7, OMES General Offices
- Seiden Street, BerlinL Connecticut L
j
) 66 5 October 29, 1990 Docket No. 50-423 B13661 Re:
U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 Gentlemen:
Millstone Nuclear Power Station, Unit No. 3 Certification of Plant-Referenced Sinulator Enclosed is the Northeast Nuclear Energy Company submittal for-certifying the Millstone Unit No. 3 simulator as a plant-referenced simulator per 10CFR55.45(b).
Enclosed is a completed, signed NRC form 474 and-four volumes to support this submittal.
t i
The first volume contains general information on the Millstone Unit No. 3 simulator.
The second volume contains the, generic procedure. governing certification of the Millstone Unit No. 3 simulator. -The third volume contains performance test results for the Millstone Unit No. 3 simulator.
The fourth volume contains summaries of all certified malfunctions available on the Millstone Unit No. 3 simulator.
10CFR55.45(b)(b)(ii) requires that licensees "s'tmit, every four years on the anniversary of the certification, a report ' to the Commission which identifies any uncorrected performance test failures."
- Also, Section (b)(5)(vi) requires "a schedule for the conduct of approximately 25 percent of the performance tests per year for the subsequent four years."
NNECO intends to comply with these requirements.
See Volume 3, Performance Test Report, for a description of the approximately 25 percent of performance testing to be completed each year.
Please contact us if you have any qur J. ions.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY As E. J. K Senior (gczka Vice President-cc:
T. T. Martin, Region I Administrator D. H. Jaffe, NRC Project Manager, Millstone Unit Na. 3.
W. J. Raymond, Senior Resident Inspector, Millstona Unit Nos.1, 2, and 3 1
9011070022 901029
,O.[/
b PDR ADOCK 05000423 O
OS3422 REV. 4 88 P
PDC A
,QQ,']
\\
l ~~ 1 a
i NM f o*se ela V 8. NUCLE AR REOULATOR v COM.M.iltio t e
'!!'.Wi'"I SIMULATION FACILITY CERTIFICATION g%.
.oe 1-INST AUCTIONS. This form is to be f ded tot inital cert 1<cabof'. t certification bt required), and for any change to a simulation facility performanc frade af er initial submittal of luch a plan. Provide the following er' formation, and check the appropriate box to indicate reason for sabmittai t
F ACILIT Y Millstone Unit 3 lDOCAlf NUMBER I
423 g
LIC E NSE E Northeast Nuclear Energy Company Daft e.n....,.,..io,.,.
w
.u s.
...,. e mu..
..e
.,'~1 ni...n
, i
,.e n.,ni.., io e i n.. :
i=*,,
n a s.a s. i.m.~,,,.., oc....w
=.n.. s m.ho e..
Io=c
.n....
wmn io cen a.. o.n.
u,.n..,,. e
. n-xcept ns, 8ee ToTume
.u..1, p a g e.. I.dn,
..na
.n NAMI ter other toenttiscJrion) AND LOCATION OF SIMULA1lON F ACitif Y Lelan F. Sillin, Jr. Nuclear Training Center, Waterford, CT 06385-0128 y l 0lMVLATI% F ACILITY PER FORMANCE T E ST ABSTRACTS ATTACHE D. /For perfor"1ence tests coadistettin tha persod erieferig wich the s DESCRIPflON OF PE RFORM ANCE T ESTING COMPLETED IArrech eddst.onalpapets/ v vesury, andsdents' the trem ds.cr# prion bemy gonrmuest)
Refer to Millstone Unit 3 Simulator Certification submi L.1 b l coenmencmq wurh the tiare 09 thus rert,9xation IS4MUL A1 ION 0 AGI(II Y Pt R6 QRM ANCE ilStING SCHEDULL Al1 ACHE D. If or the ronduCf of ap l
DL SC R iP T ION OF Pt R F ORM ANCE T LST ING 10 8i CONDUCT E D IAtrach sodersonstpeveIs/ as n.reswy, and identary the stem ae.criptson bemy continued)
Refer to Millstone Unit 3 Simulator Certification submittal l PE R F ORM ANCl it sTlNG PL AN CH ANGt (For eny mog,focation to o pertarmance restmg plan submrtted on s prevuous tert!!ncaroon)
DE SC RIPisON OF PE RIORM ANCE T E STING PL AN CH ANGE IA rrach ar*sereone/ pagetri as nerassary, aard novntery the item trescription being continued; Initial submittal, not applicable.
HLCt H t t> iCA t son t A rrack o&s.roo.u page, Dea rube corr.tr,ve act,ans tan,,ea. stracs resutts or ompoetna performance resting m accoraance noth b G* R ll 65 45;DitS)tro s as necessary and non,,9y q e, rem ese,enpoon t.c r
n e,eq conein.,9 6 u
Initial submittal, not npp.11 cable.
i Aoy Idae listement of Ometteon m Inig GoCument, ericludens) attachments, may De lubtect to C.wie and Cnmmet lanCtsnt m.no arm 1.fiaChmenf t,% tr e ent$ Co.,0Cf 1 Cef tdy u d.f Dene!ty Of De,iury indt the into,metion in Inal n
Clocu u
(
SGNATURE AUTHOAIZED REPRESENTATIVE lI"LE lD*11 l
Senior Vice President g,,p g in accordance witn to CF R g K Communicat/s tnis form snau be submitteo to tne N RC as follows:
{
BY Mall ADDRESSED TO. Director,0ffice of Nuclear Reactor Regulation BY DELIVERY IN PERSON l
U.S. Nuclear Regulatory Commission TO THE NRC OFFICE AT: 7920 Norfolk Avenue l
Washmgton, DC 20555 Betheida. MD l
.