Discusses NRC Confirmation of Commitment Made by Util That Plant Would Not Proceed Beyond Operational Mode 3 Until NRC Meets W/Staff to Review Results of Efforts to Identify & Correct Conditions Causing Unexpected Movement of CEAs
ML20058F153
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/01/1993
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
References
CAL-4-93-14, NUDOCS 9312080009
Download: ML20058F153 (4)


Text

..

NUCLEAR REGULATORY COMMISSION

'S R EGloN IV 611 RYAN PLAZA DRIVE, SUITE 400

,/

ARLINGTON, TEXAS 760114064 4

+*.+

DEC - 1 1583 Docket: 50-285 License: DPR-40 CAL 4-93-14 Omaha Public Power District ATW :

T. L. Patterson, Division Manager Nuclear Operations Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399, Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399

SUBJECT:

CONFIRMATORY ACTION LETTER (CAL)

By letter dated November 19, 1993, NRC conf-med a comitment made by Omaha Public Power District during a telephone conversation between Terry L.

Patterson, Division Manager, Nuclear Operations, and T. P. Gwynn, Deputy Directer, Division of Reactor Projects, on November 19, 1993.

During this conversation, you comitted that Fort Calhoun Station would not proceed beyond operational % 3 until you met with the NRC staff to review the results of your efforts to i entify and correct the condition that was causing unexpected d

movement of controi element assemblies and the NRC staff was satisfied with your innediate correJive actions.

On November 22, 1993, you and members of your staff met with members of the NRC staff in an open public meeting conducted at the Fort Calhoun Station to discuss your findings relative to the causes of the unexpected movement of control element assemblies ad the immediate corrective actions to prevent recurrence of this problem.

Based on the information presented at this meeting and the findings of an NRC Augmented Inspection Team, I determined that you satisfied the commitments docume'.ad in the CAL and that operations beyond operational Mode 3 could proceed.

fhis decision was verbally comunicated to you on November 22, 1993.

Pursuant to Section 182 of the Atomic Energy Act. 42 U.S.C. 2232, and 10 CFR 2.204, you are required to notify me imediately if your understanding differs from that set forth above.

Should you have any questions regarding this letter, please contact Thomas F.

Stetka of my staff at (817) 860-8247.

Jincerely, i

070D06 Ms#T. Mi ho

[v ph aegional Administrator 9322080009 932202 h

DR ADOCK 05000285 PDR

s i

Omaha Public Power District i l

l f

CC*

LeBoeuf, Lamb, Leiby & MacRae t

IJTN: Mr. Michael F. McBride 1875 Connecticut Avenue, NW Washington, D.C.

20009-5728 Washington County Board of Supervisors ATTN: Jack Jensen, Chairman Blair, Nebraska 68008 Combustion Engineering, Inc.

l ATTN: Charles B. Brinkman, Manager i

Washington Nuclear Operations 12300 Twinbrook P rKway, Suite 330 Rockville, Maryland 20852 N;braska Department of Health ATTN: Harold Borchert, Director Division of Radiological Health 301 Centennial Mall, South P.O. Box 95n07 Lincoln, Nebraska 68509-5007 t

Fort Calhoun Station ATTN: James W. Chase, Manager P.O. Box 399

[

Fort Calhoun, Nebraska 68023 l

l i

i i

Omaha Public Power District DEC - I H233 bcc to DMB (IE36) bcc:

J. L. Milhoan DRSS-FIPS RIV File Lisa Shea, RM/ALF, MS: MNBB 4503 Resident Inspector MIS System Section Chief (DRP/TSS)

Senior Resident Inspector - Cooper NRC Public Document Room Nebraska Radiation Control Program Director J. H. Sniezek, DEDR (17 G21)

J. L. Lieberman, D/0E (2) (7 H5)

L. J. Chandler, Asst. GC/0GC (15 B18)

T. E. Murley, D/NRR (12 G18)

RIV Coordinator, OEDO (17 G21)

J. L. Milhoan, RA L. J. Callan, D/DRSS S. J. Collins, D/DRS A. B. Beach, D/DRP G. F. Sanborn, E0 W. L. Brown, RC J. Carson, ORA M6 J. T. Gilliland, PA0 T. F. Stetka DR0/D Section File AI 93-322 1

RIV:DRP/D*

C:DRP/D*

D.DRP*

DRA R

KMKennedy;df TFStetka ABBeach JMMontgomery JL 1 hoan 11/ /93 11/ /93 11/ /93 11/ /93 lij /93

  • Previously concurred

~

~'

93 V:OUSCONCURRENCE 3 AGE Omaha Public Power District.

D bec to DMB (IE36) l bcc:

i J. L. Milhoan DRSS-FIPS RIV File Lisa Shea, RM/ALF, MS: MNBB 4503 Resident Inspector MIS System l

Section Chief (DRP/TSS)

Senior Resident Inspector - Cooper NRC Public Document Room

~,

Nebraska Radiation Control Program Director J. H. Sniezek, DEDR (17 G21)

J. L. Lieberman, D/0E (2) (7 H5) i L. J. Chandler, Asst. GC/0GC (15 B18)

T. E. Murley, D/NRR (12 G18)

RIV Coordinator, OED0 (17 G21)

J. L. Hilhoan, RA t

L. J. Callan, D/DRSS S. J. Collins, D/DRS A. B. Beach, D/DRP G..F. Sanborn, E0 W. L. Brown, RC J. Carson, ORA RIV File J. T. Gilliland, PA0 T. F. Stetka DRP/D Section File t

i AI 93-322 f

RIV:DRP/DY C:DRP/

D RP.

3 DRA RA KMKennedy;df TFStetka ASBeidd JMMontgomery JLMilhoan 114S/93 II/f1/93 11/30/93 11/ /93 11/ /93 t

[

,.