ML20058D068
ML20058D068 | |
Person / Time | |
---|---|
Site: | 07001100 |
Issue date: | 10/30/1990 |
From: | Scherer A ABB ATOM, INC. (FORMERLY ASEA ATOM, INC.) |
To: | Knapp M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
NQ-90-007, NQ-90-7, NUDOCS 9011050296 | |
Download: ML20058D068 (2) | |
Text
r i
g co -
Ast A DHOWN HOVUu October 30, 1990 HQ-90-007 Docket No. 70-1100 License No. SNM-1067 s
Dr. Malcolm R.
Knapp, Director Division of Radiation Safety and Safeguards U.
S.
Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406
Subject:
Independent Audits of Windsor Nuclear Fuel Manufacturing
Dear Dr. Knapp:
Following a meeting on October 23, 1990 between you and your staff and Messrs. R.
E. Vaughan and J.
F.
Conant, our Plant Manager.and Manager of Nuclear Materials Licensing, respectively, it came to my attention that considerable discussion arose regarding the " independence" of audits performed under the cognizance of Nuclear Fuels management.
I believe that part of the confusion may have occurred l
becauso, at Combustion Engineering, Dr.
S.
T.
Brewer, the President of ABB Combustion-Engineering Nuclear Power, has 1-assigned-the responsibility for independent oversight to a reporting chain that is, in fact, independent of Nuclear Fuels Independent' oversight in thus, not solely: applied through the audit, inspection, surveillance and review functions conducted within the Nuclear' Fuels department.
It is rather my' responsibility,'as the Chairman of the Nuclear Safety Committee, to provide Dr. Brewer with an independent audit of-the programs and practices of Windsor Nuclear Fuel Manufacturing.
The Nuclear Safety Committee has met this requirement utilizing-its members and/or knowledgeable consul'tants 9011030296 901030 PDR ADOCK 07001100 C
PDC ABB Combustion Engineering Nuclear Power n4 nr A tsare scwe, comnusi.on oyamy w teumnone (203) 2as s200 v
W:e bescent 1000 Prospect na F%j Fax (203) 28s 5203 g.,7 c_._, n-
/J2/;
Nuclear OuaMy
. Post Offee Don 500
Dr.
M.
R.
Knapp NQ-90-007 October 30, 1990 Page 2 which are independent of Windsor Nuclear Fuel Manufacturing.
(For example, one of our current consultants is Mr. H.
Eskridge, the Manager of Nuclear
, Licensing, Safety and Accountability at our Hematite facility.)
I firmly believe there should be no question i
that the Nuclear Safety Committee's audits are, in fact, independent as required.
In meeting Dr. Brewer's requirements, I am also meeting the requirement of the facility license that an annual audit be performed by an
" Independent Safety. Committee".
If I can be of any assistance on this matter, please do not hesitate to contact me.
Very truly yours, A.
E.
Scherer AES:nly H. Bidinger(C-E)
T. Brewer cc:
S,
-G.
(NRC)
J. H. Joyner (NRC - Region I)
T. T.-Martin (NRC - Region I)
.