ML20058D636
| ML20058D636 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 10/29/1990 |
| From: | Cross J PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20058D639 | List: |
| References | |
| NUDOCS 9011060190 | |
| Download: ML20058D636 (1) | |
Text
1 m
g Pbrtissid M EledricCortimery)r James E. Cross Vice President, Nuclear i
l October 29 1990 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attnt Document Control Desk Washington DC 20555 Dear Sirs Cycle 13 Startup and Power Escalation Physics Testing Pursuant to Trojan Facility Opoe ting License No. NPF-1 Technical Specification 6.9.1.1 "Startup i ocrt", the following report is submitted to aununarize the testing following installation of fuel that has been manufactured by a different fuel supplier.
Sincerely,
++*---
Attachment c
Mr. John D. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. R. C. Barr l-NRC Resident Inspector Trojan Nuclear Plant l.'
9011060100 901029 I
PDR ADOCK 05000344 P
PDC 1
1 121 SW Salmon St, Portland, OR 97204 IP, g j, lis 503/464-8897-
/
!'