Text
.
sd r
consumers power James W Cook Company v.a n,u. - ~iusa.s. a.,
l and Cons,ruction General Offices: 1945 West Parnell Road, Jackson, MI 49201 e (517) 78&O453 79-03 #7 July 9, 1982 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT -
DOCKET HOS 50-329 AND 50-330 SMALL BREAK / REACTOR C00LAUT FUI/P OPERATION INTERACTION FILE:
0.L.9.c6 3ERIAL:
175LO
References:
CPCo letters to J G Keppler; Same
Subject:
- 1) Serial Hove-221-79; dated August 15, 1979
- 2) Serial Hove-271-79; dated October 19, 1979
- 3) Serial Howc-25-80; dated February 6, 1960 h) Serial 9770; dated October 10, 1980
- 5) Serial 12010; dated May 29, 1981
- 6) Serial lL268; dated December h, 1981 This letter, as were the referenced letters, is an interim 50 55(e) report concerning a potentially unsafe situation with respect to the tripping of reactor coolant pumps during certain primary system high void fraction conditions.
Bechtel engineering work for the hardware design is complete.
B&W's FCA for modification of the ECCAS panels was completed in April 1982.
Hardware delivery is expected to be completed in July 1982.
Implementation of the modification is still scheduled for September 1982.
Since December 1981, there has been considerable interaction between the URC staff and the B&W owner's group (including CPCo participation) regarding the advisability of automatic tripping of the reactor coolant pumps.
Conclusions concerning the RC pump operation during a small break LOCA have proven difficult to reach. The B&W owner's group has requested B&W to finali e their recommendation for the reactor coolant pump trip set points At this time, no dates have been projected for establishing a final recommendation.
8207260381 820709
^"
O d PDR ADOCK 05000329 S
_ma 7
2 Serial 175h0 79-03 #7 Another report, either interim or final, will be submitted on or before July ll, 1983
~
JLW/lr CC: Document Control Desk, NRC Washington, DC RJCook, NRC Resident Inspector Midland Nuclear Plant CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB Panel JHarbour, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CEStephens, USNRC WDPaton, Esq, USNRC FJKelley, Attorney General SHFreeman, Esq, Asst Att Gen WHMarshall GJMerritt, THK&J