ML20058C680
From kanterella
Jump to navigation
Jump to search
ML20058C680 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 04/26/1982 |
From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | |
Shared Package | |
ML20058C601 | List:
|
References | |
50-250-82-20, 50-251-82-20, NUDOCS 8207260420 | |
Download: ML20058C680 (2) | |
Similar Documents at Turkey Point | |
---|---|
Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20136E5151997-03-0707 March 1997
[Table view]Partially Withheld NOV on 970203-07 (Ref 10CFR73.21). Violations Noted:Employee Denied Unescorted Access & Was Not Provided Opportunity for Review of Info on Which Denial of Access Authorization Was Based ML20056E6661993-08-12012 August 1993 Notice of Violation from Insp on 930712-16.Violations Noted: Work Procedure Used for Overhaul of 3B Charging Pump & Pull of Motor Lead Cables Inadequate to Assure Important Activities Satisfactorily Accomplished ML20138F6711991-04-18018 April 1991 Notice of Violation from Insp on 910225-0301.Violation Noted:On 910225-26,licensee Failed to Follow Procedures for Labeling Resin Liners Having Contact Dose Rates Exceeding 1.5 Mrem/Hr Which Were Maintained in Storage Area ML20059N3511990-09-21021 September 1990 Notice of Violation from Insp on 900804-31.Violation Noted: Administrative Policies Not Established to Control Changes to Master Instrument Calibr Data Sheet for Component Cooling Water Pump Automatic Start Pressure Switch ML20235U2121989-02-24024 February 1989 Notice of Violation from Insp on 890117-20.Violation Noted: Licensee Failed to Promptly Classify Event Involving Unit 3 RCS Leakage Greater than 50 Gpm & to Make Timely Notification to State of Fl & NRC ML20207T7141987-03-11011 March 1987 Notice of Violation from Insp on 870112-0209 ML20212H9651987-01-16016 January 1987 Notice of Violation from Insp on 861103-1215 ML20210E2381987-01-13013 January 1987 Notice of Violation from Insp on 861117-21 ML20214J8821986-08-12012 August 1986 Notice of Violation & Proposed Imposition of Civil Penalties on 850826-860515 ML20203C1121986-07-0707 July 1986 Notice of Violation from Insp on 860512-0609 ML20197A8381986-05-0505 May 1986 Notice of Violation from Insp on 860303-07 ML20132E6151985-07-0909 July 1985 Notice of Violation from Insp on 850513-17 IR 05000520/20060101985-07-0808 July 1985 Notice of Violation from Insp on 850520-0610 ML20127G0191985-02-15015 February 1985 Notice of Violation from Insp on 841217-21 ML20129K1711984-10-11011 October 1984 Notice of Violation from Insp on 840715-0817 ML20055A0181982-05-19019 May 1982 Notice of Violation from Insp on 820412-16 ML20062J5051982-05-14014 May 1982 Notice of Violation from Insp on 820403-25 ML20058C6801982-04-26026 April 1982 Notice of Violation from Insp on 820226-0402 1997-03-07 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000250/19970091997-09-26026 September 1997
[Table view]Partially Withheld Insp Repts 50-250/97-09 & 50-251/97-09 on 970825-26.No Violations Noted.Major Areas Inspected: Insp Conducted in Area of Plant Support by Regional Safeguards Specialists ML20149E5981997-03-20020 March 1997 Partially Deleted Investigation Rept 2-96-027 on 970320.No Noncompliance Noted.Major Areas Investigated:Allegation Re Discrimination Against I&C Technician for Raising Safety Concern Re Calibr of Test Equipment IR 05000250/19970021997-03-0707 March 1997 Partially Withheld Insp Repts 50-250/97-02 & 50-251/97-02 on 970203-07 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support ML20136E5151997-03-0707 March 1997 Partially Withheld NOV on 970203-07 (Ref 10CFR73.21). Violations Noted:Employee Denied Unescorted Access & Was Not Provided Opportunity for Review of Info on Which Denial of Access Authorization Was Based PNO-II-93-052, on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure1993-10-0101 October 1993 PNO-II-93-052:on 930930,plant Commenced Unit Shutdown from 100% Power Due to RCS Leakage Through Pressurizer Manway Flange.Unit Currently in Mode 