{{#Wiki_filter:' . , e
November 24, 1993 Docket No. 50-346 Centerior Energy ATTN: Mr. L. R. Storz Vice President Nuclear Davis-Besse c/o Toledo Edison Company 300 Madison Avenue Toledo, OH 43652 Dear Mr. Storz: The enclosed report refers to the inspection conducted by Mr. D. Shepard and Mr. C. Osterholtz of this office on November 1 - 5, 1993. The inspection evaluated activities at the Davis-Besse Nuclear Power Station authorized by NRC Operating License No. NPF-3. We discussed our inspection findings with Mr. S. Jain and members of your staff at the exit interview on November 5, 1993. The purpose of the inspection was to assess the licensed operator requalification program. The inspectors reviewed training administrative procedures, representative records, requalification training materials, and observed licensed operators during requalification examination administration. Additionally, the inspectors interviewed members of the operations and training staffs. Overall, the inspectors concluded that the licensed operator requalification training program was being implemented in accordance with 10 CFR Part 55 requirements. Based on the results of this inspection, certain of your activities appeared to be in violation of NRC requirements, as specified in the enclosed Notice of Violation (Notice). The violation, regarding the failure of a licensed operator to obtain a required medical evaluation, is of concern because of prior notification of problems with licensed operator medical examinations was provided in NRC Information Notice 91-08, issued February 5,1991, and you had ample opportunity to identify discrepancies in your own medical evaluation program. You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC Public Document Room. 9312060101 931124 'U PDR ADOCK 05000346 fg g ( f ( - //6 / Q PDR
- . .
t ' Centerior Energy 2 November 24, 1993 We will gladly discuss any questions you may have concerning this inspection. . Sincerely, i original signed by T. M. Burdick , for Mark A. Ring, Chief Operations Branch . Enclosures: 1. Notice of Violation 2. Inspection Report No. 50-346/93021(DRS) 3. Simulation Facility Report cc w/ enclosures: J. K. Wood, Plant Manager W. T. O'Connor, Manager , Regulatory Affairs D. C. Shelton, Senior Vice President - Nuclear ! State Liaison Officer, State of Ohio Robert E. Owen, Ohio , Department of Health
A. Grandjean, State of Ohio, Public Utilities Commission OC/LFDCB Resident Inspector, RIIT Licensing Project Manager, NRR M. W. Hodges, RI A. F. Gibson, RII S. J. Collins, RIV K. E. Perkins, Jr. , RV l ' B. Boger, RCHF, NRR l J. S. Wermiel, HFAB, NRR l bcc w/ enclosures: PUBLIC - IE01 RIII (}{{} RIII
RIII RIII She)l3 3 RD k [1(4 T pard /cg Burdick Lanksbury ring 11/>y/93 II/J5f/93 11/v1/93 11/.ty93 - . }}