See also: IR 05000333/1993022
Text
-.
..
..
.
-
- .
-
E
"
,
.
!
.
l, '
l
'
8
1
!
!
NOV I 51993
!
]
.
i
Docket No. 50-333
!
Mr. Harry P. Salmon, Jr.
Resident Manager
New York Power Authority
[
i
James A. FitzPatrick Power Plant
Post Office Box 41
Lycoming, New York 13093
SUBJECT: NRC REGION I INSPECTION NO. 50-333/93-22
l
This refers to the results of an announced electrical distribution system safety inspection
conducted by Mr. L. Scholl from September 20,1993 to September 24,1993, at James A.
.
FitzPatrick Nuclear Power Plant, Scriba, New York. A summary of the inspection findings
!
was presented to members of your staff at the conclusion of the mspection.
f
.
I
This inspection was directed toward areas important to public health and safety. Areas
examined during the inspection are described in the NRC Region I inspection report, which
j
is enclosed with this letter. Within these areas, the inspection consisted of observation of
j
- activities, interviews with personnel, and document reviews.
t
The inspector found that NYPA's review and response to electrical system deficiencies _
f
identi6ed at other plants was generally good. During our review of your evaluation.of the
!
ability of the emergency diesel generator ventilation system to withstand the effects of a
!
i
tornado, we identi6ed an apparent weakness in the area of operability determinations. We
.
'
request you review this issue and take appropriate actions to address this concern.
I
!
Your cooperation with us is appreciated.
i
i
Sincerely,
l
w ci.en
.
,_
.
t
Jacque P. Durr, Chief
l
?
Engineer'mg Branch
.
Division of Reactor Safety
l
i
Enclosure: NRC Region I Inspection Report Number 50-333/93-22
i
!
C O n r l' n
_.gy
..
9312O20550 931115
/ Il
c
ADOCK 05000333
j'
i
G
-
,
n
a
!
'
.
NOV I 5_1993
l
'
.
New York Power Authority
2
cc w/ encl:
R. Schoenberger, President
j
R. Beedle, Executive Vice President - Nuclear
G. Goldstein, Assistant General Counsel
J. Gray, Jr., Director, Nuclear Licensing - BWR
!
Supervisor, Town of Scriba
l
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
j
Director, Energy & Water Division, Department of Public Service, State of New York
K. Abraham, PAO (30) SALP Reports and (2) All Inspection Reports
j
Public Document Room (PDR)
Local Public Document Room (LPDR)
l
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
!
State of New York, SLO Designee
'
bec w/ encl:
Region I Docket Room (with concurrences)
3
C. Cowgill, DRP
I
i
P. Eselgroth, DRP
R. Urban, DRP
B. Welling, DRP
.;
M. Conner, DRP
s
bec w/cncl (Via FAlail).
V. McCree, OEDO
R. Capra, NRR
J. Menning, NRR
,
'
License Renewal Project Directorate, NRR
i
!
-
i
!
!
l
l
!
RI:DRS
RI:DRS ,
RI:DRS
WRulaa
-
JDurr
LSyholl
Wl
l
[
10//3/93
1f/ /93
11// S 63
OFFICIAL RECORD COPY
,
i
A:FITZ9322. INS
i
!
i-
!
~.
, _ _
_
.
. .
. - - >