ML20058F365

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/93-39 & 50-499/93-39 on 931025-29.No Violations Noted
ML20058F365
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/01/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20058F369 List:
References
NUDOCS 9312080086
Download: ML20058F365 (6)


See also: IR 05000498/1993039

Text

'

  1. '* %,

UNITED STATES

t

l; .

f

NUCLE AR REGULATORY COMMISSION

.[(i.

i 3

REGION V

611 RY AN PLAZA DRIVE. SUITE 400

,g

ARLINGTON,1 F X AS 760118064

<

.,

e ,.g

' **

DEC - i 1993

l

Dockets:

50-498

50-499

Licenses: NPF-76

NPF-80

l

1

Houston Lighting & Power Company

,

ATTN: William T. Cottle, Group

Vice President, Nuclear

P.O. Box 289

Wadsworth, Texas 77483

SUBJECT: NRC INSPECTION REPORT 50-498/93-39; 50-499/93-39

j

This refers to the inspection conducted by Messrs. T. O. McKernon and

L. E. Ellershaw of this office on October 25 through 29, 1993.

The inspection

included a review of activities authorized for your South Texas Project

facility. At the conclusion of the inspection, the findings were discussed

with you and those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a review of the postmaintenance

testing program (Restart Issue 4) and those corrective actions your staff has

taken to restructure the program.

In addition, the inspection reviewed

previous inspection findings and their corrective actions related to

postmaintenance testing. At the conclusion of this inspection, Restart

Issue 4 of NRC Inspection Report 50-498/93-31; 50-499/93-31 remained open

pending further review of related items.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

i

I

/

I,

L,

V

' A. Bill Beach, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-498/93-39; 50-499/93-39

Q20oogs93,gg,

G

Dock 0500049g

PDR

. .

'

i

v

Houston Lighting & Power Company

-2-

t

i

s

cc w/ enclosure:

Houston Lighting & Power Company

ATTN: ' James J. Sheppard, General Manager

l

Nuclear Licensing

-

'

P.O. Box 289

Wadsworth, Texas 77483

City of Austin

.

Electric Utility Department

!

ATTN:

J. C. Lanier/M. B. Lee

721 Barton Springs Road'

Austin, Texas 78704

-

City Public Service Board

'

ATIN:

K. J. Fiedler/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

,

'

,

Newman & Holtzinger, P. C.

!

ATTN: Jack R. Newman, Esq.

1615 L Street, NW

Washington, D.C.

20036

Central Power and Light Company

ATTN:

G. E. Vaughn/T. M. Puckett.

P.O. Box 2121

Corpus Christi, Texas 78403

,

INPO

Records Center

700 Galleria Parkway

Atlanta, Georgia 30339-5957

Mr. Joseph M. Hendrie

50 Bellport Lane

Bellport, New York 11713

)

'

Bureau of Radiation Control

<

State of Texas

i

1100 West 49th Street

Austin, Texas 78756

Judge, Matagorda County

Matagorda County Courthouse

1700 Seventh Street

Bay City, Texas 77414

,

,.

_

.

.

Houston Lighting & Power Company

-3-

Licensing Representative

Houston Lighting & Power Company

Suite 610

Three Metro Center

Bethesda, Maryland 20814

Houston Lighting & Power Company

ATTN:

Rufus S. Scott, Associate

General Counsel

P 0. Box 61067

Houston, Texas 77208

.,

,, .

. .

. . _ .

. . . -

- .

- .

. .

- - -

. -

-

-

Houston Lighting & Power Company

-4-

DEC - 1 1993

,

bcc to DMB (IE01)

bcc distrib. by RIV:

)

'

J. L. Milhoan

Resident inspector

Section Chief (DRP/A)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/A)

,

R. Bachmann, OGC, MS: IS-B-18

Section Chief (DRP/TSS)

A. B.

Beach, D/DRP

i

s

a

,

,

,

l

I

,

+

i

RIV:DRP:%RL

MS:DR

C:DRP:Ah

D:DRP

TMcKehff

LEEllebis

WDJohnson

ABillch

l11/493

11 A1/93

11/y>/93

12/ 1 /93

1

.

!

!

5

-. .

.

.I

.

Houston Lighting & Power Company

-4-

DEC - 1 1993

bec to D118 (IE01) i

bccdistrib.byRIV:(

~J. L. Milhoan

Resident Inspector

Section Chief (DRP/A)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/A)

R. Bachmann, OGC, MS: 15-B-18

Section Chief (DRP/TSS)

A.

B.

Beach, D/DRP

,

C:DRP:Af

D:DfP

RIV:DRP:WI,

MS:DR

TMcKeh)[

LEEllebaw

WDJohnson

ABfslch

11/ 8 93

llMA/93

ll/]S/93

11/i /93

i

0700a5

i