~ WUCLEAR REGULATORY COMMISSION j]
WASHING TON, D. C. 20555 f
, 7p 4
'.... f 4
SAFETY' EVALUATION BY THE'0FFICE OF NUCLEAR REACTOR REGULATION
'RELATED TO PE00EST FOR RELIEF FROM ASME CODE REPAIR REOUIREMENTS s
+
9-FOR ASME CODE CLASS ~3 PIPING' NORTHEAST NUCLEAR' ENERGY COMPANY.-ET Al s;-
MILLSTONE NUCLEAR' POWER STATION'-UNIT NO. 3 DOCKET'NO. 50-423 s
1 1 : BACKGROUND i
Temoorary Non-Code Repairs-
-10 CFR 50.55a(g) requires nuclear power facility piping and components to: meet 3
N the applicable requirementsiof Section XI of the' ASME. Boiler and Pressure -
Vessel Code (hereafter called the code).- Section XI of the code. specifies code'-acceptable-repair methods' for flaws that exceed code acceptance limits in :
3 piping:that is in service. A code repair is' required to restore the structural integrity :of flawed code piping, independent of the~ operational mode of the -
- plant when the~ flaw. is detected. Those repairs not in compliance with Section-
'XILof~the code ~are non-code repairs.- However, tne required code repair may be'-
".w 11mpractical.: Pursuantito'-10 CFR 50a(g)(6)(ii). the Commission.will evaluate-
- determinations of impracticality, and may grant relief and may impose ~ alterna-
'a tive requirements. Generic Letter 90-05,. entitled " Guidance for Performing 1
Temporary Non-Code Repair of ~ ASME Code. Class 1,:2, t.nd. 3 Piping," and dated
. June 15,1990, provides guidance-for the staff in evaluating relief requests submitted by licensees,for temporary non-code repairs of code Class 3 piping.-
i TThescommission may gran't relief based on a staff evaluation considering the guidancetin ' Generic ' Letter 90-05.
Y
< Licensee's Relief Reci=st
'By. letter dated September 26, 1990,, Northeast Nuclear Energy Company-(the w*
jlicensee)1requestedrelieffromccderepairrequirements-ofcertaincode i
- Class 3 pipi.ng at Millstone Unit 3.. A pinhole leak was detected in the code
.1 p
Class-3 moderate energy service water system piping during plant operation.
l and the licensee.has detemined that confomance with code-repair requirements h
L, isimpractical..-Pursuant'to.10CFR50.55a(g)(5)(iii),thelicenseesubmitted La relief request to the Commission. The subject piping ~is a.6-inch expansion e
p
" joint fabricated from Monel..The licensee proposed a temporary non-code repair by replacing the subject piping with one. fabricated from rubber, which
'is a non-code material.
m
'II.
EVALUATION OF RELIEF REQUEST Code Reauirement Article IWA-4000 of Sectior XI of the code specifies the code repair procedures.
1 9011070011 901016 c
ADOCK 05000423 PDC m
.m A...
~
.....a-.
--~-~
1
y, r
&u
- ~ J m
g
~
. g..
,m Code' Relief-Request Relief is: requested'from performing a code repair for the flaw detected during i
f plant l operation.in code Classi3' piping.
Basis for Relief-1 Code ~ repair; requirements.are impractical because a wel.d repair cannot be
]
performed on the subject expansion joint bellows and e code qualified repla:e-o "-
1 ment cannot be obtained for several months.
q f
. Proposed Alternative.
- The licensee proposed.to-utilize the guidance in Generic Letter 90-0540 perform at temporary non-code repair..
f Staff 3 Evaluation'and Conclusions Dw ~
1 y'
The staff has determined that; code repair requirements in this case are
' impractical. ThisLis because the subject expansion joint bellows cannot be weldLrepaired;and a code qualified: replacement'is not readily available. The q
p, p
Jdesign:of(the rubber: expansion' joint' temporary replacement 1siconsistent with D
L the originaliexpans_ ion joint. -Although-the rubber material is not a code d
L material', it is compatible for seawater-.' serviceand is not ex)ected to 1
l; y~
+.in a.few months. Furthermore, the licensee hasicommitted to the guidance
, : experience any: material degradation before..it is replaced wit1.a code repair 1
u h
Lprovided in Generic Letter 90-05 which will reasonably assure structural i
+
Lintegrity and protect public. health and safety. Accordingly, the staff i
concludes that granting relief-where code requirements are impractical and
' imposing alternative requirements are. authorized.by law and will'not endanger lifel or property orsthe'comon' defense and; security.'and are' otherwise in' the -
i.
p
' public : interest,: given <due consideration to the burden upon the' licensee and
. facilitysthat'couldoresult?if. the. code requirements were. imposed on the p
facility.:' Pursuant to 10 CFR 50.55a(g)(6)(1) and consistent with the guidance.
o u
.in Generic Letter 90-05, reli_ef is: granted until the next scheduled refueling.
H
5 outageL(approximately March of.1991). ' The temporary non-code repair must-then i
K
.be replaced with a codeLrepair.
l:c Regulatory Issue i
.mf
' :In.a recent NRC plant inspection, it was found that the licensee had performed
'l 4
{-
?aitemporary non-code repair on the subject piping without prior written relief T
. granted by the Consnission. The-licensee was.not in compliance with NRC.
regulations' when. the ^ subject repair was performed. This issue will be 1
' ';g addressed :in a forthcoming.NRC inspection report.
n Principal' Contributor:
C.Y. Cheng and D. Jaffe Dated: October 16,1990
f
,s
- 1-
' b[,
7j; i;
x/:,:j,#-
o n;
l{ _ '
~
R
_~J k
NRC'&~ Local-PD P1antiFile lT.- Murley/F; Miraglia (12G18) l
. J. Parlow '(12G18)
- I LC..Rossi' 11E4
.'S. LVarga~i 14E4 i
B..Boger) 14A2 i
'.S. Norris-l
-D."Jaffe OGC1
.E.~ Jordan'(MNBB3302)-
.j G. Hilli (4)' (P1-137) ~
' ACRS '(10) L GPA/PA
-0C/LFMBL J. Caldwell C.Y._.Cheng l
I 1,.
l l
2 I
n; l
0
~,
,y c i
i,
(
t
.l i
i