ML20058D770

From kanterella
Jump to navigation Jump to search
Forwards June 1990 Reactor Containment Bldg Integrated Leak Rate Test & Periodic Local Leak Rate Tests & Separate Rept Re Local Leak Rate Test Results from Core 19/20 Refueling Outage
ML20058D770
Person / Time
Site: Yankee Rowe
Issue date: 10/29/1990
From: Papanic G
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058D772 List:
References
BYR-90-144, NUDOCS 9011060268
Download: ML20058D770 (1)


Text

'

V YANKEE ATOMICELECTRIC COMPANY

"*fy"ll*. *]l'*;"l" 580 Main Street, Bolton, Massachusetts 01740-1398 v.

October 29, 1990 BYR 90-144 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Reference:

(a) License No. DPR-3 (Docket No. 50-29)

T

Subject:

10CFR50, Appendix J, Test Results for 1990 Dear Sirst j.

Enclosed are two reports entitled " June 1990 Reactor Contsinment Building

/

Integrated. Leak Rate Test and Periodic Local Leak Rate Tests" and " Separate Report Concerning Local Leak Rate Test Results f rom the Core 19/20 Refueling Outage." These reports cover 10CFR50, Appendix J, testing conducted at Yankee Nuclear Power Station during our Core 19/20 refueling outage.

We trust that you will find these reports satisfactory. However, if you i

have any questions, please contact us.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY l

Georg

apanic, Senior Project Engit. ear Licensing GP/gjt/WPP72/141 Enclosures cc: USNRC Region I USNRC Resident Inspector. YNPS Ol0 pkOd'$88$$ hk PDC