Forwards Requalification Exam Rept 50-282/OL-93-02 on 931101-17
ML20058E686
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 11/29/1993
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Antony D
NORTHERN STATES POWER CO.
Shared Package
ML20058E691 List:
References
NUDOCS 9312070125
Download: ML20058E686 (2)


Text

s m

~ <

s*

November 29, 1993

'5

Docket No. 50-282 Northern States Power Ccmpany ATTN: Mr. D. D. Antony Vice President, Nuclear Generation 414 Nicollet Hall Minneapolis, MN 55401

Dear Mr. Antony:

SUBJECT:

REQUALIFICATION EXAMINATION REPORT During the week of November 1,1993, and on November 17, 1993, the NRC administered requalification examinations to employees of your organization who operate your Prairie Island Nuclear Generating Plant. At the conclusion of the examinations, any generic findings were discussed with those members of your staff identified in the enclosed report.

Two individuals were administered reactor operator (RO) examinations and two individuals were administered senior reactor operator (SRO) examinations. One RO failed the examination. All others passed. On November 17, 1993, following remedial training, an NRC administered requalification retake examination was given to the R0 and he passed the examination.

In accordance with the criteria of NUREG-1021, Revision 7, Operator Licensing Examiner Standards, ES u01, a requalification training program evaluation rating was not assigned. The results of this examination will be incorporated with the results of future examinations to provide an evaluation at a later date.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, Original signed by Thomas M. Eurdick (for) 0%00 Mark A. Ring, Chief Operations Branch

Enclosures:

1.

Examination Report No. 50-282/0L-93-02(DRS) 2.

Requ W fication Program Evaluation Report 3.

Simulation Facility Fidelity Report See Attached Distribution Rill RIql RII RIII R II Eh a dt/fe/jk/cs B

ey B

ick etz ftRing I

11/z//93 11/yi/93 11/gj/93 11/21/93 11/ /93 g

9312070125 931129 f

O0 fh/ji/ C -/ 8 X D

JS-Northern States Power Company 2

November 29, 1993 t

Distribution i

cc w/ enclosures-E. L. Wi.tzl, Site Manager, Prairie Island Site

+

M. Wadley, Plant Manager T. Amundson, Training Manager OC/LFDCB M. Gamberoni, LPM, NRR R. Gallo, OLB, NRR Resident Inspector, RIII Prairie Island Resident Inspector, RIII Monticello John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA State Liaison Officer, MN 1