FFICIAL RECORD COPY Document Name: AR85957.ltr 300"20 l
1 l
f Mr. Jerry W. Yelverton.
be completed prior to restart from the spring and fall outages of 1995 for ANO-l&2, respectively. The staff requests that you inform us, in writing, when you are in compliance with the SB0 Rule except for the B.12 test, and also when you have completed the B.12 test for ANO-1 and ANO-2.
Our related Supplemental Safety Evaluation is enclosed.
Sincerely, Roby B. Bevan, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation f4
'd Thomas W. Alexion, Project anager Project Directorate IV-I Division of Reactor Projects - III/IV/V i
Office of Nuclear Reactor Regulation
Enclosure:
Supplemental Safety Evaluation l
cc w/ enclosure:
See next page
7 i
Mr. Jerry W. Yelverton Entergy Operations, Inc.
Arkansas Nuclear One, Units 1 & 2 i
cc:
l Mr. Harry W. Keiser, Executive Vice Mr. Jerrold G. Dewease i
President & Chief Operating Officer Vice President, Operaticns Support Entergy Operations, Inc.
Entergy Operations, Inc.
P. O. Box 31995 P. O. Box 31995 Jackson, Mississippi 39286 Jackson, Mississippi 39286 Mr. Charles B. Brinkman, Manager Mr. Robert B. McGehee Washington Nuclear Operations Wise, Carter, Child & Caraway ABB Combustion Engineering P. O. Box 651 Nuclear Power Jackson, Mississippi 39286 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Admiral Kinnaird R. McKee, USN (Ret) 214 South Morris Street Mr. Nicholas S. Reynolds Oxford, Maryland 21654 Winston & Strawn 1400 L Street, N.W.
Washington, D.C.
20005-3502 Mr. Robert B. Borsum l
Licensing Representative B&W Nuclear Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission 1 Nuclear Plant Road Russellville, Arkansas 72801 Regional Administrator, Region IV l
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 a
Honorable C. Doug Luningham County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Ms. Greta Dicus, Director Division of Radiation Control and f_mergency Management Arkansas Department of Health 4815 West Markham Street Little Rock, Arkansas 72205-3867 i
l
-