Forwards Insp Repts 50-352/93-26 & 50-353/93-26 on 931004-08.No Violations Noted
ML20058E473
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/24/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20058E475 List:
References
NUDOCS 9312070026
Download: ML20058E473 (2)


See also: IR 05000352/1993026

Text

.

.

NOV 2 41993

.

h

Docket No.

50-352

50-353

f

Mr. D. M. Smith

Senior Vice President-Nuclear

l

Philadelphia Electric Company

r

Nuclear Group Headquarters

Correspondence Control Desk

P.O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT:

NRC REGION I COMBINED INSPECTION REPORT NOS. 50-352/93-26

-

AND 50-353/93-26

t

T

This letter transmits the report for the announced inspection conducted by Ms. Leanne Kay

of this office on October 4-8,1993, at the Limerick site and at your corporate office in

Chesterbrook, Pennsylvania. Ms. Kay discussed the findings of this inspection with

l

'

members of your staff at the conclusion of the inspection.

.

Areas examined during this inspection focused on matters important to public health and

safety and included closure of previous Electrical Distribution System Functional Inspection

j

(EDSFI) outstanding items for Units 1 and 2. The inspection included review of resolutions

'

and corrective actions pertaining to transformer load controls, undervoltage relay

measurements, fuse size validation, and pump backpressure requirements. The inspection

consisted of selected examinations of design records, calculations, and procedures, interviews

with personnel, and observations by the inspectors.

j

.

i

.Within the scope of this inspection, no violations were identified. A previously identified

'

issue involving system design for independence between onsite and offsite power sources was

also reviewed during this inspection.

.

i

i

0600 4;

!

i

i

9312070026 931124

,

-

PDR

ADOCK 05000352

l

0

PDR;

j

i

. . . -

-

.

._

l

..

NOV 2 41993

1

-

Philadelphia Electric Company

2

No reply to this letter is required. Your cooperation with us is appreciated.

j

Sincerely,

'

Original EirJ C' D:

T.K.Icpen

t

1

Jacque P. Durr, Chief

l

Engineering Branch

Division of Reactor Safety

-

,

i

Enclosure: NRC Region I Combined Inspection Report No. 50-352/93-26 and 50-353/93-26

}

cc w/ encl:

J. Docring, Chairman, Nuclear Review Board

I

D. R. Helwig, Vice President - Limerick Generating Station

'

G. A. Hunger, Jr., Manager - Licensing Section

J. L. Kantner, Regulatory Engineer - Limerick Generating Station

Secretary, Nuclear Committee of the Board

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

,

'

Commonwealth of Pennsylvania

,

!

bec w/ encl:

,

Region I Docket Room (with concurrences)

.

D. Vito, RI (RI-92-A-0212)

t

i

bec w/ encl: (Via E-Mail)

i

V. McCree, OEDO

F. Rinaldi, NRR

.

L. Nicholson, Acting PDI-2, NRR

,

!

i

'

,

<

(0

RI:DRS

RI:DRS

RI:DRS

RI':IMS

Della Greca

Rulandy'

1Durf

i

Ka>h

\\

&llg.

-

11/ 4/93

11/0/93

11//9/93

11/[//93

2

OFFICIAL RECORD COPY

q

A: LIM 9326. INS

4

i

I

f'

Sp a

.

y

-

.

_-

_