i NUREG-0030 i
Vol. 6, No.1 i
i i
NUCLEAR POWER PLANTS J
CONSTRUCTION STATUS REPORT
,l i
i DATA AS OF 03/31/82 I
4 i
[
UNITED STATES NUCLEAR REGULATORY COMMISSION 1
pt ** *'%,,
7 7 820630 l
0030 R PDR
Available from NRC/GPO Sales Program Superintendent of Documents Government Printing Office Washington, D.C. 20402 A year's subscription consists of 4 issues for this publication, e
Single copies of this publication are available from National Technical Information Service, Springfield, VA 22161 Microfiche of single copies are available from NRC/GPO Sales Program Washington, D.C. 20555
' ~ ~ ~, -
NUREG-0030 Vol. 6, No.1 d
NUCLEAR POWER PLANTS CONSTRUCTION STATUS REPORT DATA AS OF 03/31/82 4
1 Manuscript Completed: June 1982 1
Date Published: June 1982 1
0FFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULMO.'tY COMMISSION WASHINGTON, D.C. 20555 x..,.. =
i l
AUTHORIZATION AND CLEARANCE l
l l
ON JULY 8, 1981, THE U.
S.
HUCLEAR REGULATORY COMMISSION REQUESTED APPROVAL FOR COLLECTION OF DATA AND PUBLICATION OF THE CONSTRUCTION STATUS REPORT (HUREG-0030)
FR0ft THE OFFICE OF f1ANAGEMENT AND BUDGET.
BY ACTION DATED AUGUST 3, 1981 THE OFFICE OF MANAGEMENT AND BUDGET GRANTED APPROVAL OF THE REQUEST.
THE FOLLOWING INFOR:1ATION IS TO APPEAR ON THE FIRST PAGE OF THE REPORT:
APPROVED BY CMB OMB NO. 3150-0030 EXPIRES 12-31-82
FOREWORD l
This report is compiled by the Nuclear Regulatory Commi ssion's Of fice of Resource Management to provide information necessary for monitoring progress of all nucicar power plants which have Construction Permits. The report includos data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement.
This data is used to synchroniec the licensing process with pre-dicted fuel load dates for this central Federal Government presentation of commercial reactor construction.
UPDATES FOR THIS EDITION WERE NOT RECEIVED FROM THE FOLLOWING PLANTS:
COMANCHE PEAK 1 MILLSTONE 3 COMANCHE PEAK 2 PERRY 1 DIABLO CANYON 1 PERPY 2 DIABLO CANYON 2 LAN ONOFRE 3 FER!1I 2 WOLF CREEK 1
TABLE OF CONTENTS SECTION 1
SUMMARY
OF FUEL LOADING CHANGES 1-001 FACILITY STATUS
SUMMARY
1-002 THRU 1-004 PLANTS AND STAGES OF CONSTRUCTION BY REGION 1-005 i
AVERAGE CONSTRUCTION DURATIONS 1-006 THRU 1-013 l
l SECTION 2 PLANT DATA / CONSTRUCTION STATUS 2-002 THRU 2-145 SFCTION 3 SCHEDULE FOR UPDATES - CALENDAR YEAR 1982 3-001 BLANK CONSTRUCTION STATUS REPORT FORMS 3-002 THRU 3-003 I
i
l Z
O C)
LaJ C/3
C0N5TRUCT ION 5TATUS REPQR T PAGE NO:
1-881 NUCL EA R POWER PLA NTS
SUMMARY
0F FUEL L 0A DING CHANGES DURING THE PERIOD FROM 01-01-82 TO 03-31-82. THE FOLLOWING LICENSING ACTIONS WERE AUTHCRIZED:
SAN ONOFRE 2 WAS ISSUED A LOW PCWER LICENSE 02-16-82.
T!iE FOLLOWING PLANTS REPORTED CHANGES IN THEIR ESTIMATED FUEL LOADING DATES DURING THE ABOVE REPORTING PERIOD:
FLD LAST FLD THIS SLIPPAGE /
PLANT NAME PERIOD PERIOD (IMPROVEMENT)
CATAWBA 1 w
08-00-83 11-00-84 15.00 MONTHS CATAWBA 2 02-00-85 03-00-87 25.00 MONTHS CLINTCH 1 01-03-83 01-03-84 12.00 MONTHS DIABLO CANYOH 1 03-00-82 UNKNCWN 0.00 MONTHS GRAND GULF 1 u
04-23-82 05-14-82 0.70 MONTHS LASALLE 1 03-15-82 04-15-82 1.00 MONTHS LASALLE 2 12-00-82 04-30-83 5.00 t10NTHS SUMMER 1 02-00-82 05-00-82 3.00 MONTHS WASHINGTON NUCLEAR 2 C3-00-83 09-00-83 6.00 MONTHS UATERFCRD 3 m
10-00-82 01-00-83 3.00 MONTHS 1
WATTS BAR 1 w
08-00-82 08-00-83 12.00 MONTHS WATTS BAR 2 06-01-83 08-00-84 13.97 MONTHS ZIMMER 1 m
07-00-82 12-00-82 5.00 MONTHS I,
w FIRST CF A MULTI-UNIT OR A SINGLE UNIT APPLICATION.
FAC IL I TY S T A TUS SUMMA RY PAGE NO:
1-002 NUCL EAR POWER PLA N TS DATE APPLICANT'S APPLICANT'S PERCENT DOCKET REACTOR DESIGN IE CONSTRUCTION FLD AT CP CURRENT CONSTRUCTION PLANT NAME NUMBER TYPE FWE PEGION STARTED ISSUANCE FLD COMPLETE 1.
BEAVER VALLEY 2 05000412 PWR 852 1
05-04-74 02-00-79 12-31-85 51%
l 2.
BELLEFONTE 1 05000438 PWR 1235 2
09-00-74 06-00-79 09-00-83 80%
l 3.
BELLEFONTE 2 05000439 PWR 1235 2
09-00-74 03-00-80 09-00-84 67%
4.
BRAIDWOOD 1 05000456 PWR 1120
}
08-00-75 05-00-81 04-00-85 62%
5.
BRAIDWOOD 2 05000457 PWR 1120 3
08-00-75 05-00-82 04-00-86 49%
6.
BYRON 1 05000454 PWR 1120 3
04-00-75 05-00-80 04-00-83 82%
7.
BYRON 2 050C0455 PWR 1120 3
04-00-75 05-00-81 04-00-84 66%
8.
CALLAWAY 1 05000483 PWR 1188 3
09-03-75 06-01-81 06-01-83 81%
l 9.
CATAWBA 1 05000413 PWR 1145 2
05-16-74 12-00-78 11-00-84 89%
l 10.
CATAWBA 2 05000414 PWR 1145 2
05-16-74 12-00-79 03-00-87 42%
11.
CHEROKEE 1 05000491 PWR 1280 2
07-09-76 05-00-83 UNKNOWN 18%
12.
CHEROKEE 2 05000492 PWR 1280 2
07-09-76 05-00-85 UNKNOWN 00%
l 13.
CHEROKEE 3 05000493 PWR 1280 2
07-09-76 05-00-82 UNKNOWN 00%
14.
CLINTON 1 05000461 BWR 950 3
10-06-75 10-00-80 01-03-84 83%
15.
CLINTON 2 05000462 BWR 950 3
10-06-75 10-00-83 UNKNOWN 01%
16.
COMANCHE PEAK 1 05000445 PWR 1150 4
10-00-74 06-00-79 06-00-83 89%
17.
COMANCHE PEAK 2 05000446 PWR 1150 4
10-17-74 06-00-81 UNKNOWN 57%
18.
DIABLO CANYON 1 05000275 PWR 1084 5
06-14-68 04-00-72 UNKNOWN 99%
19.
DIABLO CANYON 2 05000323 PWR 1106 5
06-14-68 11-00-74 07-00-82 98%
20.
ENRICO FERMI 2 05000341 BWR 1093 3
05-00-69 08-00-73 11-30-82 88%
21 GRAND GULF 1 05000416 BWR 1250 2
05-03-74 03-00-79 05-14-82 97%
22.
GRAND CULF 2 05000417 BWR 1250 2
05-03-74 03-00-81 UNKNOWN 22%
23.
HARRIS 1 05000400 PWR 915 2
01-14-74 09-00-80 12-00-84 60%
24.
HARRIS 2 05000401 PWR 915 2
01-14-74 06-01-85 06-01-88 04%
25.
HARTSVILLE A-1 05000518 BWR 1205 2
04-22-76 06-00-81 01-01-90 44%
FACIL IVY STA TUS SUMMA 3Y PAGE NO:
1-003 NUCL EA R POWER PLAN TS I
DATE APPLICANT'S APPLICANT'S PERCENT l
DOCKET REACTOR DESIGN IE CONSTRUCTION FLD AT CP CURRENT CONSTRUCTION f.LA_NT N AME Hl/M$ t @
TYPE MWE REGION STARTED ISSUANCE' FLD C 0r*PL E T E 26.
HARTSVILLE A-2 05000519 BWR 1205 2
04-22-76 06-00-82 01-01-91 34%
27.
HARTSVILLE B-1 05000520 BWR 1205 2
04-22-76 12-00-81 UNKNCWN 17%
28.
HAR!SVILLE B-2 05000521 BWR 1205 2
04-22-76 12-00-82 UNKNOWN 07%
29.
HOPE CREEK 1 05000354 BWR 1067 1
03-00-76 06-00-81 06-00-86 46%
30.
LASALLE 1 05000373 BWR 1078 3
10-00-73 03-01-75 04-15-82 99%
31 LASALLE 2 05000374 BWR 1078 3
10-00-73 08-01-75 04-30-83 85%
32.
LIMERICK 1 05000352 BWR 1065 1
05-00-70 04-00-79 10-00-84 72%
33.
LIMERICK 2 05000353 BWR 1065 1
05-00-70 09-00-80 04-00-87 30%
34.
MARBLE HILL 1 05000546 PWR 1130 3
08-00-77 04-00-82 06-00-86 35%
35.
MARBLE HILL 2 05000547 PWR 1130 3
12-00-77 07-00-83 06-00-87 17%
I 36.
MCGUIRE 2 05000370 PWR 1180 2
04-01-71 10-01-76 04-01-83 98%
37.
MIDLAND 1 05000329 PWR 492 3
03-00-73 11-00-79 12-00-83 77%
l l
38.
MIDLAND 2 05000330 PWR 818 3
03-00-73 11-00-78 07-00-83 77%
39.
MILLSTONE 3 05000423 PWR 1159 1
05-00-74 12-01-78 12-01-85 43%
40.
NINE MILE POINT 2 05000410 BWR 1080 1
08-25-75 05-01-78 03-00-86 44%
41.
NORTH ANNA 3 05000404 PWR 907 2
07-00-72 07-00-78 04-00-89 08%
42.
PALO VERDE 1 05000528 PWR 1304 5
05-00-76 11-00-81 11-01-82 97%
43.
PALD VERDE 2 05000529 PWR 1304 5
06-00-76 11-00-83 11-00-83 85%
44.
PALO VERDE 3 05000530 PWR 1304 5
06-00-76 11-00-85 11-00-85 39%
45.
PERRY 1 05000440 BWR 1205 3
10-00-74 05-30-81 11-00-83 81%
i 46.
PERRY 2 05000441 BWR 1205 3
10-00-74 12-30-82 05-00-87 41%
47.
PHIPPS BEND 1 05000553 BWR 1220 2
10-19-77 01-00-83 01-00-93 29%
48.
PHIPPS BEND 2 05000554 BWR 1220 2
UNKNOWN 01-00-83 UNKNOWN 05%
49.
RIVER BEND 1 05000458 BWR 934 4
04-08-79 10-00-81 04-00-85 46%
50.
RIVER BEND 2 05000459 BWR 934 4
UNKNOWN UNKNOWN UNKNOWN 01%
I FACI L ITY
$~A TUS SUMMA RY PAGE NO:
1-004 NUCLEA R POWER PL A N TS I
DATE APPLICANT'S APPLICANT'S PERCENT DOCKET REACTOR DESIGN IE CONSTRUCTION FLD AT CP CURRENT CCNSTRUCTION PLANT NAME NyM)[R TYPE MWE REGION STARTED ISSUANCE FLD CO*TLETE 1
1 51.
SAN ONOFRE 3 05000362 PWR 1100 5
02-07-74 05-00-80 11-01-82 8 7..
I 52.
SEABROOK 1 05000443 PWR 1198 1
07-00-76 08-01-81 11-30-83 63%
l l
l 53.
SEABROOK 2 05000444 PWR 1198 1
07-00-76 10-01-83 02-28-86 1,
54.
SHOREHAM 05000322 BWR 849 1
11-00-72 03-00-77 09-2C-82 88%
55.
SOUTH TEXAS 1 05000498 PWR 1250 4
09-00-75 05-01-80 UNKNOWN 45%
56.
SOUTH TEXAS 2 05000499 PWR 1250 4
09-00-75 10-01-81 UNKNOWN 18%
57.
05-02-77 05-13-83 10-23-82 84%
58.
SUMMER 1 05000395 PWR 900 2
04-00-73 10-01-77 05-00-82 9 9 *.
1 I
59.
SUSQUEHANNA 1 05000387 BWR 1052 1
11-00-73 05-01-79 07-01-82 93%
60.
SUSQUEHANNA 2 05000388 BWR 1052 1
11-00-7; 11-01-80 01-00-84 65%
1 1
61.
V0GTLE 1 05000424 PWR 1100 2
08-01-76 10-01-79 09-01-86 29%
l 62.
V0GTLE 2 05000425 PWR 1100 2
08-01-76 10-01-80 03-01-88 10%
63.
WASHINGTON NUCLEAR 1 05000460 PWR 1267 5
08-01-75 03-00-80 12-00-85 61%
64.
WASHINGTON NUCLEAR 2 05000397 BWR 1103 5
08-00-72 04-00-77 09-00-83 89%
i 65.
WASHINGTON NUCLEAR 3 05000508 PWR 1242 5
04-00-77 07-00-83 08-00-85 50%
66.
WATERFORD 3 05000382 PWR 1151 4
11-14-74 06-00-78 01-00-83 9 ', *.
67.
WATTS BAR 1 05000390 PWR 1165 2
12-26-72 11-00-76 08-00-83 814 68.
WATTS BAR 2 05000391 PWR 1165 2
12-26-72 05-00-77 08-00-84 5 8 *.
69.
WOLF CREEK 1 05010482 PWR 1150 4
01-24-77 10-01-82 12-16-83 20%
70.
YELLOW CREEK 1 05000566 PWR 1285 2
02-09-78 02-01-84 07-01-89 35%
71.
YELLOW CREEK 2 05000567 PWR 1285 2
UNKNOWN UNKNOWN UNKNOWN 03%
72.
ZIMMER 1 05000358 BWR 810 3
03-00-71 01-00-77 12-00-82 98t i
i
C0NSTRUCV ION 5TA TUS REPORT PAGE NO: 1-005 NUCLEAR POWER PLANTS I
PLANTS BY IE REGION TOTAL -
72 IE REGION 1 (11)
IE REGION 2 (27)
IE REGION 3 (17)
IE REGION 4
( 8)
IE REGION 5
( 9)
.EAVER VALLEY 2 BELLEFONTE 1 BRAICWOOD 1 COMANCHE PEAK 1 DIABLO CANYON 1 HOPE CREEK 1 BELLEFONTE 2 BRAIDWOOD 2 CDMANCHE PEAK 2 DIABLO CANYON 2 LIMERICK 1 CATAWBA 1 BYRON 1 RIVER BEND 1 PALO VERDE 1 LIMERICK 2 CATAWBA 2 BYRON 2 RIVER BEND 2 PALO VERCE 2 MILLSTONE 3 CHEROKEE 1 CALLAWAY 1 SOUTH TEXAS 1 PALO VERDE 3 NINE MILE POINT 2 CHEROKEE 2 CLINTON 1 SOUTH TEXAS 2 SAN ONOFRE 3 SEABROOK 1 CHEROKEE 3 CLINTON 2 WATERFORD 3 WASHINGTON NUCLEAR 1 SEABROOK 2 GRAND GULF 1 ENRICO FERMI 2 WOLF CREEK 1 WASHINGTCH NUCLEAR 2 SHOREHAM GRAND GULF 2 LASALLE 1 WASHINGTON NUCLEAR 3
?