3 at Normal Operating Temp & Pressure PNO-II-93-040, on 930825,two Contractor Painters Struck by Lightning While Working on Turbine Deck in man-basket Approx 50-70 Ft Above Ground.No Damage Identified to Facility.State of Fl Notified1993-08-25025 August 1993 PNO-II-93-040:on 930825,two Contractor Painters Struck by Lightning While Working on Turbine Deck in man-basket Approx 50-70 Ft Above Ground.No Damage Identified to Facility.State of Fl Notified ML20056E6661993-08-12012 August 1993 Notice of Violation from Insp on 930712-16.Violations Noted: Work Procedure Used for Overhaul of 3B Charging Pump & Pull of Motor Lead Cables Inadequate to Assure Important Activities Satisfactorily Accomplished IR 05000250/19930201993-08-10010 August 1993 Insp Repts 50-250/93-20 & 50-251/93-20 on 930712-16. Violations Noted.Major Areas Inspected:Area of Electrical Maint PNO-II-93-025, on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 9306131993-06-10010 June 1993 PNO-II-93-025:on 930610,controlled Shutdown from 100% Power to Mode 5 to Repair Secondary Steam Leak Began.Licensee Planning to Complete Repairs & Return Unit on Line as Early as 930613 IR 05000250/19920331992-12-23023 December 1992 Insp Repts 50-250/92-33 & 50-251/92-33 on 921130-1204.No Violations or Deviations Noted.Major Areas Inspected. Physical Barriers,Intrusion Detection Alarms,Communication & Training & Qualification Plan.Rept Partially Withheld PNO-II-92-055C, on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled1992-09-0303 September 1992 PNO-II-92-055C:on 920824,Hurricane Andrew Passed Directly Over Turkey Point Nuclear Plant W/Wind Reported as High as 140 Mph & Gusts Up to 152 Mph as Measure Before Meterological Equipment Disabled PNO-II-92-055B, on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew1992-08-31031 August 1992 PNO-II-92-055B:on 920830,offsite Power Was Restored to Four Safety Buses Following Loss of Offsite Power to Both Units on 920824,due to Hurricane Andrew PNO-II-92-055A, on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request1992-08-27027 August 1992 PNO-II-92-055A:on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request PNO-II-92-055, on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified1992-08-24024 August 1992 PNO-II-92-055:on 920824,Turkey Point,Unit 3 & 4 Were Shutdown & in Mode 4 W/Hurricane Procedures in Effect.Units 3 & 4 Diesel Generator Manned.State of Fl,Fema,Doe & EPA Notified IR 05000250/19910331991-08-29029 August 1991 Insp Repts 50-250/91-33 & 50-251/91-33 on 910819-23.No Violations Noted.Major Areas Inspected:Training & Surveillance Testing for Upgrade of Emergency Power Sys & Followup of Previously Identified Items ML20138F6711991-04-18018 April 1991 Notice of Violation from Insp on 910225-0301.Violation Noted:On 910225-26,licensee Failed to Follow Procedures for Labeling Resin Liners Having Contact Dose Rates Exceeding 1.5 Mrem/Hr Which Were Maintained in Storage Area IR 05000250/19910081991-04-18018 April 1991 Insp Repts 50-250/91-08 & 50-251/91-08 on 910225-0301. Violations Noted.Major Areas Inspected:Outage HP Acs, Employee Training & Qualifications,Personnel Exposure Monitoring & Assessments & Radioactive Matl IR 05000250/19910101991-04-12012 April 1991 Insp Repts 50-250/91-10 & 50-251/91-10 on 910304-08 & 18-22. No Violations Noted.Major Areas Inspected:Procedures,Work Activities & Quality Records Pertaining to Erection of Structural Steel in New Diesel Generator Bldg IR 05000250/19910061991-02-25025 February 1991 Partially Withheld Insp Repts 50-250/91-06 & 50-251/91-06 on 910128-0201.No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Protected Area Physical Barriers, Status of Security Upgrade Program & Packages & Vehicles ML20059N3511990-09-21021 September 1990 Notice of Violation from Insp on 900804-31.Violation Noted: Administrative Policies Not Established to Control Changes to Master Instrument Calibr Data Sheet for Component Cooling Water Pump Automatic Start Pressure Switch