ML20058E891
From kanterella
Jump to navigation
Jump to search
ML20058E891 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 11/30/1993 |
From: | Bernreuter D, Campbell R, Chen J, Chuang T, Hashimoto P, Jerrica Johnson, Kincaid R, Lappa D, Maslenikov O, Putcha C, Ravindra M, Sues R, Tiong L, Wells J EQE, INC., LAWRENCE LIVERMORE NATIONAL LABORATORY, NTS (NATIONAL TECHNICAL SYSTEMS) |
To: | NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
References | |
CON-FIN-A-1386 NUREG-CR-4832, NUREG-CR-4832-V08, NUREG-CR-4832-V8, UCID-21245, NUDOCS 9312070214 | |
Download: ML20058E891 (290) | |
Similar Documents at LaSalle | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20106H1261995-12-12012 December 1995
[Table view]IPE Insight Rept NUREG-1150 Plants ML20058E8911993-11-30030 November 1993 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Seismic Analysis ML20045B9481993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant:Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Appendices D-G ML20045B9041993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) Appendices A-C ML20116J6551992-10-31031 October 1992 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant. Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Melcor Code Calculations ML20116J4791992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Flood Analysis ML20116J5311992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Initiating Events and Accident Sequence Delineation ML20105C7631992-08-31031 August 1992 Integrated Risk Assessment for Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) ML20105C8221992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Appendices ML20105C8171992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Main Report ML20113H9891992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Integrated Quantification and Uncertainty Analysis ML20099D6251992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).External Event Scoping Quantification ML20099D5281992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Summary ML20097H3161992-06-30030 June 1992 Trip Rept:Onsite Analysis of Human Factors of Event at LaSalle 2 920420 (Reactor Water Cleanup Sys Isolation Bypass) ML20012E2671990-03-31031 March 1990 Risk Sensitivity to Human Error in the Lasalle PRA ML19332B5801989-09-30030 September 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components: La Salle-1/-2, Technical Evaluation Rept ML20058K0861989-07-31031 July 1989 Technical Evaluation Rept on Response from Commonwealth Edison to Generic Ltr 88-01 Pertaining to LaSalle County Station,Unit 2 ML20058K0921989-07-31031 July 1989 Technical Evaluation Rept on Response from Commonwealth Edison to Generic Ltr 88-01 Pertaining to Lasalle County Station,Unit 1 ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20042D0871988-08-0404 August 1988 Simulations of BWR Power Oscillations W/O Scram, Informal Rept ML20150A8641988-05-31031 May 1988 Pump & Valve Inservice Testing Program,Lasalle County Station,Units 1 & 2 ML20153D2101988-01-31031 January 1988 Approaches to Uncertainty Analysis in Probabilistic Risk Assessment ML20236X2871987-10-31031 October 1987 Fire Environment Determination in the Lasalle Nuclear Power Plant Control Room ML20215L9661987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2,Vendor Interface Programs for All Other Safety-Related Components, La Salle Units 1 & 2, Informal Rept ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20155D6271986-02-14014 February 1986 Mod Program Controls, Based on 860210-14 Review ML20141N6051986-01-14014 January 1986 SPDS Progress Review,Lasalle,Units 1 & 2 ML20244D3981985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. ML20134J5091985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station & WPPSS-2 ML20244D4411985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station Units 1 & 2 & Washington Nuclear Plant Unit 2. Contains Info for LaSalle ML20101G1541984-12-31031 December 1984 Conformance to Reg Guide 1.97,LaSalle County Station,Units 1 & 2 ML20076J2711983-05-31031 May 1983 Control of Heavy Loads at Nuclear Power Plants,Lasalle Units 1 & 2 (Phase Ii), Draft Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20065B7131982-06-30030 June 1982 Control of Heavy Loads at Nuclear Power Plants LaSalle Units 1 & 2 ML20010E7751981-07-31031 July 1981 Audit of Environ Qualification of Safety-Related Electrical Equipment at La Salle County Station (Unit 1), Technical Evaluation Rept 1995-12-12 Category:QUICK LOOK MONTHYEARML20106H1261995-12-12012 December 1995