SUSQUEHANNA 1 HARRIS 1 LASALLE 2 SUSQUEHANNA 2 HARRIS 2 MARBLE HILL 1 HARTSVILLE A-1 MARBLE HILL 2 HARTSVILLE A-2 MIDLAND 1 l
HARTSVILLE B-1 MIDLAND 2 i
HARTSVILLE B-2 PERRY 1 MCGUIRE 2 PERRY 2 l'
NORTH ANNA 3 ZIMMER 1 PHIPPS BEND 1 PHIPPS BEND 2 ST LUCIE 2 SUMMER 1 V0GTLE 1 V0GTLE 2 WATTS BAR 1 WATTS BAR 2 YELLOW CREEK 1 YELLOW CREEK 2 I
STAGES 0F PLAN T C0NSTRUCTION BY IE REGION REGION 0% TO 24%
2S% TO 49Y S0% TO 74%
75% TO 99%
TOTAL 1
1 4
4 2
11 2
11 6
3 7
27 3
2 3
2 to 17 4
2 2
1 3
8 5
0 t
1 j
j TOTAL 16 16 12 28 72
AVERAGE C0NSTRUCT ION DURA T ION 5 PAGE NO:
1-006 NUCLEAR POWER PLA NTS I.
PRIOR TO 1970 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION==
PLANT NAME CONSTRUCTION ESTIMAlf COMPLETE REACTOR MWE DURATION l
DRESDEN 1 8
05-01-56 0 9 5 9C 100%
BWR 200 40.9 I
YAHKEE-ROWE 1 03-01-58 07-09-t0C 100%
PWR 175 28.3 l
INDIAH POINT 1 m
12-01-56 03-26-62C 100%
PWR 265 63.8 HUMBOLDT BAY 11-01-60 08-28-62C 100%
BWR 65 21.9 l
I l
BIG ROCK POINT 1 M
03-01-60 08-30-62C 100%
BWR 72 30.0 I
SAN OHOFRE 1 N
07-01-64 03-27-67C 100%
PWR 436 32.9 HADDAM NECK M
04-01-64 06-30-67C 100%
PWR 582 39.0 LA CROSSE N
06-01-62 07-63-67C 100%
BWR 50 61.1 OYSTER CREEK 1 M
09-01-63 04-09-69C 100%
BWR 650 67.3 HINE MILE POINT 1 07-01-63 08-22-69C 100%
BWR 620 73.7 GINHA M
04-01-66 09-19-69C 100%.
PWR 470 41.6 DRESDEN 2 09-01-65 12-22-69C 100%
BWR 794 51.7 AVE: 365 AVE:
46.0 CALENDAR YEAR 1970 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION==
PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION ROBINSON 2 M
02-01-67 07-31-70C 100%
PWR 700 42.0 MONTICELLO N
09-01-66 09-08-70C 100%
BWR 545 48.2 POINT BEACH 1 N
01-01-67 10-05-70C 100%
PWR 497 45.1 MILLSTCHE 1 M
03-01-66 10-06-70C 100%
BWR 660 55.2 AVE: 601 AVE:
47.6 CALENDAR YEAR 1971 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION um PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION DRESDEN 3 03-01-66 01-12-71C 100%
BWR 794 58.4 PALISADES M
08-01-68 03-24-71C 100%
PWR 805 31.8 QUAD CITIES 1 10-01-66 10-01-71C 100%
BWR 789 60.0 INDIAN POINT 2 W
01-01-66 10-19-71C 100%
PWR 873 69.6 POINT BEACH 2 M
01-01-67 11-16-71C 100%
PWR 497 58.5 AVE: 752 AVE:
55.7 THE DURATION FOR HUCLEAR POWER PLANT CONSTRUCTION IS DEFINED AS THE ELAPSED TIME FROM ACTUAL GROUND BREAKING UNTIL THE PLANT IS CONSIDERED READY FOR NOTE:
FUEL LOADING.
THIS DOES NOT INCLUDE IN AVERAGE FIRST OF A MULTI UNIT OR A SINGLE UNIT APPLICATION.
DURATION OF SIX (6) MONTHS FOR POWER ASCENSION TO
- N IN CALENDAR MONTHS.
COMMERCIAL OPERATION.
. -....... - ~ -, -. _
AVERAGE C0NSTRUCVION DURAT10NS PAGE NO 1-007 l
NUCLEAR P0WER PLANY5 CALENDAR YEAR 1972 - ACTUAL DURATIONS i
START FLD PERCENT TYPE DESIGN CONSTRUCTION mm PLANT NAME CONSTRUCTIQM ESTIMATE COMPLETE REACTOR MWE DURATION VERMONT YANKEE 1 W
12-12-67 0 3-21-72C 100%
BWR 514 51.3 QUAD CITIES 2 10-01-66 03-31-72C 100%
BWR 789 66.0 SURRY 1 M
12-01-66 05-25-72C 100%
PWR 788 65.8 PILGRIM 1 w
02-01-67 06-08-72C 10C%
BWR 655 64.2 TURKEY POINT 3 w
01-01-67 07-19-72C 100%
06-01-68 09-15-72C 100%
PWR 825 51.5 l
1 AVE: 711 AVE:
60.9 CALENDAR YEAR 1973 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION mu PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR FWE DURATION I
SURRY 2 12-01-66 01-29-73C 100%
PWR 788 73.9 OCONEE 1 m
03-01-67 02-06-73C 100%
PWR 887 71.2 ZION 1 04-01-68 04-06-73C 100%
PWR 1040 60.2 TURKEY POINT 4 01-01-67 04-10-73C 100%
PWR 693 75.3 FORT CALHOUN 1 M
02-01-68 05-23-73C 100%
PWR 478 63.7 i
BROWNS FERRY 1 M
09-01-66 06-26-73C 100%
BWR 1065 81.8 PEACH BOTTOM 2 02-01-67 08-08-73C 100%
BWR 1065 78.2 t
PRAIRIE ISLAND 1 N
06-01-68 08-09-73C 100%
PWR 530 62.3 OCONEE 2 03-01-67 10-06-73C 100%
PWR 887 79.2 s
ZION 2 '
04-01-68 11-14-73C 100%
PWR 1040 67.4 i
FORT ST VRA!!i
.M 05-01-68 12-21-73C 100%
HTGR 330 67.7 j
sKEWAUNEE M
12-01-67 12-21-73C 100%
PWR 535 72.7 a
AVE: 778 AVE:
71.1 I.
3*
(
, s
, + -.
s 4
r 4
't 4
s s.-
{
4
\\
N 4
s s
1
~ +,
a e
h\\
, h.,
.._.. ~. - - -,.. - =
~ ~
~..
.~. _..
a a
\\,
AVERAGE C0N STRUCTION DURAT IONS PAGE NO:
1-008 NUCLEAR POWER PLANTS I
CALENDAR YEAR 1974 - ACTUAL DURATIONS i
3 START FLD PERCENT TYPE DESIGN CONSTRUCTION mm i
PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION COOPER STATION N
02-01-68 01-18-74C 100%
BWR 778 71.6 j
DUANE ARNOLD 09-01-70 02-22-74C 100%
BWR 538 41.7 THREE MILE ISLAND 1 m
01-01-68 04-19-74C 100%
PWR 819 75.6 1
ARKANSAS 1 m
12-01-68 05-21-74C 100%
PWR 850 65.7 BROWNS FERRY 2 09-01-66 06-28-74C 100%
BWR 1065 93.9 PEACH BOTTOM 3 02-01-67 07-02-74C 100%
BWR 1065 89.0 1
OCONEE 3.
11-01-67 07-19-74C 100%
PWR 887 80.6 CALVERT CLIFFS 1 m
02-01-68 07-31-74C 100%
PWR 845 78.0 HATCH 1 M
09-01-68 08-06-74C 100%
BWR 777 71.2 RANCHO SECO 1 04-01-69 08-16-74C 100%
PWR 918 64.5 FITZPATRICK M
01-01-69 10-17-74C 100%
BWR 821
- 9.5 COOK 1 03-01-69 10-25-74C 100%
PWR 1054 T.8 PRAIRIE ISLAND 2 06-01-68 10-29-74C 100%
PWR 530
- ,.9 BRUNSWICK 2 m
10-01-69 12-27-74C 100%
BWR 821 i.9 AVE: 841 AVE:
72.1 CALENDAR YEAR 1975 - ACTUAL DURATIONS
- l START FLD PERCENT TYPE DESIGN CONSTRUCTION nu i
4 PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION MILLSTONE 2 M
11-01-69 08-01-75C 100%
PWR 870 69.0 TROJAN N
03-01-70 11-21-75C 100%
PWR 1130 68.7 INDIAN POINT 3 10-01-67 12-12-75C 100%
PWR 965 98.4 l
[
AVE: 988 AVE:
78.7 i
1 CALENDAR YEAR 1976 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION Mu PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION BEAVER VALLEY 1 06-01-69 01-30-76C 100%
02-15-69 03-01-76C 100%
PWR 802 84.5 3
BROWNS FERRY 3 09-00-66 07-02-76C 100%
BWR 1065 118.1 S A L Ef1 1 01-00 08-13-76C 100%
PWR 1090 103.4 CALVERT CLIFFS 2 02-00-68 08-13-76C 100%
PWR 845 102.4 BRUNSWICK 1 07-00-70 09-01-76C 100%
BWR 821 74.0 i
CRYSTAL RIVER 3 u
09-25-68 11-22-76C 100%
PWR 825 97.9 I
i AVE: 900 AVE:
94.3 j
4 l
3 1
t
A V ERAGE C0NS TRUCT ION DUR A T IONS PAGE NO:
1-00C HUCLEA R POWER PL AN T 5 i
CALENDAR YEAR 1977 - ACTUAL PURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
PLANT NAME CONSTRUCTION ES T Yr1\\ T F CC 'nt ET E REACTOR f"'E PilPATTON DAVIS-BESSE 1 09-10-70 04-18-77C 100%
PWR 906 79.3 FARLEY 1 a
10-00-70 06-25-77C 100%
PUR 829 80.8 i
NORTH ANNA 1 12-08-69 10-31-77C 100%
PWR 907 94.8 i
C00K 2 03-25-69 12-21-77C 100%
PWR 1100 104.9 AVE: 936 AVE:
90.0 CALENDAR YEAR 1978 - ACTUAL DURATIONS STARI FLD PERCENT TYPE DESIGN CONSTRUCTION **
PLANT N A *11 CONSTPUCTION ESTIMtTE COMPLETE REACTOR
_tji:E__
DUDATION THREE MILE ISLAND 2 02-01-69 01-01-78C 100%
FWR 906 107.0 HATCH 2 09-01-68 05-01-78C 100%
BUE 784 116.0 ARKANSAS 2 a
05-15-71 06-19-78C 100%
PWR 912 85.1 AVE: 867 AVE: 102.7 l
i CALENDAR YEAR 1979 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
PLANT NAME CON %TPUCTION
[ STIMATE C0!1PLETE RFACTOR MuF 00eATION NO PLANTS LOADED FUEL DURING CALENDAR YEAR 1979.
l CALENDAR YEAR 1980 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
a PLANT HAME CONSTRUCTION E1T I.i A T E C0!1P L FT E PEACTOR F1'J E D'IR AT ION l
SEQUOYAH 1 05-05-69 02-29-80C 100%
PWR 1123 129.8 l
NORTH ANNA 2 12-08-69 04-11-80C 100%
FWR 907 124.1 SALEM 2 01-01-68 04-18-80C 100%
PUR 1115 147.6 FARLEY 2 10-00-70 10-00-CCC 100%
PWR C29 120.0 AVE: 995 AVE: 130.4 I
I
A UERA GE C0NSTRUC T ION DURA T IONS PAGE NO:
1-0t0 NUCL EAR POWER PLA N TS CALENDAR YEAR 1981 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION==
i PLANT NAME CONSTRUCTION ESTIPATE CCf*P L ET E DFACTCR MUE DURATInN l
l MCGUIRE 1 04-01-71 01-00-81C 100%
PWR 1180 117.0 SEQUOYAH 2 05-05-69 07-00-81C 100%
PWR 1148 145.8 AVE: 1164 AVE: 131.4 CALENDAR YEAR 1982 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CCNSTRUCTION==
PLANT NAME CONSTRUCTION ESTIMATE CCMPLETE REACTOR
. MWE DUPATION i
l SAN ONOFRE 2 02-04-74 02-00-82C 100%
PWR 1100 95.9 LASALLE 1 10-00-73 04-15-82 99%
EWR 1078 102.5 SUMMER 1 04-00-73 05-00-82 99%
PWR 900 109.0 l
GRAND GULF 1 05-03-74 05-14-82 97%
EUR 1250 96.4 i
DIABLO CANYON 2 06-14-68 07-00-82 98%
PWR 1106 168.5 SUSQUEHANNA 1 11-00-73 07-01-82 93%
BWR 1052 104.0 SHORENAM 11-00-72 09-20-82 88%
EWR 849 118.7 l
ST LUCIE 2 a
05-02-77 10-28-82 84%
PWR 842 65.9 i
SAN ONOFRE 3 02-07-74 11-01-82 87%
PWR 1100 104.8 PALO VERDE 1 m
05-00-76 11-01-82 97%
PUR 1304 78.0 ENRICO FERMI 2 05-00-69 11-30-82 38%
BWR 1093 163.0 1
ZIMMER 1
=
03-00-71 12-00-82 98%
BWR 810 141.0 AVE: 1040 AVE: 112.3 i
1 1
1 i
l i
i
AV ERA GE C0N 5TRUCT ION DUR A T ION $
PAGE NO:
1-011 NUCL EAR POWER PLANTS CALENDAR YEAR 1983 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CCNSTRUCTION *=
PLANT NAME CONSTPUCTION LSTIMATE CC"PLETE PFACTOR MUE DURATION WATERFCRD 3 11-14-74 01-00-83 94%
PWR 1151 97.5 BYRON 1 04-00-75 04-00-83 82%
PWR 1120 96.0 MCGUIRE 2 04-01-71 04-01-83 98%
PWR 1180 144.0 LASALLE 2 10-00-73 04-30-83 85%
EWR 1078 115.0 CCMANCHE PEAK 1 10-00-74 06-00-83 89%
PWR 1150 104.0 CALLAWAY 1 09-03-75 06-01-83 81%
PWR 1188 92.9 MIDLAND 2 03-00-73 07-00-83 77%
PWR 818 124.0 WATTS BAR 1 12-26-72 08-00-83 81%
PWR 1165 127.1 WASHINGTON NUCLEAR 2
=
08-00-72 09-00-83 89%
BWR 1103 133.0 BELLEFONTE 1 a
09-00-74 09-00-83 80%
FWR 1235 108.0 PEPRY 1 5
10-00-74 11-00-83 81%
EUR 1205 109.0 PALO VERDE ?
06-00-76 11-00-83 85%
PWR 1304 89.0 SEABROS.
