Responds to Requesting That NRC Provide Milestones for Resolution of Issues for EPRI Requirement Document for Passive Plant Designs
ML20058C921
Person / Time
Issue date: 11/19/1993
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Mcdonald R
ALWR UTILITY STEERING COMMITTEE
References
PROJECT-669A NUDOCS 9312020625
Download: ML20058C921 (3)


Text

.

04

<? g are j

,o,,

UNITED STATES

_[

g g

NUCLEAR REGULATORY COMMISSION g

E WASHINGTON, D. C. 20555 e

4*

November 19, 1993 Project No. 669 Mr. R. P. Mcdonald, RP - ARC Bin 854 Southern Company Services Room 518 P. O. 2625 Birmingham, Alabama 35202

Dear Mr. Mcdonald:

SUBJECT:

SCHEDULE FOR PUBLICATION OF THE STAFF'S FINAL SAFETY EVALUATION REPORT (FSER) FOR THE ELECTRIC POWER RESEARCH INSTITUTE (EPRI)

REQUIREMENTS DOCUMENT FOR PASSIVE PLANT DESIGNS This is in response to your letter dated October 19, 1993, which requested that the staff provide milestones for the resolution of issues for the EPRI Requirements Document for passive plant designs. The staff intends to publish its FSER after it receives the letter from the Advisory Committee on Reactor Safeguards (ACRS), which is scheduled for issuance in December 1993. The FSER will include appropriate changes in response to any ACRS comments. The FSER will also include the changes directed by the Commission in the staff requirements memorandum (SRM) dated July 21, 1993, concerning the technical positions proposed by the staff in SECY-93-087, " Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light-Water Reactor (ALWR) Designs." The staff will include many of the points of clarification noted in your letter dated October 19, 1993, in order to make the FSER consistent with the passive Requirements Document, through Revision 5.

It is also possible that the Commission papers on the regulatory treatment of non-safety systems (RTNSS), source term, and emergency planning will be included in the FSER; however, the staff recognizes that the Commission will not have issued the SRM on several issues such as source term and RTNSS. Thus, there is some risk that the technical positions on some issues in the FSER may be subsequently modified by the Commission, but we see value in not delaying for an indeterminate length of time until final guidance is forthcoming.

If necessary, the staff will issue a supplement to the FSER to address comments by the ACRS or additional guidance by the Commission.

The staff concludes that its review of the EPRI Requirements Document is largely complete, with the exception of continued interaction in the future on specific, focused, technical areas.

002066 gwgm:y v

ww w -

u n

)

U.C D L V 2900n db3 '

D 9312O20625 931119

/

PDR PROJ 669A PDR

i Mr. R. P. Mcdonald November 19, 1993 If you have any questions about this letter or any por' ion of the staff's review, contact the project manager, J. H. Wilson, at (301) 504-1108.

Sincerely,

+

(Original signed by)

Dennis M. Crutchfield, Associate Director for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

Central File PDST R/F DCrutchfield WTravers PDR JHWilson RBorchardt RArchitzel PShea TGody, ED0 JMoore, 15B18 ACRS (11) hs 999 43 ut 0FC LA:PDST PM:PDST SC:PDST, D:PDSti ADAR:NRR NAME PSh5aD/OS JHWilson:tz,

RArchikzel RBo[chardt D du'tc N d DATE 11// 7/93 1 1 /17 / 9 11/E/93 11'/ /f/93 11//7/93 OFFICIAL RECORD COPY:

DMCTORPM.JHW a

4

--,r,(

t 2

]

Mr. R. P. Mcdonald Project No. 669 EPRI

{

cc:

Mr. John Trotter i

Nuclear Power Division Electric Power Research Institute Post Office Box 10412 i

Palo Alto, California 94303 i

Mr. Brian A. McIntyre, Manager Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 i

Pittsburgh, Pennsylvania 15230 Mr. Joseph Quirk GE Nuclear Energy Mail Code 782 General Electric Company 175 Curtner Avenue San Jose, California 95125 I

Hr. Stan Ritterbusch Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095

}

.