Text
,.g %
UNIT E D S7 AT ES
. ; '[ ,
NUCLEAR REGULATORY COMMISSION
.j
I
REGION 4V
,
h
[
611 RY AN PLAZA DRIVE, SusTE 400
-
J
3y
c
ARLINGTON 1EXAS 76011-8064
!
""*
NOV 2 31993
Docket:
50-298
License: DPR-46
Nebraska Public Power District
!
ATTN: Guy R. Horn, Vice President-Nuclear
i
P.O. Box 98
l
Brownville, Nebraska 68321
l
SUBJECT: NRC INSPECTION REPORT 50-298/93-25 (NOTICE OF VIOLATION)
!
This refers to the inspection conducted by Mr. R. A. Kopriva and the inspectors
identified in the enclosed report, of this office, on August 29 through
October 9, 1993. The inspection included a review of activities authorized for
your Cooper Nuclear Station facility. At the conclusion of the inspection, the
findings were discussed with you and those members of your staff identified in
the enclosed report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress. The purpose of the inspection was to determine whether activities
authorized by the license were conducted safely and in accordance with NRC
requirements.
!
Based on the results of this inspection, certain licensed activities appeared to
be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The first violation is of concern because an alarm response
procedure specified that the high pressure coolant injection system be secured
for an alarm condition which could be encountered during a safety injection
,
actuation but would not jeopardize the systems' integrity or effect its
performance.
The second violation is of particular concern because the
l
procedural deficiency, which the NRC staff had promptly reviewed with management,
l
was not promptly corrected and subsequently contributed to another event where
'
the high pressure coolant injection system was secured when the alarm annunciated
l
during a surveillance test.
l
In addition the staff is very concerned with the as-found conditions inside the
i
safety-related starter racks and motor control centers.
The conditions found
l
indicate that plant personnel accepted substandard work practices during the
l
outage and that management oversight and supervisory involvement was not
l
adequate.
,
l
A management meeting, open to the public, has been scheduled for November 23,
'
1993, at the NRC Region IV office to discuss your ongoing industry information
i
program implementation improvements.
l
i
9312O20479 931123
-
ADOCK 05000298
I
,
G
1
-
.1
__
'
.
.
.
.
f
Nebraska Public Power District
-2-
!
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your respcnse. In your response,
you should document the specific actions taken and any additional actions you
plan to prevent recurrence.
After reviewing your response to this Notice,
,
including your proposed corrective actions and the results of future inspections,
l
the NRC will determine whether further NRC enforcement action is necessary to
r
ensure compliance with NRC regulatory requirements.
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this
letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject to
l
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Should you have any questions concerning this inspection, we will be pleased to
,
discuss them with you.
Sincerely,
j
O
-
. Bill Beach, Direct
"
l
Division of Reactor P oje is
j
Enclosures:
-
1.
Appendix A - Notice of Violation
,
2.
Appendix B - NRC Inspection Report
50-298/93-25
!
t
i
!
cc w/ enclosures:
l
Nebraska Public Power District
'
ATTN:
G. D. Watson, General Counsel
'
P.O. Box 499
Columbus, Nebraska 68602-0499
Nebraska Public Power District
ATTN: David A. Whitman
P.O. Box 499
Columbus, Nebraska 68602-0499
Nebraska Department of Environmental
i
Control
i
ATTN: Randolph Wood, Director
P.0. Box 98922
!
Lincoln, Nebraska 68509-8922
l
.
_-
.
._
-
.,
._
_ . .
-
_ _.
.
.
,
.
.
Nebraska Public Power District
-3-
l
!
Nemaha County Board of Commissioners
ATTN: Larry Bohlken, Chairman
Nemaha County Courthouse
1824 N Street
Auburn, Nebraska 68305
Nebraska Department of Health
ATTN: Harold Borchert, Director
Division of Radiological Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
Department of Natrual Resources
ATTN: Ronald A. Kucera, Department Director
,
!
of Intergovernmental Cooperation
P.O. Box 176
Jefferson City, Missouri 65102
,
l
Kansas Radiation Control Program Director
I
i
i
i
,
1
,
.
.
-
tel 2 31993
Nebraska Public Power District
-4-
bec to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
'
,
Section Chief (DRP/TSS)
Project Engineer (DRP/C)
RIV File
Senior Resident Inspector - River Bend
,
f
Senior Resident Inspector - Fort Calhoun
A. B. Beach, DRP
,
!
V/
RIVIk'b-
DRPf[/r
DRP/ k
DRh
C:DR[/ h
D:DRP
t
'
RAKoprua
WBJon'et
RMullikin
GEWerner
JEGagli3rdo
ABBeach
<
it/0/93
a /g/93
t\\/h/93
o / \\ V93
ti/n/93
$/b5/93
i
l
-
-
-
_ . - .
. - - - .
-
-
_
. - . _ -
-
.
- -
_ . - .
-
.
0
-
'
, . j '
.
~
l
.
s
.
10/23 M
Nebraska Public Power District
-4-
J
bcctoDMBllE0fjT"O
bec distrib. by RIV:
.
'
J. L. Milhoan
Resident Inspector
l
Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNEB 4503
i
'
!
MIS System
DRSS-FIPS
Section Chief (DRP/TSS)
Project Engineer (DRP/C)
RIV File
Senior Resident _ Inspector - River Bend
i
Senior Resident Inspector.- Fort Calhoun
i
A. B. Beach, DRP
,
,
1
.
1
i
i
!
!
l
i
.
1
l
RI kb-
DRP! h
DRPH %>,
C:Dh/
'
'
D:DRP
L
I
D
RAKoprha
WBJoner
RMullik n
GEWern r - JEG gli do
ABBeach I
i / 0/93
a /cs/93
0/n/93
o / t V93
6 / 6/93
8/]h/93
i
.
l
29 1 E'T
L
-
.
.
._
.
.
.
.
.
.
. .
..