- 07-00-76 11-30-83 63%
PWR 1198 89.0 MIOLAND 1 03-00-73 12-00-83 77%
PWR 492 129.0 WOLF CREEK 1
=
01-24-77 12-16-83 80%
PWR 1150 82.7 AVE: 1102 AVE: 109.3 CALENDAR YEAR 1984 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
l PLANT NAME CONSTRUCTION ESTIt1 ATE C0t1P'_ E T E REACTOR
_L'W E DURATION l
6 SUSQUE)1*NNA 2 11-00-73 01-00-84 65%
BWR 1052 122.0 CLINTON 1
=
10-06-75 01-03-84 83%
BWR 950 98.9 BYRUN 2 04-00-75 04-00-84 66%
PWR 1120 105.0 WATTS BAR 2 12-26-72 08-00-84 58%
FMR 1165 139.1 BELLEFCNTE 2 09-00-74 09-00-84 67%
PWR 1235 120.0 LIMERICK 1 C5-00-70 10-00-84 72%
BWR 1065 173.0 CATAWBA 1 05-16-74 11-00-84 89%
PWR 1145 125.5 NARRIS 1 01-14-74 12-00-84 60%
PWR 915 130.5 AVE: 1081 AVE: 127.1
A V ERAGE C0N 5T RUCT ION DURA T IONS PACE dO:
1-012 N UCL EA R POWER P L A NTS i
CALENDAR YEAR 1935 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
PtsNT NAME CONSTUUCTION ESTIPATE C D'F L ET E REACTOR PNE DURATION B R AIC'!OCD 1 08-00-75 04-00-85 62%
PUR 1120 116.0 RIVER BEND 1 04-03-79 04-00-85 46%
EWR 934 71.7 C4-00-77 03-00-85 50%
PWR 1242 100.0 WACHINGTON NUCLEAR 3 PALO VERCE 3 06-00-76 11-00-85 39%
PWR 1304 113.0 08-01-75 12-00-85 61%
PWR 1267 124.0 WASHINGTCN NUCLEAR 1 MILLSTCNE 3 05-00-74 12-01-85 43%
PWR 1159 139.0 l
EEAVER VALLEY 2 05-04-74 12-31-85 51%
PWR 852 139.9 i
AVE: 1125 AVE: 114.8 CALENDAR (EAR 1986 - PROJECTED CURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION
- W PLANT NAME CONSTPUCTION ESTIMATE CO*9t ET E PEACTOR PWE DllRATION SEABPOOK 2 07-00-76 02-28-86 12%
PUR 1198 115.9 NINE f1ILE POINT 2
=
08-25-75 03-00-86 44%
BWR 1080 126.2 BRAICWGOD 2 08-00-75 04-00-86 49%
PWR 1120 128.0 MARELE NILL 1 08-00-77 06-00-86 35%
PWR 1130 106.0 03-00-76 06-00-86 46%
BWR 1067 125.0 HOPE CREEK 1 V0GTLE 1 08-01-76 09-01-86 29%
PWR 1100 121.0 AVE: 1116 AVE: 120.0 CALENDAR YEAR 1987 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
PLANT NAME CONSTPUCTION ESTIMATE COMPLETE REACTOR ttW E DURATION CATAWBA 2 05-16-74 03-00-87 42%
PWR 1145 153.5 LIriERICK 2 05-00-70 04-00-87 300 EUR 1065 203.0 PERRY 2 10-00-74 05-00-87 41%
BUR 1205 151.0 MARBLE HILL 2 12-00-77 06-00-87 17%
PWR 1130 114.0 AVE: 1136 AVE: 155.4 0
l
AUER A GE C0NSTRUCT ION DUR A T IONS PAGE NO:
1-013 NUCLEAR POWER P LANTS CALENDAR YEAR 1988 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
PLANT NAME C0 tis T P !)C T I O N ESTIMATE COMPLETE REACTOR r?' ' E DVDATICN V0GTLE 2 08-01-76 03-01-88 10%
PWR 1100 139.0 HARRIS 2 01-14-74 06-01-88 04%
PWR 915 172.6 AVE: 1008 AVE: 155.8 CALENDAR YEAR 1989 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
i PLANT NAME CONSTPliCTION ESTIM%TE COMPLETE REACTOR
_GJE Dif R A T ICH NORTH ANNA 3 w
07-00-72 04-00-89 08%
PWR 907 201.0 YELLCW CREEK 1 02-09-78 07-01-89 35%
PWR 1285 136.7 AVE: 1096 AVE: 168.9 i
CALENDAR YEARS 1990 THRU 1999 - PROJECTED DURATIDHS START FLD PERCENT TYPE DESIGN CONSTRUCTION **
PLtNT NAME CONSTRUCTION ESTIMATE 0l'P L ET F REACTOR t *M E DURATISH HARTSVILLE A-1 W
04-22-76 01-01-90 44%
~1205 164.3 HARTSVILLE A-2 04-22-76 01-01-91 34%
BWR 1205 176.3 PHIPPS BEND 1 W
10-19-77 01-00-93 29%
BWR 1220 182.4 AVE: 1210 AVE: 174.3
--e Z
O t,.D La.I C/')
.- -. - ~ - -, _ _ -
1 i
C0NSTRUCT ION 5TAVUS REPQRT PAGE N0: 3-002 i
BEAVER VALLEY 2 NUCLEA R POWER PLANTS STATUS AS OF:
03-31-82 t
PLANT CHARACTER I$T I C 5:
KEY PERS0NNEL:
DOCKET NO:
05000412 CORPORATE CONTACT:
E. J. WOOLEVER. VICE PRESIDENT CP NO. 8 DATE ISSUED:
CPPR-105/ 05-03-74 CP EXPIRATION DATE:
02-01-80 CORPORATE ADDRESS:
436 SIXTH AVENUE APPLICANT:
DUQUESNE LIGHT PITTSBURGH, PENNSYLVANIA 15219 PLANT LOCATION:
5 MI E OF E.
LIVERPOOL, OH IE REGIDH:
1 CORPORATE PHONE ND:
(412) 471-4300. EXT. 6430 AE STONE a WEBSTER NSSS:
WESTINGHOUSE CONSTRUCTOR:
STCHE & WEBSTER NRC LPM:
E.
DOOLITTLE REACTOR TYPE:
DER (MWE):
0852 IE RESIDENT INSPECTOR:
GLENN A. WALTON INSPECT ION STA T U St FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
09-27-74 02-00-81 FINANCING PROBLEMS.
82-01 01-02-82 02-26-82 04-01-76 08-00-81 NO REASON GIVEN BY THE UTILITY.
82-02 03-01-82 04-07-82 07-14-76 12-00-81 SITE SOIL FOUNDATION PROBLEMS.
82-03 03-24-82 OPEN 09-13-78 10-00-82 NO REASON GIVr" BY THE UTILITY.
11-15-78 12-00-83 FINANCIAL CC,
.DERATIONS AND REDUCED LOAD FORECA%.s.
06-19-80 12-00-85 REDUCTION IN.EVEL OF CONSTRUCTION 1
Inspection Reports are avalIable at local PDRs.
ACTIVITY DUE TO FINANCIAL CONSIDERATIONS.
(
l-i i
4 2
i t
h L0 CAL PUBLIC D0CUMENT R 0 0 Ms B.
F.
JONES MEMORIAL LIBRARY 663 FRANKLIN AVENUE i
ALIQUIPPA, PENNSYLVANIA 15001 4
C0N5T2UCTION STATUS REPQRT PAGE NO: 2-@03 BEAVER VALLEY 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-31-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-31-83 DEFINED IN CP (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
02-00-79 (LATEST) 12-31-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-31-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 51%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: STATUS AS OF 03-01-82.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETIQH COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
05-04-74 05-04-74 07-31-74 07-31-74 100%
PLACE !IRUCTURAL CONCRETE:
11-22-76 11-22-76 09-03-84 85%
INSTALL REACTOR PRESSURE VESSEL:
11-30-81 11-16-81 03-25-85 6%
INSTALL LARGE BORE PROCESS PIPE:
06-12-78 06-12-78 05-01-84 58%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
07-17-78 07-17-78 05-01-84 43%
INSTALL SMALL BORE PIPE:
12-01-81 01-04-82 04-18-85 4%
INSTALL CABLE TRAY:
03-28-77 03-28-77 04-18-83 76%
INSTALL EXPOSED METAL CONDUIT 03-13-78 03-13-78 06-03-85 40%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
06-22-81 06-22-81 04-22-85 4%
INSTALL ELECTRICAL TERMINATIONS:
03-08-82 06-24-85 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
01-28-85 03-25-85 0%
CONDUCT HOT FUNCTIONAL TEST:
04-01-85 09-09-85 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
12-12-85 12-31-85 0%
C0NSTRUCT ION ST ATUS REPQRT PAGE NO: 2-004 BELLEFONTE 1 NUCL EA R POWER PLAN TS STATUS AS OF:
03-31-82 P L A N T CHARA CTERIST I C 5:
K EY PERS0NNELa DOCKET NO:
05000438 CORPORATE CONTACT:
E. G. PARRIS, MANAGER CP HO. & DATE ISSUED: CPPR-122/ 12-24-74 0F POWER CP EXPIRATION DATE:
03-01-82 CORPORATE ADDRESS:
500A CHESTNUT ST. TOWER II APPLICANT:
TENNESSEE VALLEY AUTHORITf CHATTANDOGA, TENNESSEE 37401 PLANT LOCATION:
6 MI NE OF SCOTTSBORO, ALA IE REGIDH:
2 CORPORATE PHONE NO:
(615) 751-2823 AE:
TENNESSEE VALLEY AUTHORITY NSSSt BABCOCK & WILCOX CONSTRUCTOR:
TENNESSEE VALLEY AUTHORITY NRC LPM:
R. HERNAN REACTOR TYPE:
R.
V.
CRLENJAK DER (MWE):
1235 IE RESIDENT INSPECTOR:
J. WILCOX IN5P ECT ION S TA T U 5:
FUEL L0AD DA TE CHANGES TIME P"RIOD AS REP 0RTED BY UT I L I T Y:
Jan. 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
04-11-75 12-00-79 NO REASON NOTED.
8201 01-05-82 01-08-82 09-06-78 03-00-81 NO REASON NOTED.
8202 01-01-82 01-31-82 08-16-79 09-00-82 NO REASON NOTED, 8203 02-09-82 02-12-82 09-10-80 03-00-83 NO REASON NOTED.
8204 02-22-82 02-26-82 12-01-81 09-00-83 NO REASON NOTED.
8205 03-02-82 03-05-82 8206 02-01-82 03-05-82 8207 03-09-82 03-12-82 8209 03-01-82 03-31-82 Inspection reports are available at local PDRs.
i l
)
L0CA L PUBLIC D0CUMENT R 0 0 M:
SCOTTSBORO PUBLIC LIBRARY 1002 SOUTH BROAD STREET SCOTTSBORD, ALABAMA 35768
C0NSVRUCYION STATUS REPORT PAGE NO: 2-003 BELLEFONTE 1 NUCLEA R POWER PLANTS STAVUS AS OF:
03-31-82 C0N5TRUCT ION STA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
09-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
03-00-83 DEFINED IN CP: (EARLIEST) 06-01-79 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
06-00-79 (LATEST) 12-01-79 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 08-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 80%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETTON
[QMPLETION 3_[QMPLETE MOBILIZE AND PREPARE SITE:
09-00-74 07-00-75 100%
PLACE STRUCTURAL CONCRETE:
06-00-75 10-00-75 100%
INSTALL REACTOR PRESSURE VESSEL:
08-00-76 11-00-76 100%
INSTALL LARGE BORE PROCESS PIPE:
10-00-75 01-00-83 98%
INSTALL LARGE BORE PIPE HINGERS, RESTRAINTS AND SHUBBERS:
05-00-77 01-00-83 79%
INSTALL SMALL BORE PIPE:
01-00-76 01-00-83 89%
INSTALL CABLE TRAY:
02-00-77 07-00-82 99%
INSTALL EXPOSED METAL CONDUIT:
04-00-75 09-00-82 94%
INSTALL POWER, CONTROL, INSTPUMENTATION AND SECURITY CABLE:
11-00-77 01-00-83 78%
INSTALL ELECTRICAL TERMINATIONS:
03-00-78 01-00-83 68%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
12-00-82 12-00-82 0%
CONDUCT NOT FUNCTIONAL TEST:
01-00-83 04-00-83 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
02-00-82 01-00-82 09-00-83 1%
1
C0NSTRUCT ION STA TUS REPORT PAGE NO: 2-006 BELLEFONTE 2 NUCL EAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTER IST I C St KEY P E R S 0 N N E L:
DOCKET NO:
05000439 CORPORATE CONTACT:
H.
G. PARRIS, MANAGER CP NO. 8 DATE ISSUED: CPPR-123/ 12-24-74 0F POWER CP EXPIRATION DATE:
12-01-83 CORPORATE ADDRESS:
500A CHESTNUT ST. TOWER II APPLICANT:
TENNESSEE VALLEY AUTHORITY CHATTANDOGA, TENNESSEE 37401 PLANT LOCATION:
6 MI NE OF SCOTTSBORD, ALA IE REGION:
2 CORPORATE PHONE NO:
(615) 751-2823 AE TENNESSEE VALLEY AUTHORITY NSSS:
BABCOCK 8 WILCOX CONSTRUCTOR TENNESSEE VALLEY AUTHORITY NRC LPM:
R.
HERNAN REACTOR TYPE:
R. V. CRLENJAK DER (MWE):
1235 IE RESIDENT INSPECTOR:
J. WILCOX KHSPECT ION STA T U St FUEL L0AD DA T E CHANGES TIME PERIOD AS REPORTED BY UTIL I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
04-11-75 12-00-79 HO REASON HOTED.
8201 01-05-82 01-08-82 09-06-78 03-00-81 NO REASON NOTED.
8202 01-01-82 01-31-82 08-16-79 09-00-82 NO REASON N01ED.
I 8203 02-09-82 02-12-82 09-10-80 12-00-83 NO REASON NOTED.
f 8204 02-22-82 02-26-82 01-20-82 09-00-84 NO REASON NOTED.
8205 03-02-82 03-05-82 8206 02-01-82 03-05-82 8207 03-09-82 03-12-82 8209 03-01-82 03-31-82 Inspection reports are available at local PDRs.
L0 CAL PUBLIC D0CUMENT 'R 0 0 Mr SCOTTSBORD PUBLIC LIBRARY 1002 SOUTH BROAD STREET SCOTTSBORD, ALABAMA 35768
C0NSTRUCT ION STA TUS REPQRT PAGE NO: 2-007 BELLEFCNTE 2 NUCL EA R POWER PLAN TS STATUS AS OF:
03-31-82 C0H S TR UCT I ON S TA T U 5:
AFPLICAHT'S CURRENT ESTIMATED FUEL LOADING DATE:
09-00-84 APPLICANTS CONSTRUCTIDH COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-00-83 DEFINED IN CP: (EARLIEST) 03-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
03-00-80 (LATEST) 09-01-80 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 08-00-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 67%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETIQ3 % COMPLETE MOBILIZE AND PREPARE SITE:
09-00-74 07-00-75 800%
PLACE STRUCTURAL CONCRETE:
06-00-75 09-00-75 100%
INSTALL REACTOR PRESSURE VESSEL:
02-00-77 02-00-77 100%
INSTALL LARGE BORE PROCESS PIPE:
10-00-75 10-00-83 67%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNJBBERS:
07-00-78 11-00-83 38%
INSTALL SMALL BORE PIPE:
09-00-77 12-00-83 43%
INSTALL CABLE TRAY:
05-00-77 11-00-82 96%
INSTALL EXPOSED METAL CONDUIT:
10-00-75 04-00-83 72%
INSTALL POWER, CONTROL, IHSTRUMENTATION AND SECURITY CABLE:
03-00-78 11-00-83 56%
INSTALL ELECTRICAL TERMINATIONS:
04-00-78 11-00-83 52%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
12-00-83 12-00-83 0%
CONDUCT HOT FUNCTIONAL TEST:
01-00-84 04-00-84 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
02-00-83 09-00-84 0%
C0NSTRUCTION
$TATUS REPQRV PAGE NO: 2-008 BRAIDWOOD 1 NUCLEA^
POWER PLA NTS STATUS AS OF 03-31-82 PLANT CHARACTERIST I C S:
K EY PERSONNEL:
DOCKET NO:
05000456 CORPORATE CONTACT:
B. LEE, VICE PRESIDENT CP HO. 8 DATE ISSUED:
CPR-132 / 12-31-75 CP EXPIRATION DATE:
11-01-82 CORPORATE ADDRESS:
P. O. BOX 767 CHICAGO, ILLINDIS 60690 APPLICANT:
COMMONWEALTH EDISON PLANT LOCATION:
24 MI SSW OF JOLIET. ILL IE REGION:
3 CORPORATE PHONE NO:
(312) 294-3103 AEs SARGENT 4 LUNDY NSSS:
WESTINGHOUSE CONSTRUCTOR:
COMMONWEALTH EDISON NRC LPM:
K. KIPER REACTOR TYPE:
J. HINDS DER (MWE):
1120 IE RESIDENT INSPECTOR:
L. MC GREGOR INSPECT ION 5TATUS FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.
OF INSP.
01-08-80 04-00-82 NO REASON REPORTED.
8114 11-18-81 11-20-81 05-14-80 04-00-83 DELAY DUE TO FINANCIAL CONSIDERATIONS.
09-15-80 04-00-85 HD REASON REPORTED.
Inspection Reports are available at local PDRs.
L0 CAL PUBL IC D0CUMENT R00Mr WILMINGTON TOWNSHIP PUBLIC LIBRARY 201 S. KANKAKEE STREET WILMINGTON. ILLINDIS 60481
.... ~. _ ~.~.___.- - --
.. -~..
- - ~. - - -. - - - - -.. -
~ ~.. - - - - -.. -. - -. _..
- ~.. -. - - -.
