ML20058D408

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/93-33 & 50-499/93-33 on 931012-15.No Violations Noted
ML20058D408
Person / Time
Site: South Texas  
Issue date: 11/26/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20058D412 List:
References
NUDOCS 9312030147
Download: ML20058D408 (5)


See also: IR 05000498/1993033

Text

-

.m

.

..

_

_ _ _ -

_ _ _ _ . _

._

-

-

@**EGv

UNITED ST ATES

,

l-

%

NUCLEAR REGULATORY CONiMISSIOM

+

j J /2

}

REGION IV

'.

kh II

'f

611 RY AN PLAZA DRIVE, SUIT E 400

,j

e

AR LINGTON, TEXAS 76011-8064

.....

NOV 261993

1

Dockets:

50-498

l

50-499

Licenses: NPF-76

NPF-80

Houston Lighting & Power Company

ATTN: William T. Cottle, Group

i

'

Vice President, Nuclear

P.O. Box 289

j

Wadswori.ii, Texas 77483

SUBJECT:

NRC INSPECTION REPORT 50-498/93-33; 50-499/93-33

j

This refers to the inspection conducted by Mr. T. O. McKernon of this office

'l

on October 12 through 15, 1993. The inspection included a review of

l

activities authorized for your South Texas Project facility. -' At the

_

!

conclusion of the inspection, the findings were discussed with you and those

members of your staff identified in the enclosed report.

l

I

Areas examined during the inspection are identified in the report. - Within

these areas, the inspection consisted of a review of Restart Issue 2, Station

!

Problem Report (SPR) Process, as identified in Attachment 2_ of NRC Inspection

,

Report 50-498/93-31; 50-499/93-31. At the conclusion.of this inspection,--the

j

management of the SPR backlog and the process for SPR , investigation had been

reviewed.

Restart Issue 2 remained open with the related items from

Attachment 2 of NRC Inspection Report 50-498/93-31;.50-499/93-31 warranting ~

j

further inspection (Results Section, page 2).

'

,

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

'

this letter and its enclosures will be placed in the NRC Public Document Room.

,

l

Should you have any questions concerning this inspection, we will be pleased

!

to discuss them with you.

'

. Sincerely

Q

I

y

A.BillBeach,Direhtyr'-

'

F Division of Reactor 7roject./

i

l

!

Enclosure:

(See next page)

!

.!

16

9312030147 931126

PDR

ADDCK 05000498

\\

!

G

PDR w.

O

j

V&

L

.

--

-

.

..

.

-

-.

.-

- -

- -

-

-

. . .

- _ _ _ _ _ _

_ _ -

.,

.

.

i

Houston Lighting & Power Company

-2-

Enclosure:

Appendix - NRC Inspection Report

50-498/93-33; 50-499/93-33 w/ attachments

cc w/ enclosure:

Houston Lighting & Power Company

ATTN: James J. Sheppard, General Manager

Nuclear Licensing

P.O. Box 289

Wadsworth, Texas 77483

,

City of Austin

Electric Utility Department

ATTN:

J. C. Lanier/M. B. Lee

721 Barton Springs Road

Austin, Texas 78704

City Public Service Board

ATTN:

K. J. Fiedler/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

Newman & Holtzinger, P. C.

ATIN: Jack R. Newman, Esq.

1615 L Street, NW

Washington, D.C.

20036

Central Power and Light Company

ATTN:

G. E. Vaughn/T

M. Puckett

P.O. Box 2121

Corpus Christi, Texas 78403

INPO

Records Center

700 Galleria Parkway

Atlanta, Georgia 30339-5957

Mr. Joseph M. Hendrie

50 Bellport Lane

Bellport, New York 11713

Bureau of Radiation Control

State of Texas

1100 West 49th Street

Austin, Texas 78756

.

-

Houston Lighting & Power Company

-3-

i

l

Judge, Matagorda County

Matagorda County Courthouse

-

1700 Seventh Street

i

Bay City, Texas 77414

Licensing Representative

Houston Lighting & Power Company

Suite 610

Three Metro Center

Bethesda, Maryland 20814

Houston Lighting & Power Company

ATTN: Rufus S. Scott, Associate

General Counsel

P.O. Box 61867

Houston, Texas 77208

.

l

i

a

l

,

l

i

i

!

-

,

.

Houston Lighting & Power Company

-4-

i

l

.

I

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

Section Chief (DRP/A)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/A)

R. Bachmann, OGC, MS: 15-B-18

Section Chief (DRP/TSS)

A. B. Beach, D/DRP

l

T. O. McKernon

l

l

l

l

i

1

i

i

!

i

n _i '/

\\

  • RIV:RI:DRP/A
  • C:DRP/,A'

-4hBRG-

D:DRP kb

T0McKern(gk NDJpinson

4JC+1Me

ABBeach )/

11/th93

- ' 11/1.J/93

-11/ /93

114/93

$

-

  • Previously concurred

i

__

_ _ - _ _ _ .

L ).,

.

p

,

Houston Lighting & Power Company

-4-

i

bccto.DMB(IE01)T\\

j

bcc distrib. by RIV:

i

'

J. L. Milhoan

Resident Inspector

Section Chief (DRP/A)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

'

RIV File

Project Engineer (DRP/A)

R. Bachmann, OGC, MS: 15-B-18

Section Chief (DRP/TSS)

A. B. Beach, D/DRP

T. O. McKernon

l

i

i

As /

D:DRPk)D

  • RIV:RI:DRP/A
  • C:DRP/,/

4+0RS-

![

10McKernhk NDJjhn' son

-SJCollins

ABBeach

ll/th93

$1/p/93

41/ /93

1147f/93

0

  • Previously concurred

0300G1

l

l

.