PNO-II-90-039, on 900723,const Worker Fell & Was Injured & Subsequently Transported by Helicopter to Local Hosp.Extent of Injuries Unknown.Injury Occurred Outside Protected Area at New Maint Bldg Under Const1990-07-23023 July 1990 PNO-II-90-039:on 900723,const Worker Fell & Was Injured & Subsequently Transported by Helicopter to Local Hosp.Extent of Injuries Unknown.Injury Occurred Outside Protected Area at New Maint Bldg Under Const IR 05000250/19890421989-09-21021 September 1989 Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization IR 05000250/19890331989-08-0909 August 1989 Partially Withheld Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Effectiveness, Physical Barriers,Assessment Aids & Personnel Training IR 05000250/19890301989-07-27027 July 1989 Partially Withheld Insp Repts 50-250/89-30 & 50-251/89-30 on 890614-16 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Access Control of Personnel,Packages,Vehicles & Alarm Stations IR 05000250/19890211989-06-0101 June 1989 Partially Withheld Insp Repts 50-250/89-21 & 50-251/89-21 on 890424-28 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans & Protected & Vital Area Physical Barriers IR 05000250/19890031989-03-0808 March 1989 Insp Repts 50-250/89-03 & 50-251/89-03 on 890206-10. Violations Noted.Major Areas Inspected:Access Control to Protected Vital Areas,Records & Repts,Compensatory Measures & Protection of Safeguards Info ML20235U2121989-02-24024 February 1989 Notice of Violation from Insp on 890117-20.Violation Noted: Licensee Failed to Promptly Classify Event Involving Unit 3 RCS Leakage Greater than 50 Gpm & to Make Timely Notification to State of Fl & NRC IR 05000250/19880151988-11-18018 November 1988 Corrected Pages to SALP Repts 50-250/88-15 & 50-251/88-15 for June 1987 - June 1988 PNO-II-88-030A, on 880517,during Police Interview,Security Officer at Turkey Point Admitted That Story Told Last Week of Exchanging Shots W/Three Unidentified Persons During Early Morning Hours of 880506 Near Plant False1988-05-17017 May 1988 PNO-II-88-030A:on 880517,during Police Interview,Security Officer at Turkey Point Admitted That Story Told Last Week of Exchanging Shots W/Three Unidentified Persons During Early Morning Hours of 880506 Near Plant False PNO-II-88-027, on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed1988-04-19019 April 1988 PNO-II-88-027:on 880415,ENERCON Svc,Inc Completed Independent Mgt Appraisal of Plant Nuclear Operations Per NRC Order EA 87-85.Licensee Issued News W/Appraisal on 880418 & Currently Reviewing Appraisal.State of Fl Informed ML20196B8921988-02-0808 February 1988 EN-88-008:on 880211,notice of Proposed Imposition of Civil Penalty in Amount of $150,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Multiple Failures to Maintain Positive Access Control PNO-II-88-005, on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-81988-01-15015 January 1988 PNO-II-88-005:on 880113,manual Reactor Trip Initiated Per off-normal Procedure.Caused by Loss of Power to Movable Gripper Coils.Unit Will Remain Down for Approx 10 Days Due to Pinhole Leak in Canopy Seal for Rod D-8 ML20236J9531987-11-0505 November 1987 EN-87-060A:on 871105,order Imposing Civil Penalty in Amount of $75,000 Issued to Licensee Based on Two Violations Re Access Control & Search.Nrc Concluded That Violation Did Occur Following Review of Util 870826 Response PNO-II-87-075, on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing1987-10-28028 October 1987 PNO-II-87-075:on 871021 & 25,voiding Noted in Vessel Head Regions.Caused by Mispositioned Manual Valve in Nitrogen Vent Line.Investigation Continuing PNO-II-87-074, on 870929,24 H Control Room Coverage Initiated by NRC in Response to Determination That Licensee Violated 10CFR50.54 by Allowing Nonlicensed Person to Manipulate Reactor Dilution Controls1987-10-26026 October 1987 PNO-II-87-074:on 870929,24 H Control Room Coverage Initiated by NRC in Response to Determination That Licensee Violated 10CFR50.54 by