- r.,
Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 November 18, 1993 LIC-93-0284 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555
References:
- 1. Docket No. 50-285
- 2. Letter from NRC (J. L. Milhoan) to OPPD (T. L. Patterson) dated April 9,1993 (Inspection Report 50-285/93-99)
- 3. Letter from OPPD (W. G. Gates to NRC (Document Control Desk) dated May 7, 1993 (LIC-93-0060 Gentlemen:
SUBJECT:
Extension of Completion Date for Replacement of Effluent Monitoring System In the latest Systematic Assessment of Licensee Performance (SALP) report for Fort Calhoun Station (Reference 2), the NRC included a recommendation that Omaha Public Power District (0 PPD) management should resolve the unreliable performance of the effluent monitors.
In the Reference 3 response, OPPD noted that a major modification to completely repl ace the effluent monitoring system was in progress, and that this modification was to be completed during the 1993 Refueling Outage.
The installation of this modification (MR-FC-84-155) has proven to be more time consuming than originally projected.
Resolution of unanticipated hardware problems and completion of additional tasks such as procedure upgrades have been necessary to achieve acceptable levels of performance and reliability for the new system. Two out of four phases of the project were done prior to the beginning of the refueling outage; however, the remaining tasks cannot be completed on the original schedule without negatively impacting budgetary and personnel resources.
For the reasons noted above, OPPD has extended the project completion date for replacement of the effluent monitoring system to July 1,1994. This revised date has been discussed with the site Resident Inspector.
The revised installation schedule provides for replacement of high maintenance monitors on a priority basis. OPPD continues to maintain operability of old monitors until replacement.
1 9312O20571 951118 M' I}(n PDR ADOCK 05000285
)
G PDR f
as sua cmprert we "parapxtuey
U. S. Nuclear Regulatory Commission LIC-93-0284 Page 2 Please contact me if you have any questions.