Ack Receipt of Discussing Licensing of Advanced PWR Design.Nrc Cannot Issue Partial Safety Evaluation at Conclusion of Each Review Session as Requested
ML20058F336
Person / Time
Issue date: 07/14/1982
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Rahe E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20058A640 List:
References
NUDOCS 8207300422
Download: ML20058F336 (4)


Text

I.

?

DISTRIBUTION

. Central-Files ?

VStello JUL 141982

~NRC PDR HRDenton/EGCase PRC System PPAS RMinogue DL:L Reading GCunningham RLTedesco/JKerrigan SHanauer LBerry RVollmer DEisenhut/RPurple RMattson MJambor PCheck Mr. E. P. Rahe, Jr., Manager DELD BSnyder Nuclear Safety Department SCavanaugh,NRR(ED0#12012)

Westinghouse Electric Corporation MBridgers,ED0(ED0#12012)

Post Office Box 355 I&E Pittsburgh, Pennsylvania 15230 SECY(3)

WDircks

Dear Mr. Rahe:

KCornell TRehm I am pleased to respond to your letter dated June 7,1982, to Mr. W. Dircks discussing the licensing of an Advanced PWR ( APWR) design. Your letter has been referred to me for reply.

i The near term schedule and overall licensing program proposed in your letter have been reviewed by the staff. Staff resources are available to support the near term review sessions that were discussed in that letter.

We note that the format of your proposed review sessions will undoubtedly evolve during the review process and may need to be nodified. Our initial view is the staff could not issue partial safety evaluation reports at the conclusion of each review session as you have requested. The staff could, however, document the minutes of each session, including all agreements and commitments made. This would thus facilitate the assembling of the parts into an SER at the appropriate time. We trust that you will find this method of documentation suitable for your purposes.

We would be pleased to meet with you, at your convenience, to discuss the framework and specific schedule that you propose for this effort.

Sincerely, l

Orvirul Siguel bg H. R. Dentag ;

l l

Harold R. Denton, Director Office of Nuclear Reactor Regulation T' l/

/

y) al 8207300422 820714 A

PDR TOPRP EMVWEST t

O'b C

PDR

  • SEE PREVIOUS CONCURRENCE FOR INITIALS

,p

  • 'dl

/

RET]g,c,,

DL:L*

DL:L*

DL*

NRR*

NR ED0

.pGg..s.pn h.u.t..... W asg_,

HRQg

.n..

WJpirghs_. _

1gb i

7/9Ru m >.htt.igan_. _% M gs.go.

om>.05/2.0/.02....... 9#1.RB/.62.... 06/.30/.82....

. 02/B2.....

.01/9 8.2....01848.2...

NRC FORM 318 (10-Is0) NRCM 024o OFF1ClAL RECORD COPY uscro --mm

I

?O

.,l DI_STRIBUTION c iCentral; Files NRC PER PRC System DL:L Reading VStello RTedesco/JKerrigan HDenton/ECase L. Berry PPAS DEisenhut/RPurple RMinogue M.Jambor GCunningham Mr. E. P. Rahe, Jr., Manager OELD SHanauer Nuclear Safety Department SCavanaugh,NRR(ED0#12012)

Westinghouse Electric Corporation MBridgers,ED0(ED0#12012)

Post Office Box 355 I&E Pittsburgh, Pennsylvania 15230 SECY(3)

RVollmer WDi rcks RMattson

Dear Mr. Rahe:

KCornell PCheck TRehm BSnyder 6e. 7, I am pleased to respond to your letter dated-/w 1^,1982, to Mr. W. Dircks discussing the licensing of an Advanced PWR (APWR) design. Your letter has been referred to me for neply.

The near term schedule and overall licensing program proposed in your letter have been reviewed by the staff. Staff resources are available to support the near tenn review sessions that were discussed in that letter.

We note that the format of your proposed review sessions will undoubtedly evolve during the review process and may need to be modified. Our initial view is the staff could not issue partial safety evaluation reports at the conclusion of each review session as you have requested. The staff could, however, document the minutes of each session, including all agreements and commitments made. This would thus facilitate the assenbling of the parts into an SER at the appropriate time. We trust that you will find this method of documentation suitable for your purposes.

We would be pleased to meet with you, at your convenience, to discuss the framework and specific schedule that you propose for this effort.

Sincerely, Wais neOy e

_ H. R. Denten Harold R. Denton, Director Office of Nuclear Reactor Regulation

  • SEE PREVIOUS CONCURRENCE FOR INITIALS 4 A

retX#Rce>.DL.:L*

....DL :L.*......

..DL*....

'..NRR..

NRR. h...

