ML20058E473
| ML20058E473 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 11/24/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20058E475 | List: |
| References | |
| NUDOCS 9312070026 | |
| Download: ML20058E473 (2) | |
See also: IR 05000352/1993026
Text
.
.
NOV 2 41993
.
h
Docket No.
50-352
50-353
f
Mr. D. M. Smith
Senior Vice President-Nuclear
l
Philadelphia Electric Company
r
Nuclear Group Headquarters
Correspondence Control Desk
P.O. Box 195
Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT:
NRC REGION I COMBINED INSPECTION REPORT NOS. 50-352/93-26
-
AND 50-353/93-26
t
T
This letter transmits the report for the announced inspection conducted by Ms. Leanne Kay
of this office on October 4-8,1993, at the Limerick site and at your corporate office in
Chesterbrook, Pennsylvania. Ms. Kay discussed the findings of this inspection with
l
'
members of your staff at the conclusion of the inspection.
.
Areas examined during this inspection focused on matters important to public health and
safety and included closure of previous Electrical Distribution System Functional Inspection
j
(EDSFI) outstanding items for Units 1 and 2. The inspection included review of resolutions
'
and corrective actions pertaining to transformer load controls, undervoltage relay
measurements, fuse size validation, and pump backpressure requirements. The inspection
consisted of selected examinations of design records, calculations, and procedures, interviews
with personnel, and observations by the inspectors.
j
.
i
.Within the scope of this inspection, no violations were identified. A previously identified
'
issue involving system design for independence between onsite and offsite power sources was
also reviewed during this inspection.
.
i
i
0600 4;
!
i
i
9312070026 931124
,
-
ADOCK 05000352
l
0
PDR;
j
i
. . . -
-
.
._
l
..
NOV 2 41993
1
-
Philadelphia Electric Company
2
No reply to this letter is required. Your cooperation with us is appreciated.
j
Sincerely,
'
Original EirJ C' D:
T.K.Icpen
t
1
Jacque P. Durr, Chief
l
Engineering Branch
Division of Reactor Safety
-
,
i
Enclosure: NRC Region I Combined Inspection Report No. 50-352/93-26 and 50-353/93-26
}
cc w/ encl:
J. Docring, Chairman, Nuclear Review Board
I
D. R. Helwig, Vice President - Limerick Generating Station
'
G. A. Hunger, Jr., Manager - Licensing Section
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
Secretary, Nuclear Committee of the Board
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
,
'
Commonwealth of Pennsylvania
,
!
bec w/ encl:
,
Region I Docket Room (with concurrences)
.
D. Vito, RI (RI-92-A-0212)
t
i
bec w/ encl: (Via E-Mail)
i
V. McCree, OEDO
F. Rinaldi, NRR
.
L. Nicholson, Acting PDI-2, NRR
,
!
i
'
,
<
(0
RI:DRS
RI:DRS
RI:DRS
RI':IMS
Della Greca
Rulandy'
1Durf
i
Ka>h
\\
&llg.
-
11/ 4/93
11/0/93
11//9/93
11/[//93
2
OFFICIAL RECORD COPY
q
A: LIM 9326. INS
4
i
I
f'
Sp a
.
y
-
.
_-
_