Allowing Nonlicensed Person to Manipulate Reactor Dilution Controls ML20236A1511987-10-15015 October 1987 EN-87-086:on 871019,order & Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $225,000 Will Be Issued Based on Loss of Emergency Boration Flow Paths & Failure of Personnel to Follow Procedures PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations1987-10-13013 October 1987 PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations PNO-II-87-062, on 870926,nonlicensed Person Not in Training Status Allowed to Manipulate Reactor Dilution Controls in Control Room.Cause Not Stated.Licensed Personnel Had Prepared Sys Properly for Manipulation of Controls1987-09-29029 September 1987 PNO-II-87-062:on 870926,nonlicensed Person Not in Training Status Allowed to Manipulate Reactor Dilution Controls in Control Room.Cause Not Stated.Licensed Personnel Had Prepared Sys Properly for Manipulation of Controls ML20236D7571987-07-23023 July 1987 EN-87-060:on 870728,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Will Be Issued.Action Based on Violations Re Failure to Maintain Positive Access Control Over Personnel & Equipment ML20236D4291987-07-16016 July 1987 EN-87-057:on 870721,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000 Will Be Issued Based on Licensee Failure to Take Prompt Corrective Action for Reactor Coolant Leak IR 05000250/19870161987-05-19019 May 1987 PNO-II-87-030:updating PNO-II-87-019 & PNO-II-87-019A. Augmented Insp Team Repts 50-250/87-16 & 50-251/87-16 on Boric Acid Leakage & Buildup Problem Issued on 870515.Loss of Offsite Power Test Scheduled for 870520 ML20213A7261987-04-16016 April 1987 EN-87-032:on or About 870421,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Will Be Issued for Licenses.Action Based on Violations of Physical Security Plan Involving Sleeping Guard & Unescorted Visitor PNO-II-87-024, on 870407,Region II Ofc Received Anonymous Telcon Alleging That 14 Members of Bechtel Corp Work Crew Involved in Onsite Drug Use.On 870408,region Received Addl Telcon Alleging Drug Use by 5 Other Bechtel Employees1987-04-0909 April 1987 PNO-II-87-024:on 870407,Region II Ofc Received Anonymous Telcon Alleging That 14 Members of Bechtel Corp Work Crew Involved in Onsite Drug Use.On 870408,region Received Addl Telcon Alleging Drug Use by 5 Other Bechtel Employees PNO-II-87-017, media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc1987-03-24024 March 1987 PNO-II-87-017:media Interest Developed Re Air Lock Problem Identified When Routine Surveillance Test Indicated Minor Pressure Leakage on Inside Door of Personnel Lock.Unit to Be Retested & Returned to Svc PNO-II-87-019A, on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for Insp1987-03-23023 March 1987 PNO-II-87-019A:on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for Insp PNO-II-87-020, on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted1987-03-20020 March 1987 PNO-II-87-020:on 870319,facility Made Critical,For First Time Since 861209,feed Sys Pipe Rupture.Extensive Replacement of Feedwater Piping in Both Units Completed & Program for Periodic Insp of Sys Instituted IR 05000250/19870111987-03-20020 March 1987 Partially Withheld Enforcement Conference Repts 50-250/87-11 & 50-251/87-11 on 870223 (Ref 10CFR2.790 & 73.21).Repts Address Followup Insp on 870303-04.Violations Noted:Failure to Provide Positive Control of Visitors ML20207T7141987-03-11011 March 1987 Notice of Violation from Insp on 870112-0209 IR 05000250/19870061987-03-0505 March 1987 Insp Repts 50-250/87-06 & 50-251/87-06 on 870112-0209. Violations Noted:Failure to Correct Conditions Adverse to Quality & Failure to Establish & Implement Adequate Procedures ML20207T4441987-02-20020 February 1987 Accelerated Requalification Exam Rept 50-250/OL-86-05 on 861215-17.Exam Results:Three of Eight Senior Reactor Operators Passed.Exam Questions & Answer Key & Util Comments Encl 1997-09-26 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20058C680&oldid=3626757"