Interim Deficiency Rept Re Possible Excess Movement of Pipe Support Snubbers.Initially Reported on 820527.Evaluation of All Snubber Designs in Progress.Next Rept Will Be Provided by 821022
ML20058C095
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/25/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-58748, NUDOCS 8207260256
Download: ML20058C095 (2)


Text

_.

._.._ _ ~

~. - -., _..

Donald A. Wells Q

J DehoR E"M@^~"

<y f

2000 Second A Edison mm.enue 4

June 25, 1982 EF2-58748 i

Mr. Janes G. Keppler, Regional Administrator Region III l

U.S. Nuclear Regulatory Cmmission 799 Roosevelt Road Glen Ellyn, Illinois 60137 i

Subject:

Interim Report of 10CFR50.55(e) Item on Pipe Support Snubber Design Deficiency (#69)

Dear Mr. Keppler:

i On May 27, 1982, Detroit Edison's Mr. H.A. Waler, Supervisor-Construction Ouality Assurance, telephoned Mr. H. Wesco'.c of NRC Region III to report on a pipe support snubber design deficiency at the Fermi 2 site.

During an NRC inspection, Mr. I.T. Yin of the NRC, had noted a number of locations that snubbers were to be installed where they could not function properly. In sme instances, the movem2nt was not great enough for the snubber to lock-up, therefore, the snubber load would be transferred to j

the adjacent rigid supports causing possible over-stress. This would be j

a potential safety problem.

4 Engineering has developed a plan for evaluation of all snubber designs to l

ensure that the snubbers will adequately perform their intended purpose and i

are only utilized where needed. This plan has been. reviewed by the NRC and l

1s considered acceptable. The required evaluation is now being performed.

l l

Another report on this item, either interim or final, is scheduled to be sent to you on or before October 22, 1982. If you have questions concerning this j

matter, please contact Mr. H.A. Walker, Supervisor-Construction Quality Assurance.

Very truly yours,

  • f 1

lg w

DAW / HAW /cp H/- )

jj cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Camission Washington, D.C. 20555 i

Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Camission 6450 North Dixie Highway

}

Newport, Michigan 48166 I

8207260256 820625 Jul.19 M PDR ADOCK 05000341

_ _f g_..

J S

PDR

l 1

Mr. James G. Keppler, Regional Idninistrator June 25, 1982 Page 'Iko EF2-58748 bec:

T.A. Alessi J.C. Ard, Jr.

C.R. Bacon W.F. Colbert W.M. Everutt W.J. Fahrner E.P. Griffing C.M. IIeidel W.II. Jens E. Lusis P.A. Marquardt/ Docket File (2)

E.H. Newton S.II. Noetzel J.W. Nunley J.D. Ryan L.E. Schuernan

11. Tauber G.M. Trahey R.A. Vance/L.E. Eix II.A. Walker A.E. Wegele Site Document Control NRC Follcu-Up Book /NRC File Chron File