BALTIMORE GAS AND ELECTRIC CHARLES CENTER e P.O. BOX 1475 e BALTIMORE. MARYLAND 21203-1475 LEON D RUSSELL wuctraIsa et a etawNo ctPanturwT October 29,1990 U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
Subject:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 and 2; Docket Nos. 50-317 and 50-318 P I P Imolementation Proaram - Revision 5
References:
(a)
Baltimore Gas & Electric Company letter dated July 31, 1989, from Mr. G. V. McGowan to Mr. James M. Taylor (NRC), Performance improvement Pian Implementation Program (b) '. Baltimore Gas & Electric Company letter dated September 7,1990 from Mr. L. B. Russell to Document Control Desk (NRC), Performance improvement Plan L
implementation Program Revision 4 1
L Gentlemen:
l Enclosed please find Revision 5 to the Calvert Cliffs Performance Improvement Plan Implementation Program (PIP IP), originally submitted by Reference (a) and most recently revised by Reference (b). This revision provides progress through the third quarter of 1990.
It is our intent to integrate the PIP IP with our Nuclear Program Plan in the near future to maintain continued performance improvement. Acknowledging this long term objective, a new Action Plan, 5.3.7, Drawing improvement Program,' is contained in this revision to initiate improvements in the control of plant drawings.
Appendices A, B, and C have also been updated to reflect the progress of existing
- Action Plans and Appendix D has been added for completed Action Plans.
Other changes in this revision include a description of our October 1,1990 reorganization (Section 3.1), adjustments to the scope of the remaining Effectiveness Verification assessments (Section 6.3) and changes to the milestones of a number of Action Plans to improve correlation with the actual computerized schedules.
r
.m, p1
)
4 9
e
.1 l
7,.
Document Controf Desk October 29,1990 Page 2 This revision replaces the entire contents of the PIP-IP, with the exception of the tabs. Change bars have been placed in the margins of those pages which have been revised, with the exception of Appendices A, B and C, which are completely revised. Please refer to the attached instructions for incorporating this revision.
I We recently completed implementation Verification of Action Plar 3.2, Managing Organizational and Program Change, bringing to thirteen the total number of Action Plans which have been verified as fully implemented.
Any questions regarding the enclosed revision or our future plans are welcome.
Very truly yours, f
LBR/RCLO/mgl Enclosures -