C0NSTRUCTION STATUS REPQRT PAGE NO: 2-009 BRAIDWOOD 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATER 04-00-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
04-00-83 DEFINED IN CP (EARLIEST) 11-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-00-81 (LATEST) 11-02-82 t
j APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-31-85
{
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 62%
I COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
I ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED i
START START COMPLETION COMPLETION % COMPLETE i
MOPILIZE AND PREPARE SITE:
08-00-75 03-00-76 100%
PLACE STRUCTURAL CONCRETE:
03-00-76 07-00-84 98%
INSTALL REACTOR PRESSURE VESSEL:
04-00-79 04-00-79 100%
l INSTALL LARGE BORE PROCESS PIPE:
04-00-76 02-00-83 72%
l INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:
08-00-77 09-00-84 38%
i INSTALL SMALL BORE PIPE:
08-00-76 11-00-83 21%
i, INSTALL CABLE TRAY:
12-00-76 12-00-82 95%
INSTALL EXPOSED METAL CONDUIT:
08-00-78 05-00-84 31%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
11-00-78 06-00-84 18%
1 INSTALL ELECTRICAL TERMINATIONS:
11-00-78 07-00-84 17%
i l
CONDUCT REACTOR COLD HYDROSTATIC TEST 09-00-82 09-00-82 0%
}
CONDUCT HOT FUNCTIONAL TEST:
08-00-84 04-00-85 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
10-00-82 04-00-85 0%
3 4
i i
I i
C0N 5 TRUCT ION 5TA TUS R EPQRT PAGE ND: 2-010 BFAIDWOOD 2 dUCL EAR POWER PLANTS STATUS AS OF:
03-31-82 P LA N T CHA RACTER IST ICS KEY P E R S 0 N N E L:
DOCKET NO:
05000457 CORPORATE CONTACT:
B. LEE, VICE PRESIDENT CP NO. & DATE ISSUED:
CPR-133 / 12-31-75 CP EXPIRATION DATE:
11-01-83 CORPORATE ADDRESS:
P. O.
BOX 767 APPLICANTr COMMONWEALTH EDISON CHICAGO, ILLINDIS 60690 PLANT LOCATIONe 24 MI SSW OF JOLIET, ILL IE REGION:
3 CORPORATE PHONE ND:
(312) 294-3103 AE:
SARGENT & LUNDY NSSS:
WESTINGHOUSE CONSTRUCTOR:
COMMONWEALTH EDISON NRC LPM:
K.
KIPER REACTOR TYPE:
J.
HINDS DER (MWE):
1120 IE RESIDENT INSPECTOR:
L. MC GREGOR IN5P ECT ION STA T U St FUEL L0A D DATE CHANGES TIME PERIOD AS REPORTED BY U T I L I T Y:
Jan, 1942 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.
OF INSP, 01-08-80 04-00-83 NO REASON REPORTED.
8114 11-18-81 11-20-81 05-14-80 04-00-84 DELAY DUE TO FINANCIAL CONSIDERATIONS.
03-15-80 04-00-86 NO REASON REPORTED.
Inspection Reports are available at local PDRs.
L0CA L PU BL I C D0CUMENT R 0 0 M:
WILMINGTON TOWHSHIP PUBLIC LIBRARY 201 S.
KANKAKEE STREET WILMINGTON, ILLINOIS 60481 1
4
C0NSTRUCTION STAYUS REPORT PAGE NO: 2-011 BRAIDWOOD 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-00-86 APPLICANTS CONSTRUCTION COMPLETI0H ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
04-00-84 DEFINED IN CP: (EARLIEST) 11-01-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-00-82 (LATEST) 11-01-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-31-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 49%
COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION 3_[QMPLETE MOBILIZE AND PREPARE SITE:
08-00-75 03-00-76 100%
PLACE STRUCTURAL CONCRETE:
03-00-76 07-00-84 98%
INSTALL REACTOR PRESSURE VESSEL:
11-00-80 11-00-80 100%
INSTALL LARGE BORE PROCESS PIPE:
05-00-76 02-00-83 23%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS 08-00-77 09-00-85 16%
INSTALL SMALL BORE PIPE:
08-00-76 12-00-84 10%
INSTALL CABIC TRAY:
12-00-76 12-00-83 54%
INSTALL EXPOSED METAL CONDUIT 01-00-79 05-00-85 8%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
12-00-78 06-00-85 2%
INSTALL ELECTRICAL TERMINATIONS:
12-00-78 07-00-85 1%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
09-00-83 09-00-83 0%
CONDUCT HOT FUNCTIONAL TEST 08-00-85 04-00-86 0%
CONDUCT PREOP AND ACCEPTANCE TESTS HECE!SARY FOR FUEL LOAD:
10-00-83 04-00-86 0%
C 0'N S T R U C T ION STA VUS R EPORT PAGE NO: 2-012 BVRON 1 NUCL EAR POWER PLANTS STATUS AS OF 03-31-82 PLANT CHARACTER IST I C S:
K EY PERSONN E L:
DOCKET NO:
05000454 CORPORATE CONTACT:
B.
LEE, VICE PRESIDENT CP NO. 8 DATE ISSUED:
CPR-130 / 12-31-75 CP EXPIRATION DATE:
CORPORATE ADDRESS:
P.
O.
BOX 767 APPLICANT:
COMMONWEALTH EDISON CHICAGO, ILLINDIS 60690 PLANT LOCATION:
17 MI SW OF ROCKFORD, ILL IE REGION:
3 CORPORATE PHONE NO:
(312) 294-3103 AE SARGENT 8 LUNDY NSSS:
WESTINGHOUSE CONSTRUCTOR:
COMMONWEALTH EDISON NRC LPM:
S. CHESTNUT REACTOR TYPE:
J. HINDS l
DER (MWE):
1120 IE RESIDENT INSPECTOR:
W.
FORNEY INSPECTION STA T U 5:
FUEL L0A D DA TE CHANGES TIME PERIOD A S REPORTED BY UTILITYa Jan, 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
01-05-77 10-00-80 NO REASON GIVEN.
8201 01-12-82 01-14-82 03-01-78 03-01-81 REVISED LOAD DEMAND FORECAST.
8203 11-02-81 01-31-82 01-08-80 04-00-82 NO REASON REPORTED.
8204 02-01-82 02-19-82 09-15-80 04-00-83 NO REASON REPORTED.
Inspection Reports are available at local PDRs.
L0CA L PUBL IC D0CUMENT R00M BYRON PUBLIC LIBRARY THIRD AND WASHINGTON STREET BYRON, ILLINOIS 61010
C0NST RUCT ION STA TUS R EP0RT PAGE HD: 2-013 BYRCH 1 HUCL EA R POWER PL A H TS STATUS AS OF 03-31-82 C0H S TR UC T ION STA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS AFPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
04-00-82 DEFINED IN CP: (EARLIEST) 05-01-80 APPLICANT'S ESTIMAlED FUEL LOADING DATE AT CP ISSUANCE:
05-00-80 (LATEST) 06-01-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 02-29-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 82%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
04-00-75 12-00-75 100%
PLACE STRUCTURAL CONCRETE:
12-00-75 07-00-82 99%
IHSTALL REACTOR PRESSURE VESSEL:
09-00-78 11-00-78 100%
INSTALL LARGE BORE PROCESS PIPE:
01-00-76 07-00-82 99%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
05-00-77 03-00-83 63%
l INSTALL SMALL BORE PIPE:
08-00-76 06-00-82 97%
l INSTALL CABLE TRAY:
12-00-76 11-00-81 11-00-81 100%
IHSTALL EXPOSED METAL CONDUIT:
02-00-78 11-00-82 78%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
08-00-78 12-00-82 72%
IHSTALL ELECTRICAL TERMINATIONS:
08-00-78 02-00-83 56%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
07-00-81 07-00-81 100%
CONDUCT HOT FUNCTIONAL TEST:
11-00-82 04-00-83 0%
CONDUCT PREOP AHD ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
06-00-80 04-00-83 23%
C0N5T2UCT ION 5TATUS REPQRV PAGE NO: 2-014 BYRON 2 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 PLA NT CHA RA CTER ISTIC5:
KEY PERSONNELa DOCKET NO:
05000455 CORPORATE CONTACT:
B. LEE, VICE PRESIDENT CP NO. 4 DATE ISSUED: CPR-131 / 12-31-75 CP EXPIRATION DATE:
CORPORATE ADDRESS:
P. O. BOX 767 APPLICANT:
COMMONWEALTH EDISON CHICACO, ILLINDIS 60690 PLANT LOCATION:
17 MI SW OF ROCKFORD, ILL IE REGION:
3 CORPORATE PHONE NO:
(312) 294-3103 AE:
SARGENT 8 LUNDY NSSS:
WESTINGHOUSE CONSTRUCTOR:
COMMONWEALTH EDISON NRC LPM:
S. CHESTNUT REACTOR TYPE:
J. HINDS DER (MWE):
1120 IE RESIDENT INSPECTOR:
W. FORNEY INSPECT ION ST A T U St FUEL L0AD DA TE CHANGES TIME PERIOD AS REP 0RTED BY UTILITYr Jan, 1982 - Mac, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
01-14-76 05-00-82 NO REASON HOTED.
8201 01-12-82 01-14-82 01-08-80 03-00-83 NO REASON REPORTED.
8202 11-02-81 01-31-82 09-1S-80 04-00-84 NO REASON REPORTED.
8203 02-01-82 02-19-82 Inspection Reports are available at local PDRs.
l l
l L0 CAL PUBL IC D0CUMENT R 0 0 Ms l
BYRON PUBLIC LIBRARY l
l THIRD AND WASHINGTON STREET BYRON, ILLINDIS 61010 l
~_....i.i....--..
C0N5TRUC730N SYAYUS REPORT PAGE NO: 2-015 BVRON 2 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 C0NSTRUCTIOH STA T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:
04-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
03-00-83 DEFINED IN CP: (EARLIEST) 11-01-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-00-81 (LATEST) 11-01-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 02-28-85 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE: 66%
CUMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
04-00-75 02-00-76 100%
PLACE STRUCTURAL CONCRETE:
02-00-76 07-00-82 98%
INSTALL REACTOR PRESSURE VESSEL:
07-00-79 10-00-79 100%
INSTALL LARGE BORE PROCESS PIPEk 05-00-76 04-00-83 47%
INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SHUBBERS:
05-00-77 11-00-83 26%
INSTALL SMALL BORE PIPE:
08-00-76 07-00-83 18%
INSTALL CABLE TRAY:
12-00-76 06-00-82 96%
INSTALL EXPOSED METAL CONDUIT:
02-00-78 09-00-83 32%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
11-00-78 10-00-83 23%
IHSTALL ELECTRICAL TERMINATIONS:
11-00-78 11-00-83 25%
CONDUCT REACTOR COLD HYDROSTATIC TEST 03-00-83 03-00-83 0%
CONDUCT HOT FUNCTIONAL TEST 09-00-83 04-00-84 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:
06-00-82 04-00-84 0%
C0N5TRUCTION 5TA TUS REPQRT PAGE NO: 2-0 16 CALLAWAY 1 NUCLEAR POWER PL A NTS STATUS AS OF:
03-31-82 PLANT CHARACTER IST I C 5:
KEY PERS0NNEL DOCKET NO:
05000483 CORPORATE CONTACT:
D.
F. SCHNELL, VICE PRESIDENT CP NO. 8 DATE ISSUED:
CPPR-139/ 04-16-76 NUCLEAR CP EXPIRATION DATE:
02-28-82 CORPORATE ADDRESS:
P.
O.
BOX 149 APPLICANT:
UNION ELECTRIC ST. LOUIS, MISSOURI 63166 PLANT LOCATION:
to MI SE OF FULTON, MO IE REGIDH:
3 CORPORATE PHONE NO:
(314) 621-3222 AE BECHTEL NSSS:
WESTINGHOUSE CONSTRUCTOR:
DANIEL INTERNATIONAL HRC LPM:
G.
EDISON REACTOR TYPE:
J. KONKLIN DER (MWE):
1188 IE RESIDENT INSPECTCR:
J. HEISLER INSPECT ION S T A T U S:
FUEL L0a D DA T E CHANGES TIME PERIOD AS REPORTED BY UT I L I T Y:
Jan. 1982 - Mar. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBE8 0F INSP.
OF INSP, 0?-14-77 12-01-81 FINANCING IMPACT OF PROPOSITION 1 PASSAGE 8201 01-11-82 01-15-82 BY STATE OF MISSOURI VOTERS.
03-02-78 04-01-82 NO REASON PROVIDED BY THE UTILITY.
09-21-80 10-01-82 NO REASON PROVIDED.
. Inspection Reports are available at local PDRs.
10-09-81 06-01-83 THE DELAY RESULTED PRIMARILY FROM PROBLEMS WITH NEETING CONSTRUCTION SCHEDULES AND A REAPPRAISAL OF THE WORK REMAINING TO BE COMPLETED.
FULTON CITY LIBRARY OLIN LIBRARY OF WASHINGTON 709 MARKET STREET UNIVERSITY FULTON, MISSOURI 65251 SKINKER & LINDELL BLVD.
I C0N S TR UCT I OH STA TUS R EPORT PAGE NO: 2-017 CALLAWAY 1 N UC L EA R POWER P L AN T S STATUS AS OF:
03-31-82 C0N 5T R UC T I ON S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
06-01-83 APPLICAHTS CONSTRUCTION COMPLETICH ESTIMATE AS APPLICANT'S FREVIOUS ESTIMATED FUEL LOADING DATE:
10-01-82 DEFINED IN CP: (EARLIEST) 06-30-81 I
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
0u-01-81 (LATEST) 02-28-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: EARLY 1984 CURRENT ESTIMATED PERCEHT CONSTRUCTIDH COMPLETE: 81%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETIOM % COMPLETE MOBILIZE AND PREPARE SITE:
09-03-75 05-01-76 100%
PLACE STRUCTURAL CONCRETE:
04-01-76 10-01-82 99%
INSTALL REACTOR PRESSURE VESSEL:
03-15-79 08-01-82 80%
INSTALL LARGE BORE PROCESS PIPE:
01-12-78 08-01-82 92%
INSTALL LARGE BORE PIPE HANGERS, RESTRAIHTS AND SNUBBERS:
01-10-78 04-01-83 67%
INSTALL SMALL BORE PIPE:
01-19-78 01-02-83 79%
INSTALL CABLE TRAY:
07-09-78 07-01-82 98%
INSTALL EXPOSED METAL CONDUIT:
07-01-78 01-02-83 81%
INSTALL POWER COHTROL, INSTRUMENTATION AND SECURITY CABLE:
08-08-79 02-01-83 77%
INSTALL ELECTRICAL TERMINATIONS:
04-04-80 03-01-83 52%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
07-23-82 07-27-82 0%
CONDUCT HOT FUNCTIONAL TEST:
12-06-82 12-17-82 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
12-31-81 10-30-81 04-07-83 11%
l l
-_-.._______..___m
_1-..
-m..
C0NSTRUCT ION
$TA TUS R EPQRT PAGE NO: 3-098 CATAWBA 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLAHT C H A R A C T E P I S T I C S:
K EY P E R 5 0 N N E L:
I DOCKET NO:
05000413 CORPORATE CONTACT:
W.
H. OWEN, SR. VICE PRESIDENT e
CP HO. 4 DATE ISSUED:
CPR-116 / 08-07-75 DESIGN ENGINEERING DEPARTMENT CP EXPIRATION DATE:
06-01-81 CORPORATE ADDRESS:
POWER BUILDING /422 SOUTH CHURCH ST.
APPLICANT:
DUKE POWER CHARLOTTE, NORTH CAROLINA 28201 PLANT LOCATION:
6 MI NHW OF ROCK HILL, SC i
IE REGION:
2 CORPORATE PHONE NO:
(704) 373-4120 i
AE:
DUKE POWER 4
NSSS:
CONSTRUCTOR:
DUKE POWER HRC LPM:
K. JABBOUR REACTOR TYPE:
DER (MWE):
1145 IE RESIDENT INSPECTOR:
K. VAN DOORN I
{
IN5PECTION STA TUS FUEL L0AD DA TE CHANGES I
TIME PERIOD AS REP 0RTED BY UT I L I T Y:
1 Jan, 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE i
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY j
NyMBE8 0F INSP.
OF INSP.
09-27-74 08-00-80 CONSTRUCTION DELAYS DUE TO CRITICAL l
8201 02-23-82 02-26-82 CONDITIONS EXISTING IN THE FINANCIAL J
8202 01-05-82 01-08-82 MARKETS.
8203 12-26-81 01-25-82 05-00-77 09-00-80 REVISED LOAD FORECASTS.
8205 02-23-82 02-26-82 03-00-78 02-00-81 PROJECTED LOAD FORECAST.
8206 01-26-82 02-25-82 01-00-80 06-00-83 NO REASON REPORTED.
i 8207 02-26-82 03-25-82 05-01-80 04-00-83 NO REASON REPORTED.
1 08-00-80 08-00-83 MAJOR l' HIT RESCHEDULE.
Inspection reports are available at local PDRs.
