Resubmits 931110 Response to EA-92-152,notice of Violation & Proposed Imposition of Civil Penalty in NRC to Include Notarized Affidavit Which Was Inadvertently Omitted from
ML20058E307
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/17/1993
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF ENFORCEMENT (OE), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
EA-92-152, P-93112, NUDOCS 9312060248
Download: ML20058E307 (5)


Text

+

h Public Service

  • O*":ra,.

P O BOX 840 DENVER CO 80 01-0&W h

16805 Weld County Road 19-1/2 A. Clegg Cravdord i

Platteville, Colorado 80651

((jj[yy, I

November 17, 1993 Fort St. Vrain P-93112 i

Director, Office of Enforcement i

U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 DOCKET NO. 50-267

SUBJECT:

Reply to a Notice of Violation, (NRC Investigation OI 4-91-019; DOL 91-ERA-037) l i

REFERENCE:

1)

NRC Letter, J.

L.

Milhoan to A.

C.

Crawford, dated October 13, 1993 (G-93162) 2)

PSC Letter, A. C. Crawford to Director, Office I

of Enforcement, dated November 10, 1993, i

(P-93105)

Dear Director:

This is a re-submittal of Public Service Company of Colorado's' (PSC) November 10, 1993, response to EA 92-152, NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY, contained ta Reference 1.

This re-submittal is provided to include the notarized affidavit which was inadvertently omitted from the November 10, 1993, letter (Reference 2).

This letter is identical in all other respects to the Reference 2 submittal.

This response is prepared pursuant to the provisions of 10 CFR 2.201.

The Notice states that:

"During an investigation conducted by the NRC's Office of Investigation on November 26, 1991, and February 11-14, 1992, and an investigation by the Department of Labor which was reported on 3

April 29, 1991, a violation of NRC requirements was identified.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the i

violation is set forth below:

j

-l l

3h00i.

I

/he/h (l

9312060248 931117 5

7

-3 PDR ADOCK 05000267 PDR g

q

?

i L

i P-93112 November 17, 1993 Page 2 "10 CFR 50.7 prohibits discrimination by a Commission licensee j

against an employee for engaging in certain protected activities.

Discrimination includes discharge and other actions relating to the compensation, terms, conditions, and-privileges of employment.

The protected activities are described in Section 210 of the Energy Reorganization Act of 1974, as amended (now Section 211), and in general are related to the administration or enforcement of a require.nent imposed

)

under the Atomic Energy Act or Energy Reorganization Act.

3

" Contrary to the above, on March 21, 1991, the licensee's radiation protection manager terminated a contract radiation protection technician in retaliation for the technician's having engaged in a protected activity, i.e., reporting _ to PSC management potential safety concerns relative to the activities and the job performance of a PSC Health Physics Technician.

(01012)

"This is a Severity Level II violation (Supplement VII).

l Civil Penalty - $80,000" In response, the position of PSC remains as follows:

1 (1)

Admission or denial of the alleaed violation:

PSC denies the alleged violation.

(2)

The reasons for the violation if admitted and, if denied the reasons why:

The complainant was released as part of a

downsizing necessitated by the inability of PSC to ship spent reactor l

fuel to the Idaho National Engineering Laboratory in 1991.

I The complainant was chosen to be released based on the assessment of the Radiation Protection Manager that the complainant was demonstrating an inability and unwillingness to deal effectively and appropriately with his coworkers.

After several meetings with complainant in response to a 1

complaint by a coworker in which complainant stated his refusal to change his interpersonal behavior towards coworkers, and after objectively canvassing complainant's peers, the decision was made to release complainant based on his unacceptable behavior.

n --

b i-l P-93112 j

November 17, 1993 i

Page 3 l

l l

PSC acknowledges that the concerns previously raised by the l

complainant were valid, and appropriate management action has been taken to mitigate the safety issues that were raised.

No safety concerns were involved with the release, and the l

release was in no respect based on complainant's reporting of safety concerns or concerns relative to the activities or job performance of a PSC Health Physics Technician.

Facts, explanations, and argunents related to this matter were presented at an Enforcement Conference held on May 10,-1993, i

in Arlington, Texas.

'1 (3)

The corrective steps that have been taken and the results achieved:

Since the alleged violation is denied, no corrective steps were required to be taken.

However, as a result of this j

situation, PSC felt that it would be prudent to take certain j

management actions as follows.

j The complaint mechanisms available to company and i

contractor personnel were reviewed for appropriateness i

and effectiveness.

I To avoid any perception among the work force that complainant's allegations of retaliation for raising safety issues had basis, the Vice President of Nuclear operations issued a " Chilling Effect" memorandum to all employees to remind them of their responsibility to raise safety concerns.

This message was also personally delivered by the Vice President and discussed between management and the employees in a

group meeting-subsequent to complainant's complaint to.the Department of Labor and is regularly emphasized in meetings - and notices.

PSC took steps to strengthen existing mechanisms for dealing with contractor personnel problems.

Prior to complainant's complaint to the Department of Labor in April,1991, PSC had never received any 10 CFR 50.7 complaints in its entire history.

Since the permanent shutdown-of Fort-St.

Vrain in August of 1989, Public ' Service Company of Colorado has dramatically reduced staff-from 771 (including contractor personnel) to 113 (including contractor personnel) with no further alleged violations of 10 CFR'50.7.

1

i P-93112 November 17, 1993 Page 4 (4)

The corrective stens that will be taken to avoid further violations:

i Since the alleged violation is denied, no corrective steps are f

necessary to avoid further violations.

PSC continues to monitor personnel management procedures at Fort St. Vrain to ensure appropriate measures are in place to handle any future personnel problems involving contractor or PSC employees.

i I

(5)

The date when full compliance will be achieved:

Since the alleged violation is denied, Public Service Company

{

of Colorado believes that it has been, is now, and will continue to be in full compliance with the requirements of'10 CFR 50.7.

PSC formally requests a hearing on this matter in accordance with

]

the provisions of 10 CFR Part 2, Section 2.205 (d).

Please contact the Fort St. Vrain Decommissioning Program Director, Mr. Don W.

Warembourg, at (303) 620-1009 to discuss the time and location of f

the hearing or any other questions you might have regarding this j

matter.

l i

Sincerely, l

Ib ?'acM] ford d

?

/v A.

Clegg Craw l

Vice President Electric Production j

ACC/bj 1

cc:

Regional Administrator, Region IV

1 l

~

l UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 1

In the Matter of

)

)

Public Service Company of Colorado

)

Docket No. 50-267 l

Fort St. Vrain Unit No. 1

)

i AFFIDAVIT i

A.

Clegg Crawford being first duly sworn, deposes and says: That he is Vice President, Electric Production, of Public Service Company of Colorado, the Licensee herein, that he has read the information presented in the attached letter and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

j

~

l lYML

}

A. Clegg Crawford Vice President Electric Production i

STATE OF drlt4 ftdc

)

)

I COUNTY OF Mtf/>

)

l 4

1 i

d Subscri.be and sworn to before me, a Notary Public on this i1 d' day of Nor mlu o 1993.

1 i

i 1^

l D % Vnsth

~ 1 lit w Notaty Pjbl~ic i

My commission expires

!!-14

,193Jh i

0

.