ML20058D133
| ML20058D133 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/20/1982 |
| From: | Faster D, Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-179, NUDOCS 8207270032 | |
| Download: ML20058D133 (2) | |
Text
4 b
a Georgia Power Company h
Post office Boa 4545 Atlanta, Georgia 30302 Telephone 404 522-6060 Southern Company Services, Inc.
- ' ;py 9
Alj h
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 July 20, 1982 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street File: X7BG03-M25 Atlanta, Georgia 30303 Log: GN-179 Attention:
Mr. James P. O'Reilly
Reference:
Vogtle Electric Generating Plant - Units 1 and 2 50-424; 50-425 Embeds - 1982 Gentlemen:
On April 26, 1982, Mr. Virgil Brownlee of the NRC was notified by Mr. E. D. Groover, quality assurance site supervisor for Georgia Power Company at the Vogtle Project, of a potential deficiency concerning embeds.
Georgia Power Company has gathered the necessary information required to perform an engineering evaluation.
This information includes lack of full thread engagement (distance from back of plate) and the bolts which were inaccessible for visual inspection. An engineering evaluation must be made to determine if:
a) the embed plate is acceptable for use in its present condition, or b) repair work can be performed on the embed plate, or c) the embed plate must be derated, or d) the embed plate must be abandoned At the present time, Georgia Power Company cannot determine a date by which our evaluation will be completed. An interim report will be sent to the NRC on or before September 17, 1982.
@MNni,,3ap.
8207270032 820720 1
PDR ADOCK 05000424
-y/
~"
S PDR
A U. S. Nuclear Regulatory Commission Atlanta, Georgia 30303 File:
X78G03-M25 Log:
GN-179 July 20, 1982 Page Two This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.
Your trul f
D. O. Foster Project General Manager CWH:sb xc:
U. S. Nuclear Regulatory Commission Attn:
Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washington, D.C.
20555 R. J. Kelly R. E. Conway G. F. Head J. H. Boykin D. E. Dutton D. L. McCrary R. A. Thomas J. A. Bailey O. Batum H. H. Gregory, III E. D. Groover L. T. Gucwa M. Malcom i
l C. R. Miles, Jr.
I M. Manry R. W. Sta ffa J. L. Vota J. T. Beckham, Jr.
R. H. Pinson W. F. Sanders 1
l l
l l