05-00-82 11-00-84 NO REASON REPORTED.
i i
l i
i 4
j L0CA L PUBLIC D0CUMENT R 0 0 M:
YORK COUNTY LIBRARY 325 SOUTH OAKLAND AVENUE ROCK HILL, SOUTH CAROLINA 29730 i
t
C0HSTRUCTIOH
$TA TUS REPORT PAGE NO: 2-019 CATAWBA 1 HUCL EA R POWER PLANTS STATUS AS OF 03-31-82 C0HSTRUCT ION
$TA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
11-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
08-00-83 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
12-00-78 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 07-18-85 CURRENT ESTIMATED PERCEHT CONSTRUCTIDH COMPLETER 89%
COMMENTS REGARDIHG CURREHT CONSTRUCTIOH STATUS: STATUS IS HOT REPORTED FOR PIPING OH THE BASIS OF PIPE SIZE.
STATUS IS NOT RECORDED FOR CABLE TRAY OR EXPOSED METAL CONDUIT.
FIRST PASS OF THE SCHEDULE EFFORT WAS COMPLE*ED THE FIRST OF MAY.
ADDITIONAL REASSESSMENT IS CORRENTLY IN PROGRESS AND SHOULD BE COMPLETED BY THE LAST OF MAY.
WILL PROVIDE THE RESULTS OF THE UPDATE INFORMATION IN THE SECOND QUARTER UPDATE.
l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START CpMPLETION COMPLETIRN 3_CQMPLETE MOBILIZE AND PREPARE SITE:
05-16-74 05-16-74 10-01-76 04-01-76 100%
PLACE STRUCTURAL CONCRETE:
04-01-76 04-05-76 99%
INSTALL REACTOR PRESSURE VESSEL:
06-01-78 06-09-78 07-13-78 07-13-78 100%
IHSTALL LARGE BORE PROCESS PIPE:
04-01-77 04-08-77 98%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
11-01-78 11-01-78 77%
l INSTALL SMALL BORE PIPE:
N/A N/A N/A N/A N/A INSTALL CABLE TRAY:
N/A N/A N/A N/A N/A IHSTALL EXPOSED METAL CONDUIT:
N/A N/A N/A N/A N/A INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
08-01-78 08-21-78 88%
IHSTALL ELECTRICAL TERMIHATIONS:
09-01-78 10-06-78 73%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
0%
CONDUCT HOT FUNCTIONAL TEST 0%
CONDUCT PREOP AHD ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
0%
O
C0N$TRUCT ION 5TATUS REPORT PAGE NO: 2-020 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 CATAWBA 2 PLANT CHARACT ER I5T I C S:
KEY PERS0NN E La DOCKET NO:
05000414 CORPORATE CONTACT:
W. H. OWEN, SR. VICE PRESIDENT DESIGN ENGINEERING DEPARTMENT CP HO. 3 DATE ISSUED:
CPR-117 / 08-07-75 CP EXP!RATIDH DATE:
06-01-82 CORPORATE ADDRESS:
POWER BUILDING /422 SOUTH CHURCH ST.
CHARLOTTE, NORTH CAROLINA 28201 APPLICANT:
DUKE POWER PLANT LOCATION:
6 MI HNW OF ROCK HILL, SC CORPORATE PHONE NO:
(704) 334-4120 IE REGI0Hz 2
AE DUKE POWER NSSS:
WESTINGHOUSE CONSTRUCTOR:
DUKE POWER NRC L*PM:
K. JABBOUR REACTGR TYPE:
DER (MWE):
1145 IE RESIDENT INSPECTOR:
K. VAN DOORN IN$PECT ION S T A T U 5:
FUEL L0AD DA TE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY-Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY l
NUMBER OF INSP.
OF INSP, 09-27-74 08-00-81 CONSTRUCTION DELAYS DUE TO CRITICAL CONDITIONS EXISTING IN THE FINANCIAL 8201 02-23-82 02-26-82 8202 01-05-82 01-08-82 MARKETS.
8203 12-26-81 01-25-82 05-00-77 08-00-82 REVISED LOAD FORECASTS.
8205 02-23-82 02-26-82 03-05-80 10-00-84 NO REASON GIVEN.
8206 01-26-32 02-25-82 08-00-80 02-00-85 MAJOR UNIT RESCHEDULE 05-00-82 03-00-87 HO REASON PROVIDED.
Inspection reports are available at local PDRs.
l l
l l
l l
L0 CAL PUBL IC D0CUMENT R00M l
YORK COUNTY LIBRARY 325 SOUTH OAKLAND AVENUE ROCK HILL, SOUTH CAROLINA 29730 l
C0HST RUCT ION ST A TUS R EPORT P. AGE NO: 2-021 CATAWBA 2 HUC L EA R P OWER PLA H TS STATUS AS OF 03-31-82 C0N 5 T RUCT I ON S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
03-00-87 APPLICANTS CONSTRUCTICH COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
02-00-85 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
12-00-79 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 11-00-87 CURREH1 ESTIMATED PERCEHT CONSTRUCTION COMPLETE: 42%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: STATUS IS NOT REPORTED FOR PIF
- N THE BASIS OF PIPE SIZE.
STATUS IS NOT RECORDED FOR CAL.
'tAY OR EXPOSED METAL CONDUIT.
FIRST PASS OF THE SCHEDULE EFFORT WAS COMPLETED THE FIRST OF MAY.
ADDITIOHAL REASSESSMENT IS CURRENTLY IN PROGRESS AND SHOULD BE COMPLETED BY THE LAST OF MAY.
WE WILL PROVIDE THE RESULTS OF THE UPDATED INFORMATION IN THE SECOND QUARTER UPDATE.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION
$pMPLETION %_$QMPLETE MOBILIZE AND PREPARE SITE:
05-16-74 05-16-74 10-01-76 04-01-76 100%
PLACE STRUCTURAL CONCRETE:
08-01-76 08-01-76 96%
INSTALL REACTOR PRESSURE VESSEL:
01-05-80 01-18-80 04-15-80 04-15-80 100%
INSTALL LARGE BORE PROCESS PIPE:
01-05-77 01-05-77 58%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
07-01-81 15%
INSTALL SMALL BORE PIPE:
N/A N/A N/A N/A N/A INSTALL CABLE TRAY:
N/A N/A N/A N/A N/A INSTALL EXPOSED METAL CONDUIT:
N/A N/A N/A N/A N/A INSTALL POWER, C0HTROL, INSTRUMENTATION AND SECURITY CABLE:
11-01-79 11-01-79 25%
INSTALL ELECTRICAL TERMINATIONS:
11-15-79 11-19-79 18%
0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
0%
CONDUCT HOT FU"0TIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
0%
C0NSTRUCT IOh STATUS R EPQRV PAGE N0: 2-023 CHEROKEE 1 HUCL EA R P0WER PLANTS STATUS AS OF 03-31-82 PLANT CHARA CT E R I S T I C 5:
KEY P E R S 0 H H E L:
4 DOCKET NO:
05000491 CORPORATE CONTACT:
W. H. OWEN. SR. VICE PRESIDENT l
CP NO. 8 DATE ISSUED: CPPR-167/ 12-30-77 DESIGN ENGINEERING DEPARTMENT 1
CP EXPIRATION DATE:
CORPORATE ADDRESS:
POWER BUILDING /422 SOUTH CHURCH ST.
APPLICANT:
DUKE POWER CHARLOTTE, HORTH CAROLINA 28201 PLANT LOCATION:
21 MI E OF SPARTAHBURG, SC IE REGION:
2 CORPORATE PHONE HO:
(704) 373-4120 AE DUKE POWER HSSS:
COMBUSTION ENGINEERING CONSTRUCTOR:
DUKE POWER NRC LPM:
UNASSIGHED REACTOR TYPE:
DER (MWE):
1280 IE RESIDENT INSPECTOR:
IHSP ECT IOH $TA T U St FUEL L0A D DAT E CHAHGES TIME PERIOD AS REP 0RTED BY UTILITY Jan, 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.
OF INSP.
05-09-78 05-00-84 REVISED LOAD FORECAST.
NDHE 03-05-80 07-00-89 NO REASON GIVEN.
09-30-81 N/S CONSTRUCTION STOPPED.
Inspection reports are ava n'lable 'at local PDRs.
s s
,x l
9 4
t
=
I
\\
\\
'\\
q 7
4 s
s L0CA L PUBLIC D0CUMEHT R 0 0 M:
N s;
s '
CHEROKEE COUNTY LIBRARY
('
300 E.
RUTLEDGE AVENUE 4
s
-CAFFHEY, SOUTH CAROLINA 29340
,g f
N 4
s s
s
),
t
'\\
4
.~.
j
' I s
i C 0 N 5 V R U C T I,0 N
$TAVUS REPOQT PQGE NO: 2-023 CHEROKEE 1 NUCLEAR POWEQ PL0NTS STATUS AS OF 03-31-82
(
C0N5TRUCTION 5TATUSt
-, c APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/S.
APPLICANTS CONSTRUCTION COMPLETION ESTIMATE.AS 1
APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
07-00-89 DEFINED IN CP (EARLIEST) s APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
0S-00-83 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL CPERATION DATE: N/S 5
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
18%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: CONSTRUCTION STOPPED.
l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION LOMPLETIQ3 % COMPLETE l
MOBILIZE AND PREPARE SITE:
07-09-76 03-01-78 100~
t f
PLACE STRUCTURAL CONCRETE:
03-01-78 48%
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
(
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
05-30-76 1%
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS
- CONDUCT REACTOR COLD HYDROSTATIC TEST I
CONDUCT NOT FUNCTIONAL TEST CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD I
i l
l
. - - i
C0N5TRUCT ION
$TA TUS 3EPORT PAGE NO: 2-024 CHEROKEE 2 NUCLEAR POWER PLA N TS STATUS AS OF:
03-31-82 I
PLANT CHA RACT ER I S T I C 5:
KEY P ERS0NN E L:
DOCKET NO:
05000492 CORPORATE CONTACT:
W.
H.
OWEN. SR. VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-168/ 12-30-77 DESIGN ENGINEERING CEPARTMENT CP EXPIRATION DATE:
CORPOR ATE ADDRESS:
POWER BUILDING /422 SOUIH CHURCH ST.
APPLICANT:
DUKE POWER CHARLOTTE, NORTH CAROLINA 25201 i
PLANT LOCATION:
21 MI E OF SPARTANBURG, SC IE REGION:
2 CORPORATE PHONE HO:
(704) 373-4120 AE2 DUKE POWER HSSS:
COMBUSTION ENGINEERING CONSTRUOTOR:
DUKE POWER NRC LPM:
UNASSIGNED REACTOR TYPE:
DER (MWE):
1280 IE RESIDENT INSPECTOR:
INSPECT ION ST A T U S:
FUEL L0AD DA T E CH A N GES TIME PERIOD AS REPQRTED BY UT IL I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE PEPORTED BY UTILITY NUMBER OF INSP.
OF INSP, j
01-25-78 11-00-85 1.
LOWER FORECASTS FOR GROWTH IN DEMAND.
HONE 2.
UNCERTAINTY REGARDING THE PERKINS UNITS.
i 04-31-78 05-00-86 PROJECTED LOAD GROWTH.
Inspection reports are available at Iocal PDRs.
03-05-80 07-00-91 NO REASON GIVEN.
09-30-81 N/S CONSTRUCTION STOPPED.
L0CA L PUBL IC D0CUMENT R 0 0 Mr CHEROKEE COUNTY LIBRARY 300 E. RUTLEDGE AVENUE GAFFNEY. SOUTH CAROLINA 29340 i
4
C0NSTRUCT ION 5TA TUS REPORT PAGE NO: 2-02S CHEROKEE 2 NUCL EA R POWER PLAN TS STA,TUS AS OF:
03-31-82 C0N5TRUCT I0N STA T U 5:
APPLICAHT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A5 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
07-00-95 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-00-85 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
0%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: CONSTRUCT 10N STOPPED.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTINATED START START COMPLETION COMPLETION 1_{gMPLETE MOBILIZE AND PREPARE SITE:
07-09-76 So%
PLACE STRUCTURAL CONCRETE:
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
IHSTALL SMALL BORE PIPE:
IHSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER, CONTROL, INSTRUMENTATIDH AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AHD ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
f C0N $TRUCY ION 5TA TUS REP 0RT PAGE NO: 2-026 CHEROKEE 3 NUCL EA R POWER PLA NTS STATUS AS OF:
03-31-82 1
I PL A N T CHA RACT ER I 5 T I C St K EY PERS0NN E L:
DOCKET NO:
05000493 CORPORATE CONTACT:
W.
H.
OWEN. 5R. VICE PRESIDENT CP NO. 8 CATE ISSUED:
CPPR-169/ 12-30-77 CESIGN ENGINEERING CEPARTMENT CP EXPIRATIDH DATE:
CORPORATE ADDRESS:
POWER BUILDING /422 SOUTH CHURCH ST.
I e
APPLICANT:
DUKE POWER CHARLOTTE. NORTH CAROLINA 28201 FLANT LOCATION:
21 MI E OF SPARTANBURG. SC i
IE REGION:
2 CORPORATE PHONE NO:
(704) 373-4120 1
AE:
DUKE POWER I
1 HSSS:
CCMBUSTION ENGINEERING CONSTRUCTOR:
DUKE POWER NRC LPM:
UNASSIGNED REACTOR TYPE:
i DER (MWE):
1280 IE RESIDENT INSPECTOR:
1 IN SPECT ION 5TA T U S:
FUEL L0AD DA T E CH ANGES TIME PERIOD A$ REPQRT ED BY U T I L I T Y:
Jan, 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBlR OF INSP.
OF INSP.
04-00-80 N/S CONSTRUCTION STOPPED.
i NONE I
Inspection reports are available a&. Iocal PDRs.
t L0CA L PUBL I C D0CUMENT R 0 0 M:
CHEROKEE COUNTY LIBRARY 300 E.
RUTLEDGE AVENUE GAFFNEY. SOUTH CAROLINA 29340 i
l i
i
C0NSTRUCT IOH STA TUS REP 0RT PAGE NO: 2-027 CHEROKEE 3 NUCLEAR P O W F. R PLANT S STATUS AS OF 03-31-82 C0HSTRUCTION ST A T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/$
APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
05-00-83 DEFINED IN CP: LEARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-00-88 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
0%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: CONSTRUCTION STOPPED.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
07-09-76 50%
PLACE STRUCTURAL CONCRETE:
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER, CONTROL, INSTRUMENTATICN AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
C0N$TRUCT ION STA TUS REPORT PAGE NO: 2-029 CLINTON 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERI$T ICS KEY PERSONN E L:
DOCKET NO:
05000461 CORPORATE CONTACT:
W. C.
GERSTNER, EXEC VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-137/ 02-24-76 CP EXPIRATION DATE:
CORPORATE ADDRESS:
500 SOUTH 27TH STREET APPLICANT:
ILLINDIS POWER DECATUR, ILLINDIS 62525 PLANT LOCATION:
6 MI E OF CLINTON, ILL IE REGION:
3 CORPORATE PHONE NO:
(217) 937-1111, EXT. 2811 AE:
SARGENT 4 LUNDY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
BALDWIN ASSOCIATES HRC LPM:
J.
M.
WILLIAMS REACTOR TYPE:
H. M. WESCOTT DER (MWE):
0950 IE RESIDENT INSPECTOR:
H.
LIVERMORE 1
IN$PECT ION $TA T U St FUEL L0AD DA TE CHANGES TIME PERIOD AS REPORTED BY UT IL I T Y:
Jan, 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
05-09-77 04-00-81 REEVALUATION OF CONSTRUCTION SCHEDULE.
8130 12-07-81 12-11-81 06-23-78 04-00-82 TIME LOST DUE TO SEVERE WEATHER 8132 12-01-81 12-31-81 CONDITIONS.
8201 01-01-82 02-15-82 01-21-81 01-00-83 REEVALUATICH OF CONSTRUCTION SCHEDULE.
8203 01-29-82 01-29-82 04-29-82 01-03-84 REEVALUATION OF CONSTRUTION SCHEDULE.
-Inspection Reports are available at local PDRs.
