ML20058C622

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-346/90-19 on 900924-28.No Violations Noted.Record Copy
ML20058C622
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/18/1990
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
References
NUDOCS 9011020058
Download: ML20058C622 (2)


See also: IR 05000346/1990019

Text

mf;

lh

$lk

0 e.10

y,,

', lL $

,;

E

h

00T 181990

E pl

+

,.

J

g

Docket No. 50-346-

Toledo Edison Company

'

ATTN: Mr. Donald Shelton

E-

Vice President-

,

_

Nuclear

m

. Edison Plaza

g-

l ' j'

300 Madison Avenue

i

' Toledo, OH 43652

'

hiI

Gentlemen:

'

This refers to the. routine safeguards inspection conducted by

'

o

'

5

Ms. G.-M. Christoffer of this office on September 24-28, 1990, of activities

at Davis-Besse Nuclear Power Station authorized by NRC Operating License

o

y

-No. NPF-3 and to the discussion of our finde.gs with Mr. John Heffley at the

conclusion of the inspection.-

,

T

The enclosed copy of our inspectic.i report identifies. areas examined during

@

the inspection. Within'these a eas, the inspection consisted of a selective

4

examination of' procedures and representative records, observations, and

,

interviews with personnel.

,

s

,

y

No violations of NRC requirements were identified during the course-of this -

. inspection,

'c -

Areas examined during this inspection concern a subject matter which is -exempt

from disclosure 'according to_ Part 73, Title 10, Code of Federal- Regulations,

6- - .

-Section 73.21(c)(2). This information must be handled and protected in

p,

accordance with the provisions of-~10 CFR 73.21.

Consequently, our report

g

b

'of this inspection will not be placed in the NRC' Public Document Room.

I

'

~We will gladly discuss any questions you have concerning this inspection .

Sincerely,

" Original signed by W. Snell"

,

,

L. Robert Greger, Chief

. J b:_

Reactor Programs Branch -

Enclosure:

Inspection Report-

'

No'.50-346/90019(DRSS))

') 2 e

SAFEGUARDS,INFORMATION

Enelsen*e Containa

'(SAGEGUARDSINFORMATION

.

Upon Separation This

See Attached Distribution

Pago Io Decontrolled

, hM

6' hD

RIII

R I

RITI.

RIII

ar

a

Chr toffer/gd

ed

Jackiw

Greger

'\\

'

10/ /90

10-/# p

Gois elto ,'

'

__ _ _ _ _ _

...--...o

. . . , ..

.

J./

18

0

Toledo Edison Company

2

,

!

Distribution

ccLw/ enclosure:

L. Storz, Plant Manager

NRR/DRIS/SGB

NRR/DRIS/ SIB-

NRR/DLPQ/PEB

cc w/ enclosure w/o

SAFEGUARDS INFORMATION:

DCD/DCB (RIDS)

OC/LFDCB

. Resident Inspector, RIII

James W. Harris, State of Ohio

Robert'E.=Owen Ohio.

DepartmentofHealth

-

>L

A. Grandjean, State of Ohio,_

Public Utilities Connission

Enclosuro Containo-

SAFEGUARDS INFORMATION

Upon Separation This

sage Is Decontrolled

l

. . . . - . - -

-

,

o ..:

7-

S/tFEGUAiDS INF00ATl0N

'

V. S . NUCLEAR REGULATORY COMMISSION

REGION 111

Report No. 50-346/90019

'

License No. NPF-3

'

Licensee: Toledo Edison Company

Edison Plaza

300 Madison Avenue

Toledo, OH 42652

-Facility Name:

Davis-Besse Nuclear Power Station

-Inspection At;

Davis-Besse Station

' Inspection Da 1: September 24-28, 1990

. Inspector:-(.

.'Chr s

/'

/0 /

d

Physical Security Tnspector

Date Signed

~ / 'b0

Approved By:

2Ns

. Cre

, Chief

f Aafeguards Section

Date Signed

L/

Inspection Summary

' Inspection on September 24-28, 1990 (Re) ort No. 50-346/90019(DRSS)

>

' Areas-Inspected:

Routine unannounced p1ysicai security inspection 1nvolving:

management support; security program plans; audits;? alarm stations;

communications; power supply; testing, maintenance and compensatory measures

land licensee' actions on previous inspection findings.

p

,

'Results:- The licensee was found to be in compliance with the NRC requirements

Ethe areas examined. The resources devoted to support the security program

are excellent. . Management's involvement in assuring quality was demonstrated

through the positive actions taken to address identified weaknesses.

,

s

-

fg

'yy

$

$^

"

h

J0:

i

s:J r ;" .

w;r, in-

ILit

m

,

[ q j-

.. ,. M O k N

o

.i

[ #on 0%006

i

_ -._ _ _ _--

-