Forwards ...Cycle 13 Startup & Power Escalation Physics Testing Rept & BAW-2098, Irradiation of Four 17x17 Mark-BW Lead Assemblies in Trojan,Cycle 13 Design Rept
ML20058D636
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/29/1990
From: Cross J
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058D639 List:
References
NUDOCS 9011060190
Download: ML20058D636 (1)


Text

1 m

g Pbrtissid M EledricCortimery)r James E. Cross Vice President, Nuclear i

l October 29 1990 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attnt Document Control Desk Washington DC 20555 Dear Sirs Cycle 13 Startup and Power Escalation Physics Testing Pursuant to Trojan Facility Opoe ting License No. NPF-1 Technical Specification 6.9.1.1 "Startup i ocrt", the following report is submitted to aununarize the testing following installation of fuel that has been manufactured by a different fuel supplier.

Sincerely,

++*---

Attachment c

Mr. John D. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. R. C. Barr l-NRC Resident Inspector Trojan Nuclear Plant l.'

9011060100 901029 I

PDR ADOCK 05000344 P

PDC 1

1 121 SW Salmon St, Portland, OR 97204 IP, g j, lis 503/464-8897-

/

!'