L0CA L PUBL IC D0CUMENT R00ML i
VESPASIAN WARNER PUBLIC LIBRARY 120 WEST JOHNSON STREET CLINTON, ILLINDIS 61727 1
1
C0NSTRUCTION STA TUS REPORT PAGE NO: 2-029 CLINTON 1 NUCLEAR POWER PLANTS SVAVUS AS OF 03-31-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
01-03-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
01-03-33 DEFINED IN CP: (EARLIEST) 10-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-00-80 (LATEST) 10-01-53 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 08-31-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 83%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: CRITICAL PATH ACTIVITIES ARE ESTIMATED TO BE 115 DAYS BENIND SCHEDULE.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED
_ START START COMPLETION COMPLETION 1_$0MPLETE MOBILIZE AND PREPARE SITE:
10-06-75 03-16-76 100%
PLACE STRUCTURAL CONCRETE:
02-25-76 01-00-83 99%
INSTALL REACTOR PRESSURE VESSEL:
10-06-79 10-15-79 100%
INSTALL LARGE BORE PROCESS PIPE:
05-01-76 07-15-83 94%
INST ALL L ARGE BORE PIPE HANGERS. RESTRAINTS AND SNUBBERS:
05-01-76 08-15-83 83%
INSTALL SMALL BORE PIPE:
06-n1-77 09-01-83 90%
INSTALL CABLE TRAY:
06-01-78 02-18-83 93%
INSTALL EXPOSED METAL CONDUIT:
06-01-78 02-29-83 81%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
12-12-79 10-03-83 53%
INSTALL ELECTRICAL TERMINATIONS:
04-01-80 11-01-83 47%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
02-23-83 04-03-83 0%
CONDUCT HOT FUNCTIONAL TEST N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
03-06-81 11-28-83 4%
C0NSTRUCT ION STATUS REPQRT PAGE NO: 2-030 CLItiTON 2 NUCLEAR POWER PL AN TS STATUS AS OF 03-31-82 P L ANT CHA RACT ER I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000462 CORPORATE CONTACT:
W.
C. GERSTNER, EXEC VICE PRESIDENT CP NO. 1 DATE ISSUED:
CPPR-138/ 02-24-76 CP EXPIRATION DATE:
CORPORATE ADDRESS:
500 SOUTH 27TH STREET A P P L I C r.N T :
ILLINDIS POWER DECATUR, ILLINDIS 62525 PLANT LOCATION:
6 MI E OF CLINTON, ILL IE REGION:
3 CORPORATE PHONE NO:
(217) 937-1111 EXT. 2811
)
AE:
SARGENT 8 LUNDY l
NSSS:
GEHERAL ELECTRIC CONSTRUCTOR:
BALDWIN ASSOCIATES HRC LPM:
J. M. WILLIAMS REACTOR TYPE:
H.
M. WESCOTT DER (MWE):
0950 IE RESIDENT INSPECTOR:
H.
LIVERMORE I N5PEC T ION STA T U S:
FUEL L0AD DA TE CHA NGES TIME PERIOD AS REPORTED BY U T I L I T Y:
Jan. 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP, 03-24-77 10-00-87 FINANCIAL CONSIDERATIONS AND UNCERTAINTY NO INSPECTIONS FOR THIS PERIOD.
OVER FEDERAL NUCLEAR GENERATION AND FUEL POLICIES.
Inspection Reports are available at local PDRs.
11-20-81 N/S REDUCED LOAD GROWTH RATE.
l L 0CA L PUBL IC D0CUMENT R 0 0 M:
VESPASIAN WARNER PUBLIC LIBRARY 120 WEST JOHNSON STREET CLINTON, ILLINDIS 61727
C0N$TRUCTION 5TATUS REPQRT PAGE NO: 2-031 CLINTON 2 NUCLEAR P0WER PLANT $
STATUS AS OF:
03-31-G2 C0NSTRUCTION 5TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/$
APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-87 DEFINED IN CP: (EARLIEST) 10-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-00-83 (LATEST) 10-01-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
1x COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: UNIT 2 CONSTRUCTION DEFERRED INDEFINITELY.
I i
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION SpMP1XT1QH % COMPLETE MOBILIZE AND PREPARE SITE:
10-06-75 03-16-16 100%
PLACE STRUCTURAL CONCRETE:
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
t INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRt.Y INSTALL EXPOSED METAL CONDUIT
- INSTALL POWER, CONTROL INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST CONDUCT PREOP AND ACCEPTANCE 1ESTS NECESSARY FOR FUEL LOAD:
Y
C0HSTRUC7 ION STAVUS REPORT PAGE NO: 2-032 COMANCHE PEAK 1 HUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLAHT CHARACTERISTIC $8 KEY P E R S 0 N H E La DOCKET N02 05000443 CORPORATE CONTACT:
R. J. GARY, EXEC. VICE PRESIDENT 4 CP NO. 8 DATE ISSUED: CPPR-126/ 12-19-74 GENERAL MANAGER - TUGO CP EXPIRATION DATE:
08-01-81 CORPORATE ADDRESS:
2001 BRYAH TOWER APPLICANT:
TEXAS UTILITIES GENERATING DALLAS, TEXAS 75201 PLANT LOCATION:
4 MI N OF GLEN ROSE, TEX IE REGION:
4 CORPORATE PHONE NO (214) 653-4600 AE GIBBS & HILL INC.
NSSS:
WESTINGHOUSE CONSTRUCTOR:
BROWN & ROOT NRC LPM:
S. BURWELL REACTOR TYPE:
DER (MWE):
1150 IE RESIDENT INSPECTOR:
R. G.
TAYLOR INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Jan, 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.
OF INSP.
05-00-76 05-01-79 NO REASON REPORTED.
8201 01-18-82 01-31-82 07-00-77 03-00-8C RESCHEDULED COMMERCIAL OPERATION DATE.
8232 01-01-82 02-28-82 11-00-79 03-15-81 NO REASON REPORTED.
8204 03-15-82 03-19-82 08-00-80 12-00-31 NO REASON REPORTED.
11-0'-St 06-00 83 NO REASON REPORTED.
Inspection reports are available at local PDRs.
L0 CAL PUBLIC D0CUMENT R 0 0 Mr.
SOMERVELL COUNTY PUBLIC LIBRARY ON THE SQUARE P. O. BOX 417 GLEN ROSE TEXAS 76043
-.L-e-
4
-w w
ui-am-+~--
4
- + - -
-e L-
.&i
-+, -
.m-C0NSTRUCT ION
$TATUS REP 0R T PAGE NO: 2-933 CDMAN HE PEAK 1 NUCLEA R POWER PLA NT S STATUS AS OFI 03-31-82 I
C 0 t' S T R U C T ION ST A T U St APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
06-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-00-81 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
06-00-79 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 03-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE: 89%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE M03ILIZE AND PREPARE SITE:
08-00-74 10-00-74 100%
PLACE STRUCTURAL CONCRETE:
05-00-75 07-00-75 01-00-82 94%
INSTALL REACTOR PRESSURE VESSEL:
07-00-77 05-00-78 05-00-78 05-00-78 100%
INSTALL LARGE BORE PROCESS PIPE:
05-00-76 07-00-76 12-00-81 99%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND $NUBBERS:
03-00-76 08-00-82 79%
INSTALL SMALL BORE PIPE:
11-00-76 12-00-81 94%
INSTALL CABLE TRAY:
08-00-77 12-00-81 99%
q i
INSTALL EXPOSED METAL CONDUIT:
08-00-77 08-00-82 90%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-00-79 12-00-82 78%
INSTALL ELECTRICAL TERMINATIONS 04-00-79 12-00-82 76%
CONDUCT REACTOR COLD NYDR0 STATIC TEST:
06-00-82 06-00-82 0%
e CONDUCT HOT FUNCTIONAL TEST:
11-00-82 12-00-82 0%
CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
06-00-83 0%
C0N$TRUCT ION
$7A TUS REPQRT PAGE NO: 2-034 COMANCHE PEAK 2 NUCL EAR POWER PLAN TS STATUS AS OF:
03-31-82 PLANT CHARACT ERIST ICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000446 CORPORATE CONTACT:
R.
J. GARY, EXEC. VICE PRESIDENT 8 CP NO. 8 DATE ISSUED:
CPPR-127/ 12-19-74 GENERAL MANAGER - TUGO CP EXPIRATION DATE:
08-01-83 CORPORATE ADDRESS:
2001 BRYAN TOWER APPLICANT:
TEXAS UTILITIES GENERATING DALLAS, TEXAS 75201 PLANT LOCATION:
4 MI N OF GLEN ROSE, TEX IE REGION:
4 CORPORATE PHONE NO:
(214) 653-4600 AE:
GIBBS 8 HILL INC.
NSSS:
WESTINGHOUSE CONSTRUCTOR:
BROUN 8 ROOT NRC LPM:
S. BURWELL REACTOR TYPE:
DER (MME):
1150 IE RESIDENT INSFECTOR:
R. G.
TAYLOR INSPECT ION STATUSt FUEL L0AD DA TE CHANGES TIME PERIOD AS REP 0RT ED BY U T I L I T Y:
Jan. 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
05-00-76 05-01-81 NO REASON REPORTED.
8201 01-18-82 01-31-82 07-00-77 08-00-82 RESCHEDULED COMMERCIAL OPERATION DATE.
8203 03-15-82 03-19-82 11-01-81 N/S SCHEDULE UNDER REVIEW.
4 Inspection reports are available at local PDRs.
L0CA L PUBL IC D0CUMEN T R 0 0 Mr SOMERVELL COUNTY PUBLIC LIBRARY ON THE SQUARE P.
O.
BOX 417 GLEN ROSE, TEXAS 76043
_m m.,._
_m _ _ _
_.m_
___m____
~ _ _ _ _. -. _
C0NSVRUCVION STATUS REPQRV PAGE NO: 2-033 i
1 COMANCHE PEAK 2 NUCLEAR POWER PLANTS STATUS AS OF 03-31-02 C0NSTRUCT ION STATUSt
]
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/$
APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
08-00-82 DEFINED IN CP: (EARLIEST) 1 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
06-00-81 (LATEST)
,1 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S j
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 57%
}
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE FIRST QUARTER OF 1982.
I l
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION SDMPLETIQM 1_LOMPLETE l
MOBILIZE AND PREPARE SITE:
10-'7-74 04-18-75 1004 PLACE STRUCTURAL CONCRETE:
04-18-75 4
i
}
INSTALL REACTOR PRESSURE VESSEL:
06-00-79 08-15-79 100%
I INSTALL LARGE BORE PROCESS PIPE:
l INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
f f
INSTALL SMALL BORE PIPE:
I INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUITS i
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
t j
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
l CONDUCT NOT FUNCTIONAL TEST
[
j CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
f-I 4
i I
1 I
i I
i i
b
C0N STRUCT ION 5TATUS REPQRT PAGE NO: 2-036 DIABLO CANYON 1 NUCL EA R POWER PLAN TS STATUS AS CF:
03-31-82 i
PLANT CHARA CTER I5TICSt KEY PERS0NNEL DOCKET NO:
05000275 CORPORATE CONTACT:
PHILIP A.
CRANE, JR.,
ASSISTANT CP NO. & DATE ISSUED:
CPPR-39 / 04-23-68 GENERAL COUNSEL CP EXPIRATION DATE:
04-30-79 CORPORATE ADDRESS:
77 BEALE STREET APPLICANT:
PACIFIC GAS & ELECTRIC SAN FRANCISCO, CALIFORNIA 94106 PLANT LOCATION:
12 M: WSW OF SAN LUIS OBISPO IE REGION:
5 CORPORATE PHONE NO:
(415) 781-4211
~AE PACIFIC GAS & ELECTRIC NSSS:
WESTINGHOUSE CONSTRUCTOR:
PACIFIC GAS & ELECTRIC NRC LPM:
B. BUCKLEY REACTOR TYPE:
DER (MWE):
1084 IE RESIDENT INSPECTOR:
M. J.
BAGAGLIO INSPECTION STATUSt FUEL L0A D DA T E CHANGES TIME PERIOD AS REPQRTED BY UT I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUM$gg 0F INSP.
OF INSP.
04-00-74 01-00-75 SLOW DOWN IN WORK RESULTING FROM WILDCAT 82-01 01-04-82 01-08-82 STRIKE BY ELECTRICIANS WHEN SECOND SHIFT 82-02 11-13-81 01-08-82 WAS ADDED INSTEAD OF OVERTIME.
INFXPERI-82-03 12-16-81 01-06-82 ENCED NEW HIRES IN AUDITION TO REDUCED 82-04 02-01-82 02-05-82 ELECTRICIAN WORK FORCE CAUSED THE DELAY.
82-05 12-30-81 01-27-82 09-00-74 04-00-75 A STRIKE BY PIPEFITTERS IS STILL IN EFFECT 82-06 01-01-82 01-30-82 AT THE SITE.
THE LICENSEE ESTIMATES AT 82-07 02-08-82 02-12-82 LEAST A 48 DAY FUEL LOAD SLIP AT THIS 82-08 03-15-82 03-19-82 TIME BUT WILL EVALUATE THE EFFECT ON THE 82-09 02-01-82 02-26-82 OVERALL SCHEDULE AT COMPLETION OF STRIKE.
82-10 03-12-82 04-02-82 10-00-74 10-00-75 LICENSEE'S EVALUATION OF STRIKE EFFECTS.
82-11 03-01-82 03-31-82 08-00-75 02-00-76 RETUBING OF MAIN CONDENSER WITH TITANIUM TUBES.
Inspection Reports are available at local PDRs.
10-00-76 03-00-77 DECISION TO PARTIALLY REBLADE PORTIONS OF THE LOW PRESSURE TURBINES.
01-07-77 05-00-77 REBLADING OF THE LOW PRESSURE TURBINES.
04-04-78 08-00-78 REVIEW OF PREOPERATIONAL TEST PROGRAM AND COMPLETION AND APPROVAL OF SEISMIC i
MODIFICATION PROGRAM.
02-00-79 ESTIMATED DATE.
NRC CONTROLLING.
08-00-80 01-00-81 ESTIMATED DA1E.
NRC CCNTROLLING.
09-00-81 03-00-81 NO REASON KNOWN.
12-00-81 03-00-82 ESTIMATED DATE.
03-00-82 N/S L0 CAL PUBL IC D0CUMENT R00N SAN LUIS OBISPO COUNTY FREE LIBRARY 888 MORRO STREET SAN LUIS OBISPO, CALIFORNIA 93406
C0N$7RUCTION 5TATUS REPOQT PAGE NO: 2-037 DIABLO CANf0N 1 NUCLEAR POWER PLANYS STATUS AS OF 03-31-82 C0NSTRUCTION STA T U St APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
03-00-82 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
04-00-72 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 99%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: FUEL LOADING LICENSE SUSPENDED BY THE NRC.
NO UPDATE RECEIVED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
06-14-68 12-00-69 100%
PLACE STRUCTURAL CONCRETE:
12-00-69 100%
INSTALL REACTOR PRES $URE VESSEL:
02-00-73 03-00-73 100%
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SMUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST 06-00-75 08-00-75 100%
CONDUCT NOT FUNCTIONAL TEST 11-00-75 02-00-76 100%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
C0N$TRUCTION ST ATU3 REPQRV PAGE NO: 2-038 DIABLO CANYON 2 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 PLANT CHARACTER IST ICS KEY P E R S 0 N N E L:
DOCKET NO:
05000323 CORPORATE CONTACT:
PHILIP A. CRANE. JR., AS$1STANT CP NO. 8 DATE ISSUED:
CPPR-69 / 12-09-70 GENERAL COUNSEL CP EXPIRATION DATE:
10-31-79 CORPORATE ADDRESS:
77 BEALE STREET APPLICANT:
PACIFIC GAS 8 ELECTRIC SAN FRANCISCO, CALIFORNIA 94106 PLANT LOCATION:
12 MI WSW OF SAN LUIS OBISPO IE REGION:
5 CORPORATE PHONE NO:
(415) 781-4211 AE:
PACIFIC GAS 8 ELECTRIC NSSS:
WESTINGHOUSE CONSTRUCTOR:
PACIFIC GAS 8 ELECTRIC NRC LPM:
B. BUCKLEY REACTOR TYPE:
DER (MWE):
1106 IE RESIDENT INSPECTOR:
M.
J.
BAGAGLIO INSPECT ION STA T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBE8 0F INSP.
OF INSP.
09-00-74 02-00-76 A STRIKE BY THE PIPEFITTERS IS STILL IN 82-01 01-04-82 01-08-82 EFFECT AT THE SITE.
THE LICENSEE 82-02 11-13-81 01-08-82 ESTIMATES AT LEA 3T A 48 DAY FUEL LOAD SLIP 82-03 12-16-81 01-06-82 AT THIS TIME BUT WILL EVALUATE THE EFFECT 82-04 02-01-82 02-05-82 ON THE OVERALL SCHEDULE AT THE COMPLETI0H 82-05 12-30-81 01-27-82 0F THE STRIKE.
82-06 03-12-82 04-02-82 10-00-74 07-00-76 STRIKE.
08-11-75 02-00-77 1 RETUBING OF MAIN CONDENSER WITH Inspection Reports are available at local PDRs.
