ML20058F584

From kanterella
Jump to navigation Jump to search

Forwards Amend 157 to License DPR-40 & Safety Evaluation. Amend Revises TS to Implement Administrative Changes
ML20058F584
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/22/1993
From: Steven Bloom
Office of Nuclear Reactor Regulation
To: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20058F587 List:
References
TAC-M86928, NUDOCS 9312080188
Download: ML20058F584 (4)


Text

4 i

p* * * %

I p

) ') e i S UNITED STATES

{$[~$

NUCLEAR REGULATORY COMMISSION

          • f

. g, WASHINGTON, D.C. 20!&C001 November 22, 1993 Docket No. 50-285 Mr. Terry L. Patterson Division Manager - Nuclear Operations Omaha Public Power District '

444 South 16th Street Hall Mail Stop 8E/EP4 Omaha, Nebraska 68102-2247

Dear Mr. Patterson:

SUBJECT:

FORT CALHOUN STATION, UNIT 1 - AMENDMENT NO. 157 TO FACILITY OPERATING LICENSE NO. DPR-40 (TAC NO. M86928)

The Commission has issued the enclosed Amendment No.157 to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit 1.

This amendment consists of changes to the Technical Specifications in response to your application dated June 17, 1993, as supplemented on October 8,1993.

1 The amendment makes changes to the Technical Specifications to implement administrative changes.

Your letter dated November 11, 1993, requested that the amendment be issued on November 17, 1993, prior to the end of the 30-day notice period, which ends December 8, 1993.

Your letter stated the approval of Topical Report OPPD-NA-8302 was not approved until November 2, 1993, and since your supplemental submittal dated October 8,1993, was not noticed for comment in the Federal Reaister until November 8,1993, this would result in an excessive delay in startup. Due to the circumstances further described in the Safety Evaluation, the staff has determined that the amendment can be issued prior to the end of the 30-day notice period.

NBC HLE CENTER COPY

sPrei Zi!!$r

/h;,

P

t

j t

r

[

t Hr. Terry L. Patterson A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance and Final Determination of No Significant Hazards Consideration will be included in the Commission's biweekly Federal Reaister notice.

i i

Sincerely, j

ORIGINAL SIGNED BY:

1 Steven Bloom, Project Manager j

Project Directorate IV-1 i

Division of_ Reactor Projects - III/IV/V i

Office of Nuclear Reactor Regulation

Enclosures:

l

1. Amendment No. 157 to DPR-40 l
2. Safety Evaluation j

i cc w/ enclosures:

See next page f

i t

l I

s QlFTRIBUTIO_N:

l facket File NRC& LPDRs PD4-1 r/f P. Harrell,RIV J Roe E. Adensam WBeckner R. Jones, SRXB P. Noonan ACRS(10)

OGC(MS15B18)

D. Hagan(MS3206)

G. Hill (4)

C. Grimes (MS11E22) 6 l

S. Bloom OPA(MS2G5)

OC/LFMB(MS4503) i i

I i

oSce previous concurrence 0FC LA]PD4 1 PM/PD4-1 EMEB*

SRXB*

OGC*

D/PD4-1Y Ah]/Ih - p, NAME b

S b m/vw JNorberg RJones BBordenick WBeciner EACe. ream.

h

\\\\ /,

\\

DATE Jl /l$ /93 1(/ ($/93 10/01/93 10/04/93 11/17/93 l\\ /li /93

_ COPY (hNO ISh0 YES/N0 YES/N0 YES/NO YES/NO OfflCIAL' RECORD COPV Document Name:

FC86928.AMD EC RE CRITBt COPY 91on; y

57-~

l i

Mr. Terry L. Patterson A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance and Final Determination of No Significant Hazards Consideration will be included in the Commission's biweekly Federal Reoister notice.

i Sincerely, Steven B oom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosures:

1. Amendment No.157 to DPR-40
2. Safety Evaluation cc w/ enclosures:

See next page l

t

_-_p 7

t' Mr. Terry L. Patterson Omaha Public Power District Fort Calhoun Station, Unit No. I cc:

Harry H. Voigt, Esg.

LeBoeuf, Lamb, Leiby & MacRae 1875 Connecticut Avenue, NW Washington, D.C.

20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Nebraska Department of Health 301 Centennial Hall, South Post Office Box 95007 Lincoln, Nebraska 68509 Mr. James W. Chase, Manager Fort Calhoun Station Post Office Box 399 Fort Calhoun, Nebraska 68023

~