Forwards Notice of Violation & Insp Rept for License DPR-24 & DPR-27
ML20058C942
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/18/1993
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20058C945 List:
References
NUDOCS 9312020637
Download: ML20058C942 (2)


Text

.

o.-

I NOV 181993 l

t

?

Docket Nos. 50-266; 50-301 Wisconsin Electric Power Company p

ATIN: Mr. R. E. Link

-i Vice President Nuclear Power i

231 West Michigan Street - P379 Milwaukee, WI 53201

Dear Mr. Link:

This refers to the routine safety inspection conducted by Messrs. K. R. Jury and J. Cadzala of this office, from September 7 through October 25, 1993, of activities at the Point Beach Nuclear Plant Units 1 and 2.

Our findings were discussed with Mr. G. J. Maxfield and members of his staff at the conclusion of the inspection.

Areas examined during the inspection are identified in the report.

Within' these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations.

During this inspection, certain of your activities appeared-to be in violation f

of NRC requirements, as specified in the enclosed Notice. One violation concerns a service water system isolation valve being inoperable for a time in excess of that allowed by technical specifications.

This violation was in part related to a lack of a questioning attitude by maintenance personnel.

Although this violation meets the criteria for mitigation of enforcement j

sanctions, it is nonetheless being cited due to the length of time the valve was inoperable and the numerous missed opportunities _ to correct the fault.

A second violation with three examples concerns inadequate instructions for performing maintenance activities. These violations are of concern because g

they indicate a breakdown in the maintenance work and review process and t

continuing weaknesses in communications.

j An additional violation concerns a failure to perform post-maintenance testing. However, as described in the enclosed inspection report, you identified this violation. Therefore, the violation will not be subject to enforcement action because your efforts in identifying and correcting it meet the criteria specified in Section VII.8 of the " General Statement of Policy-and Procedure for NRC Enforcement Actions," (Enforcement Policy 10 CFR Part 2 Appendix C).

i t

0 0 G P.N. R 9312O20637 93111B PDR ADOCK 05000266 G

PDR

f i

NOV 181993 i

Wisconsin Electric Power 2

I Company l

You are required to respond to this letter and should follow the instructions i

specified in the enclosed Notice when preparing your response.

in your i

response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC enforcement actions i

are necessary to ensure compliance with the NRC regulatory requirements.

l In accordance with 10 CFR 2.790 of the Commission's regulations, a copy.of this letter, the enclosures, and your response to this letter will be placed l

in the NRC Public Document Room.

The responses directed by '.his letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Public Law No. 96.511.

I j

We will gladly discuss any questions you have concerning this inspection.

j Your cooperation with us is appreciated.

f Sincerely, l

h

  • L : '

~. : c;wd 17 L.

0 mn;**

L. Robert Greger, Chief l

Reactor Projects Branch 3

Enclosure:

l Inspection Reports No. 50-266/93014(DRP);

No. 50-301/93014(DRP) i cc w/ enclosure:

j G. J. Maxfield, Plant Manager OC/LFDCB Resident inspector, RIII Virgil Kanable, Chief Boiler Section Cheryl L. Parrino, Chairman, t

Wisconsin Public Service Commission

-l State Liaison Officer bcc: fd%N, g