TITANIUM TUBES (2-3 MONTHS).
2.
INSTALL ATION OF ADDITION AL MAIN ST? JAM RUPTURE RESTRAINTS (4 MONTHS),
10-15-76 08-00-77 ELECTRICAL INSTALLATION PROBLENS.
01-07-77 12-00-77 A GENERAL REEVALUATION OF THE PROJECT SCHEDULE.
01-04-78 01-00-78 NO REASON GIVEN.
02'07-78 03-00-79 GENERAL REEVALUATION OF PROJECT SCHEDULE.
04-14-78 02-00-80 GENERAL REEVALUATION OF PROJECT SCHEDULE.
02-00-80 03-00-80 NO REASON REPORTED.
05-00-80 03-00-81 NO REASON PROVIDED.
09-00-81 07-00-82 NO REASON PROVIDED.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
SAN LUIS OBISPD COUNTY FREE LIBRARY 838 MORRO STREET SAN LUIS OBISPD, CALIFORNIA 93406
C0NSTRUCT ION 5TA TUS REP 0RY PAGE NO: 2-039 DIABLO CANYON 2 NUCLEAR POWER PLANYS STATUS AS OF 03-31-92 C0NSTRUCTION 5 T A T U S:
4 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
07-00-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
03-00-81 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
11-00-74 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 12-00-82 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 98%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE RECEIVED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
06-14-68 05-00-71 100%
i PLACE STRUCTURAL CONCRETE:
05-00-71 100T INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
e i
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
I
C0N$TRUCT ION
$TA TUS QEPQRT PAGE NO: 2-040 ENRICO FERMI 2 NUCLEAR P0WER PLAN TS STATUS AS OF:
03-31-82 PLANT CHARACTERISTIC 5:
KEY PERS0NNEL:
DOCKET NO:
05000341 CORPORATE CONTACT:
H.
TAUBER, VICE PRESIDENT CP NO. 8 DATE ISSUED:
CPPR-87 / 09-27-72 ENGINEERING 8 CONSTRUCTION CP EXPIRATION DATE:
01-01-82 CORPORATE ADDRESS:
2000 SECOND AVENUE APPLICANT:
DETROIT EDISON DETROIT, MICHIGAN 48226 PLANT LOCATION:
LAGUNA BEACH, MICH IE REGION:
3 CORPORATE PHONE ND:
(313) 273-6696 AE:
SARGENT 4 LUNDY NSSS:
CONSTRUCTOR:
DANIEL INTERNATIONAL NRC LPM:
L. KINTNER REACTOR TYPE:
P.
PELKE DER (MWE):
1093 IE RESIDENT INSPECTOR:
B. LITTLE IN$PECTION S T A T U S:
FUEL L0AD DA TE CHANGE 5 TIME PERIOD AS REPQRTED BY UT ILI T Y:
Jan. 1982. Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
12-00-70 08-00-74 1 ENGINEERING AND CONSTRUCTION EFFORTS 8118 11-01-81 11-30-81 MORE EXTENSIVE THAN ANTICIPATED.
8119 12-08-81 12-11-81
- 2. CP EXEMPTION TO DO SUBGRADE WORK 8120 12-01-81 12-31-81 DELAYED FROM 06-70 TO 10-70.
8202 02-01-82 02-03-82 11-00-71 04-00-75 1 REDESIGN OF REACTOR BLDG. DUE TO ADDING DEEP WELLS FOR ECCS PUMPS TO Inspection Reports are available at local PDRs.
MEET CHANGE IN AEC REQUIREMENTS.
- 2. REDESIGN OF RADWASTE BUILDING.
06-00-72 10-00-75 1.
REESTIMATE BASED ON ADDITION CODES, STANDARDS AND REGULATORY GUIDES.
- 2. ADDITIONAL ENVIRONMENTAL HEARING DELAY.
08-00-72 02-00-76 1.
DELAY IN OBTAINING CP DUE TO HEARING BOARD AND APPEALS BOARD.
- 2. ADDITIONAL DESIGN TO DETERMINE DYNAMIC EFFECTS OF DOUBLE ENDED PIPE BREAK.
07-00-73 08-00-76 1 REMOBILIZATION OF STRUCTURE CONTRACTOR
- 2. REVISION OF SCHEDULE BASED ON CHANGES IN SYSTEM TO COMPLY WITH REQUIREMENTS OF NEW REGULATORY GUIDES.
09-27-74 08-00-78 DELAY DUE TO FINANCING PROBLEMS.
11-19-75 01-01-80 FINANCIAL RESTRAINTS.
10-13-78 06-01-80 DELAY DUE TO CRAFT LABOR SHORTAGES.
07-11-79 05-00-81 NO REASON STATED.
08-00-80 11-30-82 NO REASON PROVIDED.
L0 CAL PUBLIC D0CUMENT R 0 0 Mr MONROE COUNTY LIBRARY SYSTEM 3700 SOUTH CUSTER ROAD MONROE, MICHIGAN 48161
'i s
C0NSTRUCTION STA TUS REP 0RT PAGE N0: 2-041 ENRICO FERMI 2 NUCLEAR POWER PLANV$
STAYUS'AS OF 03-31-82 C0NSTRUCTION STA T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
11-30-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
05-00-81 DEFINED IN CP: (EARLIEST) 11-00-82 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
08-00-73 (LATEST) 11-00-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 11-00-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 88%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE RECEIVED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION CCMPLETIQ3 % COMPLETE MJBILIZE AND PREPARE SITE:
05-00-69 10-00-70 100%
FLACE STRUCTURAL CONCRETE:
12-00-70 06-00-79 100%
INSTALL REACTOR PRESSURE VESSEL:
10-00-74 10-00-74 100%
INSTALL LARGE BORE PROCESS PIPE:
06-00-77 06-00-82 99%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND $NUBBERS:
09-00-77 06-00-82 87%
INSTALL SMALL BORE PIPE:
07-00-77 06-00-82 86%
INSTALL CABLE TRAY:
02-00-74 06-00-82 99%
INSTALL EXPOSED METAL CONDUIT:
02-00-74 06-00-82 89%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
04-00-74 05-00-82 87%
INSTALL ELECTRICAL TERMINATIONS:
06-00-74 06-00-82 86%
C0!IDUCT REACTOR COLD HYDROSTATIC TEST:
03-00-82 03-00-82 0%
CC1 DUCT NOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CDiDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
10-00-81 It-00-82 0%
i l
C0N$TRUCT ION
$TA TU$
REP 0RT PAGE NO: 2-042 CPtND GULF 1 NUCLEA R POWER PL AN TS STATUS AS OF:
03-31-82 PLA N T CHA RACT ER I$T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000416 CORPORATE CONTACT:
N.
L.
STAMPLEY. SEN. V. PRESIDENT CP NO. 8 DATE ISSUED: C P P R-118 / 09-04-74 NUCLEAR CP EXPIRATION DATE:
03-01-82 CORPORATE ADDRESS:
P. O.
BOX 1640 APPLICANT MISSISSIPPI POWER 8 LIGHT COMPANY JACKSON, MISSISSIPPI 39205 PLANT LOCATION:
25 MI S OF VICKSBURG, MISS IE PEGION:
2 CORPORATE PHONE NO:
(601) 969-2335 AE:
BECHTEL NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
BECHTEL NRC LPM:
D. H.
HOUSTON REACTOR TYPE:
J.
K.
RAUSCN DER (MME):
1250 IE RESIDENT INSPECTOR:
A. WAGNER I NSP EC T ION $T A T U 5:
FUEL L0AD DA TE CHANGES TIME PERIOD AS REP 0RTED BY UT ILITYa dan, 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBE8 OF INSP.
OF INSP.
01-07-77 10-00-80 CONSTRUCTION DELAY.
8201 01-04-82 01-07-82 09-04-79 11-00-80 HD REASON GIVEN.
8202 01-05-82 01-07-82 01-11-80 09-00-81 NO REASON REPORTED.
8203 01-05-82 01-08-82 05-12-80 08-00-81 NO REASON PROVIDED.
8204 12-16-81 01-11-82 01-16-81 12-00-81 NO REASON PROVIDED.
8205 01-11-82 01-15-82 12-31-81 02-01-82 REEVALUATION OF CONSTRUCTION PROGRESS.
8206 01-18-82 01-20-82 03-05-82 04-23-82 REEVALUATION OF CONSTRUCTION PROGRESS.
8207 01-26-82 01-29-82 04-16-82 05-00-82 REEVALUATION OF CONSTRUCTION AND 8208 02-02-82 02-05-82 TESTING PROGRAM.
8209 01-25-82 01-28-82 8210 02-08-82 02-12-82 8211 02-08-82 02-11-82 8212 02-09-82 02-11-82 8213 01-18-82 02-16-82 8214 02-22-82 02-26-82 8215 02-23-82 02-26-82 8216 02-23-82 02-26-82 8217 02-22-82 02-26-82 8218 02-16-82 03-10-82 8219 03-09-82 03-12-82 8221 03-15-82 03-19-82 8222 03-23-82 03-26-82 8223 03-22-82 03-26-82 8224 03-24-82 03-24-82 L 0CA L POBL IC D0CUMEN T R 0 0 M:
MS. GAYLE KEEF HINDS JdNIOR COLLEGE MCLENDON LIBRARY RAYMOND, MISSISSIPPI 39154
C0N5TRUCT30N
$TATU$
REPORT PAGE N02 2-043 GRAND GULF 1 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 C0N5TRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:
05-14-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
04-23-82 DEFINED IN CP: (EARLIEST) 09-01-30 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
03-00-79 (LATEST) 03-01-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 02-01-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 97%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NOME ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION &_(QMPLETE MOBILIZE AND PREPARE SITE:
05-03-74 06-00-74 100%
PLACE STRUCTURAL CONCRETE:
12-00-74 11-00-81 100%
INSTALL REACTOR PRESSURE VESSEL:
02-00-77 05-00-77 100%
INSTALL LARGE BORE PROCESS PIPE:
04-00-75 02-01-82 02-01-82 100%
INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:
03-00-76 04-30-82 99%
INSTALL SMALL BORE PIPE:
09-00-76 02-00-82 02-15-82 100%
INSTALL CABLE TRAY:
04-00-76 05-00-80 100%
INSTALL EXPOSED METAL CONDUIT:
01-00-77 02-00-82 02-24-82 100%
INSTALL POWER, CONTROL. INSTRUMENTATION AND SECURITY CABLE:
11-00-77 02-00-83 03-03-82 100%
INSTALL ELECTRICAL TERMINATIONS:
02-00-78 02-00-82 03-12-82 100%
CONDUCT REACTOR COLD NYDR0 STATIC TEST 12-00-80 12-00-80 100%
CONDUCT HOT FUNCTIONAL TEST N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
05-00-79 04-29-82 95%
C0N5TRUCTION STATUS REP 0RT PAGE NO: 2-044 GRAND GULF 2 NUCLEAR P0WER PLANTS STATUS AS OF:
03-31-82 f
PLANT CHA RACTER ISTICS:
KEY PER50NNELa DOCKET NO:
05000417 CORPORATE C0FTACT:
N.
L. STAMPLEY, SEN.
V.
PRESIDENT CP HO. 8 DATE ISSUED: CPPR-119/ 09-04-74 NUCLEAR CP EXPIRATIDH DATE:
10-01-84 CORPOR1.TE ADDRESS:
P. O.
BOX 1640 APPLICANT:
MISSISSIPPI POWER 8 LIGHT COMPANY JACKSON, MISSISSIPPI 39205 PLANT LOCATION:
25 MI S OF VICKSBURG, MISS IE REGION:
2 CORPORATE PHONE NO:
(601) 969-2335 AE BECHTEL NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
BECHTEL NRC LPM:
D. HOUSTON REACTOR TYPE:
J.K.
RAUSCH DER (MWE):
1250 IE RESIDENT INSPECTOR:
A.
WAGNER IN$PECTION S T A T U 5:
F L' E L L0AD DA TE CHANGES TIME PERIOD AS REPQRTED BY U T I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REFORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF IN1P, 06-25-76 03-00-83 NO REASON REPORTED FOR THIS SLIPPAGE BY 8201 01-04-82 01-07-82 THE UTILITY.
8203 01-26-82 01-29-82 01-07-77 07-00-83 CONSTRUCTION DELAYS.
8204 02-02-82 02-05-82 01-11-80 09-00-84 NO REASON REPORTED.
i 8205 02-23-82 02-26-82 09-15-80 08-00-85 NO REASON REPORTED.
8206 02-23-82 02-26-82 12-31-81 N/S SCHEDULE UNDER REVIEW.
8207 03-23-82 03-26-82 8208 03-24-82 03-24-82 Inspection reports are available at local PDRs.
i L0 CAL PUBL IC D0CUMENT R 0 0 M:
MS. GAYLE KEEF HINDS JUNIOR COLLEGE MCLENDON LIBRARY RAYMOND, MISSISSIPPI 39154 i
CDNSTRUCT ION
$TAYUS REPQRT PAGE NO: 2-045 GRAND GULF 2 NUCLEAR POWER PLANTS STATUS'AS OF:
03-31-82 C0N S TRUCT ICN STA T U 5:
APPLICANT'S CUPRENT ESTIMATED FUEL LOADING DATE:
N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLIC ANT'S PRE'/IOUS ESTIMATED FUEL LOADING DATE:
08-00-85 DEFINED IN CP: (EARLIEST) 04-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE 03-00-81 (LATEST) 10-01-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 22%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: CONSTRUCTION HALTED ON UNIT 2 AS OF DECEMBER 31, 1979.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
05-03-74 06-00-74 1004 PLACE STRUCTURAL CONCRETE:
01-00-78 60%
INSTALL REACTOR PRESSURE VESSEL:
03-00-79 10%
INSTALL LARGE BORE PROCESS PIPE:
04-00-78 35%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
10-00-79 15%
INSTALL SMALL BORE PIPE:
0%
INSTALL CABLE TRAY:
12-00-78 15%
INSTALL EXPOSED METAL CONDUIT 0%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
0%
INSTALL ELECTRICAL TERMINATIONS:
0%
CONDUCT REACTOR COLD HYDROSTATIC TEST 0%
CONDUCT liOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
0%
-.m
C0H$TRUCTION STAVUS REPORT PAGE NO: 2-046 HARRIS 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL DOCKET NO:
05000400 CORPORATE CONTACT:
M.
A. MCDUFFIE, SEN. V. PRESIDENT CP NO. 8 DATE ISSUED: CPPR-158/ 01-27-78 ENGINEERING & CONSTRUCTION CP EXPIRATION DATE:
06-01-54 CORPORATE ADDRESS:
411 FAYETTEVILLE STREET APPLICANT:
CAROLINA PCWER 3 LIGHT RALEIGH, NORTH CAROLINA 27602 PLANT LOCATIDH:
20 MI SW OF RALEIGH, NC IE REGIDH:
2 CORPORATE PHONE N0s (919) 836-6663 AE:
EBASCO NSSS:
WESTINGHOUSE CONSTRUCTOR:
DANIEL INTERNATIONAL HRC LPM:
E. A. LICITRA REACTOR TYPE:
DER (MWE):
0915 IE RESIDEN! INSPECTOR:
G.
F. MAXWELL INSPECTION 5 T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Lan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
05-07-75 06-01-83 REVISED CURRENT ENERGY AND LOAD FORECAST.
8201 01-19-82 01-22-82 09-08-80 06-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND THAN 8202 12-20-81 01-20-82 PROJECTED.
8204 02-09-82 02-12-82 02-16-81 12-00-84 NO REASON PROVIDED.
8205 01-20-82 02-20-82 8206 02-23-82 02-26-82 8207 03-08-82 03-12-82 8209 02-20-82 03-20-82 Inspection reports are available at local PDRs.
