i VERMONT YANKEE Proposed Change No.102 NUCLEAR POWER CORPORATION 2.C.15.1 FVY 82-85 RD 5, Box 169, Ferry Road, Brattleboro, VT 05301 y'
ENGINEERING OFFICE 1671 WORCESTER ROAD N
FRAMINGHAM, MASSACHUSETTS 01701 TELEPHONE 617-872-8100 g ygg United States Nuclear Regulatory Commission Wa shing t on, D. C. 20555 Attention:
Office of Nuclear Reactor Fegulation
References:
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, USNRC to VYUPC, dated April 22, 1982; Inspection Report No. 50-271/82-03
Subject:
Limiting Conditions for Operation - Standty Liquid Control System
Dear Sir:
Pursuant to Section 50.59 of the Commissions Rules and Regulations, Vermont Yankee Nuclear Power Corporation hereby proposes the following modifications to Appendix A of the Operating License.
Proposed Change:
Replace page 80 using the attached page. This page discusses the Limiting Conditions as relates to the operability of the Standby Liquid Control System.
Reason & Bases for Change:
The current Technical Specifications do not clearly specify the actions to be taken when the SLC tank concentration / volume limits are not met.
In accordance with the recornendations contained in Eeference (b), this proposed change is intended to clarify the LCO requirements as relates to SLC Tank requirements, and specify what actions will te taken when those requirec:ents a re no t n:e t.
The requirements dealing with Tank Concentration / Temperature have already teen administrative 1y applied to the station as a result of the problems described in Reference (b).
Safety Considerations:
This proposed change is administrative in nature and is intended only to clarify the actions that must be taken when certain parameters are not within established limits.
This proposed change has teen reviewed by the Vermont Yankee nuclear Safety Audit and Review Committee.
8207270372 820722
$A E
PDR ADOCK 05000271 po\\
g eg4
}
P pyg k htC\\
VERMONT YANKEE NUCLEAR POWEH CORPORATION United States Nuclear Regulatory Commission July 22, 1982 l
Attention: Office of Nuclear Reactor Regulation Page 2 Fee Determination:
This proposed change is pro forma, administrative in nature and has no l
safety or environmental significance. For these reasons, Vermont Yankee Nuclear Power Corporation proposes this change as a Class II Amendment and a payment of $1,200.00 is enclosed.
Schedule of Change:
Tbc proposed changes will be incorporated into the Technical Specifications as soon as practical following receipt of your approval.
We trust submittal is acceptable to you; however, should you have any questions, please contact us.
Very truly yours, i
VE NT YANKEE NUCLEAR PCUER CORPORATION Louis H. Heider i
Vice President COMMONWEALTH OF MASSACHUSETTS)
)ss MIDDLESEX COUNTY
)
Then personally appeared before rne, Louis H. Heider, who, being duly sworn, did state that he is a Vice President of Vermont Yankee Nuclear Power Corporation, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Vermont Yankee Nuclear Power Corporation and that the statements therein are true to the best of his knowledge and belief.
L,,g, $ ! '/%,,
(lm B. Sinclair Notary Public y Commission Expires June 1, 1984 f.,.f. j,,,f., 'f,.
f '" 9; 9 *,
' %.' / d
>.,,1 i~
..% 5, 2.
, 5 g. -
' Q' g.
- j, S.o..
.. _ _ _