[Table view]IPE Insight Rept NUREG-1150 Plants ML20058E8911993-11-30030 November 1993 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Seismic Analysis ML20045B9481993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant:Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Appendices D-G ML20045B9041993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) Appendices A-C ML20116J6551992-10-31031 October 1992 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant. Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Melcor Code Calculations ML20116J4791992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Flood Analysis ML20116J5311992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Initiating Events and Accident Sequence Delineation ML20105C7631992-08-31031 August 1992 Integrated Risk Assessment for Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) ML20105C8221992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Appendices ML20105C8171992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Main Report ML20113H9891992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Integrated Quantification and Uncertainty Analysis ML20099D6251992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).External Event Scoping Quantification ML20099D5281992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Summary ML20097H3161992-06-30030 June 1992 Trip Rept:Onsite Analysis of Human Factors of Event at LaSalle 2 920420 (Reactor Water Cleanup Sys Isolation Bypass) ML20012E2671990-03-31031 March 1990 Risk Sensitivity to Human Error in the Lasalle PRA ML19332B5801989-09-30030 September 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components: La Salle-1/-2, Technical Evaluation Rept ML20058K0861989-07-31031 July 1989 Technical Evaluation Rept on Response from Commonwealth Edison to Generic Ltr 88-01 Pertaining to LaSalle County Station,Unit 2 ML20058K0921989-07-31031 July 1989 Technical Evaluation Rept on Response from Commonwealth Edison to Generic Ltr 88-01 Pertaining to Lasalle County Station,Unit 1 ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20042D0871988-08-0404 August 1988 Simulations of BWR Power Oscillations W/O Scram, Informal Rept ML20150A8641988-05-31031 May 1988 Pump & Valve Inservice Testing Program,Lasalle County Station,Units 1 & 2 ML20153D2101988-01-31031 January 1988 Approaches to Uncertainty Analysis in Probabilistic Risk Assessment ML20236X2871987-10-31031 October 1987 Fire Environment Determination in the Lasalle Nuclear Power Plant Control Room ML20215L9661987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2,Vendor Interface Programs for All Other Safety-Related Components, La Salle Units 1 & 2, Informal Rept ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20155D6271986-02-14014 February 1986 Mod Program Controls, Based on 860210-14 Review ML20141N6051986-01-14014 January 1986 SPDS Progress Review,Lasalle,Units 1 & 2 ML20244D3981985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. ML20134J5091985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station & WPPSS-2 ML20244D4411985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station Units 1 & 2 & Washington Nuclear Plant Unit 2. Contains Info for LaSalle ML20101G1541984-12-31031 December 1984 Conformance to Reg Guide 1.97,LaSalle County Station,Units 1 & 2 ML20076J2711983-05-31031 May 1983 Control of Heavy Loads at Nuclear Power Plants,Lasalle Units 1 & 2 (Phase Ii), Draft Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20065B7131982-06-30030 June 1982 Control of Heavy Loads at Nuclear Power Plants LaSalle Units 1 & 2 ML20010E7751981-07-31031 July 1981 Audit of Environ Qualification of Safety-Related Electrical Equipment at La Salle County Station (Unit 1), Technical Evaluation Rept 1995-12-12 Category:ETC. (PERIODIC MONTHYEARML20106H1261995-12-12012 December 1995
[Table view]IPE Insight Rept NUREG-1150 Plants ML20058E8911993-11-30030 November 1993 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Seismic Analysis ML20045B9481993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant:Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Appendices D-G ML20045B9041993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) Appendices A-C ML20116J6551992-10-31031 October 1992 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant. Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Melcor Code Calculations ML20116J4791992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Flood Analysis ML20116J5311992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Initiating Events and Accident Sequence Delineation ML20105C7631992-08-31031 August 1992 Integrated Risk Assessment for Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) ML20105C8221992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Appendices ML20105C8171992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Main Report ML20113H9891992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Integrated Quantification and Uncertainty Analysis ML20099D6251992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).External Event Scoping Quantification ML20099D5281992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Summary ML20097H3161992-06-30030 June 1992 Trip Rept:Onsite Analysis of Human Factors of Event at LaSalle 2 920420 (Reactor Water Cleanup Sys Isolation Bypass) ML20012E2671990-03-31031 March 1990 Risk Sensitivity to Human Error in the Lasalle PRA ML19332B5801989-09-30030 September 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components: La Salle-1/-2, Technical Evaluation Rept ML20058K0861989-07-31031 July 1989 Technical Evaluation Rept on Response from Commonwealth Edison to Generic Ltr 88-01 Pertaining to LaSalle County Station,Unit 2 ML20058K0921989-07-31031 July 1989 Technical Evaluation Rept on Response from Commonwealth Edison to Generic Ltr 88-01 Pertaining to Lasalle County Station,Unit 1 ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20042D0871988-08-0404 August 1988 Simulations of BWR Power Oscillations W/O Scram, Informal Rept ML20150A8641988-05-31031 May 1988 Pump & Valve Inservice Testing Program,Lasalle County Station,Units 1 & 2 ML20153D2101988-01-31031 January 1988 Approaches to Uncertainty Analysis in Probabilistic Risk Assessment ML20236X2871987-10-31031 October 1987 Fire Environment Determination in the Lasalle Nuclear Power Plant Control Room ML20215L9661987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2,Vendor Interface Programs for All Other Safety-Related Components, La Salle Units 1 & 2, Informal Rept ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20155D6271986-02-14014 February 1986 Mod Program Controls, Based on 860210-14 Review ML20141N6051986-01-14014 January 1986 SPDS Progress Review,Lasalle,Units 1 & 2 ML20244D3981985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. ML20134J5091985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station & WPPSS-2 ML20244D4411985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station Units 1 & 2 & Washington Nuclear Plant Unit 2. Contains Info for LaSalle ML20101G1541984-12-31031 December 1984 Conformance to Reg Guide 1.97,LaSalle County Station,Units 1 & 2 ML20076J2711983-05-31031 May 1983 Control of Heavy Loads at Nuclear Power Plants,Lasalle Units 1 & 2 (Phase Ii), Draft Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20065B7131982-06-30030 June 1982 Control of Heavy Loads at Nuclear Power Plants LaSalle Units 1 & 2 ML20010E7751981-07-31031 July 1981 Audit of Environ Qualification of Safety-Related Electrical Equipment at La Salle County Station (Unit 1), Technical Evaluation Rept 1995-12-12 Category:NUREG REPORTS MONTHYEARML20058E8911993-11-30030 November 1993
[Table view]Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Seismic Analysis ML20045B9481993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant:Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Appendices D-G ML20045B9041993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) Appendices A-C ML20116J6551992-10-31031 October 1992 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant. Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Melcor Code Calculations ML20116J4791992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Flood Analysis ML20116J5311992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Initiating Events and Accident Sequence Delineation ML20105C8171992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Main Report ML20105C7631992-08-31031 August 1992 Integrated Risk Assessment for Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) ML20105C8221992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Appendices ML20099D5281992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Summary ML20113H9891992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Integrated Quantification and Uncertainty Analysis ML20099D6251992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).External Event Scoping Quantification ML20012E2671990-03-31031 March 1990 Risk Sensitivity to Human Error in the Lasalle PRA ML20153D2101988-01-31031 January 1988 Approaches to Uncertainty Analysis in Probabilistic Risk Assessment ML20236X2871987-10-31031 October 1987 Fire Environment Determination in the Lasalle Nuclear Power Plant Control Room ML20055B2791982-07-31031 July 1982 Safety Evaluation Report Related to the Operation of La Salle County Station,Units 1 and 2.Docket Nos. 50-373 and 50-374.(Commonwealth Edison Company) ML20150B9761978-11-30030 November 1978 Fes for Facility 1993-05-31 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20106H1261995-12-12012 December 1995