EDO...

7/6 1>

1gbcucue>.JKerr.igan:.1b...RTedes.co...... dei.s.enhut....

...EG C a s.e........ ti Denton........ WRitc.4.s........

.. 6/.30/82 07/..../. 82 07/1 /82 07/ /82 0 6.../. 2 8../. 82........

... 06/.28./.82 0

om>

nnc ronu m oo sm Nncu eno OFFICIAL RECORD COPY esam mem

~

3.

DISTRIBUTION JCentral LFiles u

~NRC~PDR PRC System DL:L Reading R. Tedesco/J. Kerrigan L. Berry D. Eisenhut/ R. Purple bor Mr. E. P. Rahe, Jr., Manager D

Nuclear Safety Department Westinghouse Electric Corporation S. Cavanaugh,NRR (ED0#12012)

Post Office Box 355 M. Bridgers,EDO (ECO#12012) hY(3)

Pittsburgh, Pennsylvania 15230 N

k$

Dear Mr. Rahe:

K rne 1 TRehm I am pleased to respond to your letter dated May 10,1982, to Mr. W. Dircks discussing the licensing of an Advanced PWR (APWR) design. Your letter has been referred to me for reply.

The near term schedule and overall licensing program proposed in your letter have been reviewed by the staff. Limited staff resources are available to support the near tenn review sessions that wem discussed in that letter.

We note that the format of your proposed review sessions will undoubtedly evolve during the review process and may need to be modified slightly.

Because the formal staff review would not be initiated until the application for a PDA is received, the staff would likely not issue an official partial safety evaluation report at the conclusion of each review session. The staff could, however, docunent, for your futum use, the minutes of each session, including all agreements and consnitments made. This would thus facilitate the assembling of the parts into an SER at the appropriate time.

We trust that you will find this method of documentation suitable for your purposes.

We would be happy to meet with you, at your convenience, to discuss the frame-work and specific schedule that you propose for this effort.

Sincerely, Harold R. Denton, Director Office of Nuclear Reactor Regulation S. Hanauer V. Stello R. Mattson H. Denton/E. Case R. Vollmer PPAS P. Check R. Minogue B. Snyder G. Cunningham omce >. DL:

,,, D.LI

  1. fk

. ).........tlRR.....

..NRR..

suamc > b n:.lb....R,L,',',,,p,p,s c o,,,,,,,,%L$$[ut EGCas.e,,,,,, H,RDen t,g,,,

q

'............ouft2.aa......... 9.Qc,,,,az..,

.... 9.ez..../.aa.....ne./...../.aa.'..

om>

NRC FORM 31s 03-80) NRCM ONO OFFIClAL RECORD COPY usom i-m. co

r

-~

4 m

,F ROM:

ACTION CONTROL DATES CONTROL N b*

NO COMPL DEADLINE ~

yf9fa9 i

,kestlaghouse Eltetric CGPperation ACKNOWLEDGMENT DATE OF DOCUMENT-NTeniu ntPLv TO:

U71M PR6PAiTE FOl SIGNATURE l e OfrCIS FINAL REPLY g'7!

CHAIRMAN FILE LOCATION # h 7, 2[- e L

- O EXECUTIVE DIRECTOR

-//4 Vl oTsEn -- u DEsCRieTION LETTEn OuEuO O nEPOnT O OTNen SeECI AL INSTRUCTIONS OR REMARKS Devdo; cent and Licenstn; of an Advanced This letter replaces the 5/10/32 letter P'JR (Arn) plar.t design from W, sana subject (ED011M3). It, has requested the eartfer letter be returned to them. All copies of Eco 11M3 shev14 CLASSIFIED DATA OOCUMENT/ COPY NO.

CLASSIFICATION l NUMBER OF PAGES CATEGORY POSTAL REGIST RY NO.

O Nsl O no O FRD ASSIGNED TO.

DATE INFORMATION ROUTING LEGAL REVIEW D FINAL 0 COPY

%= ten, c" s/21/*T Dircks Mfaegue

^S S'""'

^7"

$7h'$AL B JECTIONS T1youtus 6/2i/a2 "8II C""" Y' U'

^ " ' " ' ' " " ' ' " "

3. Mattson j-M Sese/Dentsa 4. - Vollmer exy g y)0
    • T== COMMEN TS, NOTIF Y:
1..PPAS 5.

thosepson

' E x r. -

2. ' INI34 NAE NOTIFICATION RECOMMENDED:

O vEs O NO

-NRCF RM 232 DO NOT REMOVE TH/S COPY' b.

EXECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL-CORRESPONDENCE CONTROL i

- ~-

. ~...