Interim Deficiency Rept Re Defective Spot Welds & Power Strut Support Matl.Initially Reported on 820211.Repair on Hold Until Satisfactory Solution Can Be Determined.Next Rept Expected by 821105
ML20058C147
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/09/1982
From: Wells D, Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-58749, NUDOCS 8207260274
Download: ML20058C147 (3)


Text

--

Sw w/

Donald A. Wells m it mme^-

Edison E"i#fi!==

July 9, 1982 EP2-58749 Mr. Janes G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Cmmission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e) Item on Defective Spot Welds and Power Strut Support Material (#55)

Dear Mr. Keppler:

This additional interim report on the defect'ive spot welds and Power Strut support material problem has been prepared to provide you with the current status of this problem.

The problem was originally reported to Mr. J.E. Konklin of NRC Region III by Detroit Edison's Mr. H.A. Walker, Supervisor-Construction Quality Assur-ance, on February 11, 1982.

L.K. Cmstock (a Detroit Edison Contractor) had noted a number of problems with spot welds on " Power Strut" type PS202 support material. This material was ordered by the site electrical contractor, L.K. Cmstock, frm the Van Huffel Tube Corporation. The problem was first noted in the field when the material separated at several of the manufacturer's spot welds. As a result of this, twelve samples of the " Power Strut" formed netal channels were sent to Detroit Testing Iaboratory. All twelve of the pieces tested exhibited spot weld failures.

The repair of these welds are on hold until Detroit Edison Engineering and Power Strut can calplete their review of the situation and determine a satis-factory solution.

Another report on this item, either interim or final, is scheduled to be sent to you on or before November 5,1982. If you have questions.concerning this matter, please contact Mr. H.A. Walker, Supervisor-Construction Quality Assur-anCo.

Very truly yours, h j}Y g/ /s O

s DAW / HAW /cp hti 91932 1

e20726o274 s2o7o9 PDR ADOCK 05000341 S

PDR 48k?

f Mr. James G. Keppler, Regional Administrator July 9, 1982 Page Two EF2-58749 cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcerent Division of Reactor Inspection Programs U.S. Nuclear Regulatory Cmmission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Cm mission 6450 North Dixie Ifighway Newport, Michigan 48166

Mr. James G. Keppler, Regional Administrator July 9, 1982 Page Three EF2-58749 bec:

T.A. Alessi J.C. Ard, Jr.

C.R. Bacon W.F. Colbert W.M. Everett W.J. Fahrner E.P. Griffing C.M. Heidel W.H. Jens E. Lusis P.A. Marquardt/ Docket File (2)

E.H. Newton S.H. Noctzel J.W. Nunley J.D. Ryan L.E. Schuerman H. Tauber R.A. Vance/L.E. Eix H.A. Walker A.E. Wegele Site Document Control NRC Follow-Up Book /NRC File Chron File