[Table view]IPE Insight Rept NUREG-1150 Plants ML20058E8911993-11-30030 November 1993 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Seismic Analysis ML20045B9481993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant:Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Appendices D-G ML20045B9041993-05-31031 May 1993 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) Appendices A-C ML20116J5311992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Initiating Events and Accident Sequence Delineation ML20116J4791992-10-31031 October 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Flood Analysis ML20116J6551992-10-31031 October 1992 Integrated Risk Assessment for the Lasalle Unit 2 Nuclear Power Plant. Phenomenology and Risk Uncertainty Evaluation Program (Pruep).Melcor Code Calculations ML20105C8221992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Appendices ML20105C8171992-08-31031 August 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Internal Events Accident Sequence Quantification.Main Report ML20105C7631992-08-31031 August 1992 Integrated Risk Assessment for Lasalle Unit 2 Nuclear Power Plant.Phenomenology and Risk Uncertainty Evaluation Program (Pruep) ML20113H9891992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep). Integrated Quantification and Uncertainty Analysis ML20099D6251992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).External Event Scoping Quantification ML20099D5281992-07-31031 July 1992 Analysis of the Lasalle Unit 2 Nuclear Power Plant: Risk Methods Integration and Evaluation Program (Rmiep).Summary ML20097H3161992-06-30030 June 1992 Trip Rept:Onsite Analysis of Human Factors of Event at LaSalle 2 920420 (Reactor Water Cleanup Sys Isolation Bypass) ML20012E2671990-03-31031 March 1990 Risk Sensitivity to Human Error in the Lasalle PRA ML19332B5801989-09-30030 September 1989 Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components: La Salle-1/-2, Technical Evaluation Rept ML20058K0861989-07-31031 July 1989 Technical Evaluation Rept on Response from Commonwealth Edison to Generic Ltr 88-01 Pertaining to LaSalle County Station,Unit 2 ML20058K0921989-07-31031 July 1989 Technical Evaluation Rept on Response from Commonwealth Edison to Generic Ltr 88-01 Pertaining to Lasalle County Station,Unit 1 ML20246B8151989-04-30030 April 1989 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept ML20042D0871988-08-0404 August 1988 Simulations of BWR Power Oscillations W/O Scram, Informal Rept ML20150A8641988-05-31031 May 1988 Pump & Valve Inservice Testing Program,Lasalle County Station,Units 1 & 2 ML20153D2101988-01-31031 January 1988 Approaches to Uncertainty Analysis in Probabilistic Risk Assessment ML20236X2871987-10-31031 October 1987 Fire Environment Determination in the Lasalle Nuclear Power Plant Control Room ML20215L9661987-04-30030 April 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2,Vendor Interface Programs for All Other Safety-Related Components, La Salle Units 1 & 2, Informal Rept ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20155D6271986-02-14014 February 1986 Mod Program Controls, Based on 860210-14 Review ML20141N6051986-01-14014 January 1986 SPDS Progress Review,Lasalle,Units 1 & 2 ML20138R8891985-11-0505 November 1985 Notification of Contract Execution,Mod 2,to Study of Uncertainties in Sys Analysis Part of Seismic Pra. Contractor:Future Resources Assoc,Inc ML20138R8971985-11-0505 November 1985 Mod 2,substituting LaSalle Reactor Review for Limerick Reactor & Deleting E Hall from Key Personnel Clause,To Study of Uncertainties in Sys Analysis Part of Seismic Pra ML20244D3981985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. ML20134J5091985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station & WPPSS-2 ML20244D4411985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, LaSalle County Station Units 1 & 2 & Washington Nuclear Plant Unit 2. Contains Info for LaSalle ML20101G1541984-12-31031 December 1984 Conformance to Reg Guide 1.97,LaSalle County Station,Units 1 & 2 ML20076J2711983-05-31031 May 1983 Control of Heavy Loads at Nuclear Power Plants,Lasalle Units 1 & 2 (Phase Ii), Draft Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20065B7131982-06-30030 June 1982 Control of Heavy Loads at Nuclear Power Plants LaSalle Units 1 & 2 ML20010E7751981-07-31031 July 1981 Audit of Environ Qualification of Safety-Related Electrical Equipment at La Salle County Station (Unit 1), Technical Evaluation Rept 1995-12-12 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20058E891&oldid=3625375"