L0 CAL PUBL IC D0CUMENT R00M WAKE COUNTY PUBLIC LIBRARY 104 FAYETTEVILLE STREET RALEIGH, NORTH CAROLINA 27601
C0NSTRUCVION SVATUS REPORT PAGE ND: 2-047 HARRIS 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-02 C0NSTRUCTION
$TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-00-84 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
09-00-80 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 09-01-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 60%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: mRPV SET: EXCLUDE INTERNALS AND HEAD PACKAGE.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START
$? ART
[DMPLETIQM COMPLETIOM % COMPLETE MOBILIZE AND PREPARE SITE:
01-14-74 01-14-74 01-28-78 01-28-78 100%
PLACE STRUCTURAL CONCRETE:
01-28-78 01-28-78 02-01-84 81%
INSTALL REACTOR PRESSURE VESSEL:n 12-01-79 04-15-80 04-01-80 08-29-80 100%
INSTALL LARGE BORE PROCESS PIPE:
04-01-79 04-01-79 08-01-84 51%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
04-01-79 04-01-79 11-01-83 35%
INSTALL SMALL BORE PIPE:
04-01-79 04-01-79 08-01-84 37%
INSTALL CABLE TRAY:
04-01-79 04-01-79 04-01-84 69%
INSTALL EXPOSED METAL CONDUIT:
04-01-79 04-01-79 04-01-84 70%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
03-01-81 02-26-81 06-01-84 12%
INSTALL ELECTRICAL TERMINATIONS 01-01-82 06-15-81 12-01-84 14%
CONDUCT REACTOR COLD HYDROSTATIC TEST 05-01-84 06-01-84 0%
CONDUCT HOT FUNCTIONAL TEST 08-01-84 10-01-84 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
07-01-82 12-01-84 0%
a
C0NSTRUCTION STA TUS REPORT PAGE NO: 2-048 HARRIS 2 NUCLEAR POWER PL ANTS STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000401 CORPORATE CONTACT:
M.
A. MCDUFFIE. SEN.
V.
PRESIDENT CP NO. 8 DATE ISSUED: CPPR-159/ 01-27-78 ENGINEERING 8 CONSTRUCTION CP EXPIRATION DATE:
06-01-86 CORPORATE ADDRESS:
411 FAYETTEVILLE STREET APPLICANT:
CAROLINA POWER 4 LIGHT RALEIGH. NORTH CAROLINA 27602 PLANT LOCATION:
20 MI SW OF RALEIGH, NC IE REGION:
2 CORPORATE PHONE NO:
(919) 836-6663 AE EBASCO NSSS:
WESTINGHOUSE CONSTRUCTOR:
DANIEL INTERNATIONAL NRC LPM:
E.
A.
LICITRA REACIOR TYPE:
DER (MWE):
0915 IE RESIDENT INSPECTOR:
G.
F. MAXWELL L
IN$PECT ION STA T U St FUEL L0AD DA 1 E CHANGES TIME PERIOD AS REPQRTED BY UT ILITY:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE RFPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
05-07-75 06-01-85 REVISED CURRENT ENERGY AND LOAD FORECAST.
8201 01-19-82 01-22-82 01-00-80 06-01-86 NO REASON REPORTED.
3202 12-20-81 02-20-82 09-08-80 06-01-87 SLOWER RATE GROUTH IN CUSTOMER DEMAND 8204 02-09-82 02-12-82 THAN PROJECTED.
8205 01-20-82 02-20-82 12-16-81 06-01-88 EXPANDED CONSERVATION AND LOAD MANAGEMENT 8206 02-23-82 02-26-82 PROGRAM.
f 8207 03-08-82 03-12-82 i
8209 02-20-82 03-20-82 Inspection reports are avalIable at Iocal PDRs.
l t
J L0 CAL PUBLIC D0CUMENT R 0 0 M:
WAKE COUNTY PUBLIC LIBRARY 104 FAYETTEVILLE STREET RALEIGH, NORTH CAROLINA 27601 i
C0N5TRUCT ION 5TATUS REP 0RT PAGE NO: 2-009 HARRIS 2 NUCLEAR POWER PLAHTS STATUS AS OF:
03-31-82 C0N5TRUCT ION STA T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
06-01-88 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-01-87 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
Ob-01-85 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 03-01-89 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE:
4%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START
$9f*fLElla!!
COMPLETIQ11 % COMPLETE MOBILIZE AND PREPARE SITE:
01-14-74 01-14-74 01-28-78 01-28-78 100%
PLACE STRUCTURAL CONCRETE:
02-01-79 02-01-79 04-01-86 30%
INSTALL REACTOR PRESSURE VESSEL:
09-01-85 01-01-85 0%
INSTALL LARGE BORE PROCESS PIPE:
06-01-79 06-01-79 02-01-87 10%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
07-01-82 02-01-88 0%
INSTALL SMALL BORE PIPE:
06-01-79 06-01-79 02-01-88 3%
INSTALL CABLE TRAY:
04-01-85 10-01-87 0%
INSTALL EXPOSED METAL CONDUIT:
04-01-85 10-01-57 0%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
06-01-85 03-01-88 0%
INSTALL ELECTRICAL TERMINATIONS:
08-01-85 04-01-88 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
11-01-87 12-01-87 0%
CONDUCT HOT FUNCTIONAL TEST:
02-01-88 04-01-88 0%
CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
12-01-86 06-01-88 0%
C0NSTRUCT ION STA TUS REPORY PAGE NO: 2-050 HARTSVILLE A-1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERIST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000518 CORPOPATE CONTACT:
H. G. PARRIS', MANAGER CP NO. 8 DATE ISSUED: CPPR-150/ 05-09-77 0F POWER CP EXPIRATION DATE:
CORPORATE ADDRESS:
500A CHESTNUT STREET TOWER II APPLICANT:
TENNESSEE '/ ALLEY AUTHORITY CHATTANDOGA, IENNESSEE 37401 PLANT LOCATION:
40 MI E OF NASHVILLE, TN IE REGION:
2 CORPORATE ' HONE NO:
(615) 751-2823 AE:
TENNESSEE VALLEY AUTHORITY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
TENNESSEE VALLEY AUTHORITY HRC LPM:
REACTOR TYPE:
DER (MME):
1205 IE RESIDENT INSPECTOR:
W. SWAN I H 5 P E C T I.0 N ST A T U S:
FUEL L0AD DATE CHANGE 5 TIME PERIOD AS REP 0RTED BY U T I L I T Y:
Jan, 1982 - Mar, 1982 REPDPT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE '
SCHEDULE REPOPTED BY UTILITY HUMBER OF INSP.
OF INSP.
07-23-76 10-26-81 SLIPPAGE DUE TO REEVALUATION OF 8201 01-25-82 01-29-82 CONSTRUCTION LCHEDULE STATUS BY TVA.
8202 01-01-82 01-11-82 05-06-77 03-ni-82 DELAY IN ISSUANCE OF LWA PAF.T II, 8203 02-01-82 02-19-82g 09-12-79 02-00-85 NO REASON NOTED..
E204 D3-01-82 03-31-82' 09-10-80 01-00-87 NO REASON REPORTED.
08-14-81 01-00-90 NO REASON REPORTtD.
Inspection rt? orts are available at local PDRs.
s
- s
\\
\\
n w
rf, t
i
\\
t
\\-
S
.N
+
L0CA L PUBLIC DOCUMENT R O O M:
s
\\
s STATE L:13RARY AND ARCHIVES
'k i,,
403 SEVENID AVENUE, NORTH 5
37219
=
NASHVILLE, TENNESSEE
-~
.b g
[
1'
,\\
(
+
s
+
j
{
k-
\\
\\
l 6
1 i
.A 4 i
N'
(
C0N3VRUCTION STATUS R E F 0 R -T
^,
- PAGE NO: 2-031 NARTSVZLLE A-1 NUCLEAR POWER PLANTS',i ST9TUS AS OF:
03-31-02 C0NSTRUCTION STATUS APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
01-01-90
'APPLICAhTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
01-00-87 DEFINED IN CP: (EARLIEST) 06-00-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
06-00-81
\\'
(LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-00-90 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 44%
s
.Y COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITN OPTION TO RES' TART AS NECESSARY.
%k E
I 4
\\
\\
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION
[DMPLETIOS % COMPLETE MOBILIZE AND PREPARE SITE:
04-22-76 08-31-76 100%
PLACE STRUCTURAL CONCRETE:
08-15-77 12-18-85 81%
INSTALL REACTOR PRESSURE VESSEL:
12-17-79 02-28-80 100%
INSTALL LARGE BORE PROCESS PIPE:
08-27-79 10-08-87 35%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
08-01-79 11-08-87 17%
INSTALL SMALL BORE PIPE:
11-02-79 11-08-87 13%
INSTALL CABLE TRAY:
06-08-79 09-15-89 36%
INSTALL EXPOSED METAL CONDUIT:
03-24-80 01-23-87 4%
j INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
03-21-86 09-15-89 0%
l INSTALL ELECTRICAL TERMINATIONS:
05-10-86 09-28-89 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
01-06-89 01-20-89 0%
I CONDUCT HOT FUNCTIONAL TEST:
N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
12-18-87 01-00-90 0%
4
)
d t
I i
j
_ ~ _ _ - _.
C0NSTRUCTION STATUS REPQRT PAGE NO: 2-052 HARTSVILLE A-2 NUCLEA R POMER PLANT 5 STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET HQ:
05000519 CORPORATE CONTACT:
H. G. PARRIS, MANAGER CP NO. 1 DATE ISSUED:
CPPR-151/ 05-09-77 0F POWER CP EXPIRATION DATE:
CORPORATE ADDRESS:
500A CHESTNUT STREET TOWER II APPLICANT:
TENNESSEE VALLEY AUTHORITY CHATTAN00GA, TENNESSEE 37401 4
PLANT LOCATION:
40 MI E OF NASHVILLE, TN i
IE REGIGH:
2 CORPORATE PHONE NO:
(615) 751-2823 AE:
TENNESSEE VALLEY AUTHORITY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
TENNLSSEE VALLEY AUTHORITY NRC LPM:
REACTOR TYPE:
i DER (MWE):
1205 IE RESIDENT INSPECTOR:
W.
SWAN i
INSPECT ION S T A T U S:
FUEL L0AD DA TE CHANGE 5 TIME PERIOD AS REPQRTED BY UTILITY:
)*
REPORT NEW REASON FOR CHANGE Jan, 1982 - Mar, 1982 t
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NyMBER OF INSP, OF THSP.
07-23-76 10-26-82 SLIPPAGE DUE TO REEVALUATION OF 3201 01-25-82 01-29-82 CONSTRUCTION SCHEDULE STATUS BY TVA.
8202 01-01-82 01-11-82 05-06-77 03-01-83 DELAY IN ISSUANCE OF LWA PART II.
8203 02-01-82 02-19-82 09-12-79 02-00-86 NO REASON NOTED.
8204 03-01-82 03-31-82 09-10-80 10-00-87 NO REASON PROVIDED.
08-14-81 01-00-91 NO REASON PROVIDED.
Inspection reports are available at local PDRs.
1 i
i l
4 i
L0 CAL PUBL IC D0CUMENT R 0 0 M:
STATE LIBRARY AND ARCHIVES 403 SEVENTH AVENUE, NORTH NASHVILLE, TENNESSEE 37219 i
I
C0N5TRUCT ION STA TUS REPQRT PAGE NO: 2-053 HARTSVILLE A-2 NUCL EAR POWER PLA NTS STATUS *AS OF:
05-31-02 C0N5TRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
01-01-91 APPLICANTS CONSTRUCTION COMPLETI0H ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-87 DEFINED IN CP: (EARLIEST) 06-00-82 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
06-00-82 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-00-91 CURRENT ESTIMATED PERCEN1 CONSTRUCTION COMPLETE: 34%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITH OPTION TO RESTART AS NECESSARY.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
04-22-76 05-31-77 100%
PLACE STRUCTURAL CONCRETE:
05-15-78 02-03-87 06-14-79 66%
INSTALL REACTOR PRESSURE VESSEL:
12-18-80 03-26-81 100%
INSTALL LARGE BORE PROCESS PIPE:
12-28-79 01-02-89 24%
INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:
05-19-80 01-30-89 4%
INSTALL SMALL BORE PIPE:
07-18-80 01-30-89 4%
INSTALL CABLE TRAY:
01-09-81 06-14-90 6%
INSTALL EXPOSED METAL CONDUIT:
01-25-83 02-25-88 0%
INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-03-87 G4-27-90 0%
INSTALL ELECTRICAL TERMINATIONS:
05-15-87 05-08-90 0%
CONDUCT REACTOR COLD NYDR0 STATIC TEST:
04-06-90 04-20-90 0%
CONDUCT NOT FUNCTIONAL TEST:
N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
09-28-88 01-01-91 0%
C0NSTRUCTION STA TUS REPORT PAGE NO: 2-054 HARTSVILLE B-1 NUCL EAR POWER PLANTS STATUS AS OF:
03-11-82 PLANT CHARACT E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
05000520 CORPORATE CONTACT:
G. KIMMONS, MANAGER CP NO. & 9 ATE ISSUED: CPPR-152/ 05-09-77 0FFICE OF ENG. 8 CONSTRUCTION CP EXPIRATION DATE:
CORPORATE ADDRESS:
400 COMMERCE AVENUE APPLICANT:
TENNESSEE VALLEY AUTHORITY KNOXVILLE, TENNESSEE 37902 PLANT LOCATION:
40 MI E OF NASHVILLE, TN IE REGION:
2 CORPORATE PHONE NO:
(615) 632-2911 AE:
TENNESSEE VALLEY AUTHORITY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
TENNESSEE VALLEY AUTHORITY NRC LPM:
REACTOR TYPE:
DER (MWE):
1205 IE RESIDENT INSPECTOR:
W. SWAN IN SPECTION S T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY UTILITY Jan. 1982 - Mar. 1912 i
REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
07-23-76 04-2*-82 SLIPPAGE DUE TO REEVALUATION OF 8201 01-25-82 01-29-82 CONSTRUCTION SCHEDULE STATUS BY TVA.
8202 01-01-82 01-11-82 05-06-77 09-01-82 DELAY IN ISSUANCE OF LWA PART II, 8203 02-01-82 02-19-82 09-12-79 03-00-88 NO REASON NOTED.
I' 8204 03-01-82 03-31-82 09-10-80 07-00-94 NO REASON PROVIDED.
j 09-30-81 N/S DEFERRED.
Inspection reports are avalIable at local PDRs.
I l
i L0 CAL PUBLIC D0CUMENT R 0 0 M:
STATE LIBRARY AND ARCHIVES 403 SEVENTH AVENUE, NORTH NASHVfLLE, TENNESSEE 37219
= - -
=- -
C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-055 HAR730ZLLE B-1 NUCLEAR P0WER PLANVS STATUS AS OF:
03-31-02 C0NSTRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DAIE:
07-00-94 DEFINED IN CP: (EARLIEST) 06-00-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
12-00-81 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 17%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITH OPTION TO RESTART AS HECESSARY.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
04-22-76 03-31-77 100%
PLACE STRUCTURAL COHCRETE:
09-29-77 INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
IHSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATI0HS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
C0NSTRUCT ION
$TATUS REPQRT PAGE NO: 2-056 HARTSVILLE B-2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET ND:
05000521 CORPORATE CONTACT:
G. KIMMONS, MANAGER CP NO. 8 DATE ISSUED: CPPR-153/ 05-09-77 0FFICE OF ENG. 8 CONSTRUCTION CP EXPIRATION DATE:
CORPORATE ADDRESS:
400 COMMERCE AVENUE APPLICANT:
TENNESSEE VALLEY AUTHORITY KNOXVILLE, TENNESSEE 37902 PLANT LOCATION:
40 MI E OF NASHVILLE. TN IE REGION:
2 CORPORATE PHONE NO:
(615) 632-2911 AE:
TENNESSEE VALLEY AUTHORITY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
TENNESSEE VALLEY AUTHORITY NRC LPM:
REACTOR TYPE:
DER (MWE):
1205 IE RESIDENT INSPECTOR:
W. SWAN IN$PECTION S T A T U 5:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UT I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE LHD DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
07-23-76 04-26-83 SLIPPAGE DUE TO REEVALUATION OF 8201 01-25-82 01-29-82 CONSTRUCTIDH SCHEDULE STATUS BY TVA.
i I
8202 01-01-82 01-11-82 05-06-77 09-01-83 DELAY IN ISSUANCE OF LWA PART II.
8203 02-01-82 02-19-82 09-12-79 03-00-89 NO REASON NOTED.
8204 03-01-82 03-31-82 09-10-80 07-00-95 NO REASON PROVIDED.
09-30-81 N/$
DEFERRED.
Inspection reports are available at local PDRs.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
STATE LIBRARY AND ARCHIVES 403 SEVENTH AVENUE, NORTH NASHVILLE, TENNESSEE 37219
C0NSTRUCVION STATUS REP 0RT PAGE NO: 2-057' HARTSVILLE B-2 NUCLEAR POWER PLANTS STAVUS AS OF:
03-31-82 C0NSTRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:
N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
07-00-95 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
12-00-82 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL CPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
7%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITH OPTION TO RESTART AS NECESSARY.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETIqd ggMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
04-22-76 03-31-77 100%
PLACE STRUCTURAL CONCRETE:
09-29-77 INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
C0NSTRUCTION
$TATUS REPQRT PAGE NO: 2-058 NOPE CREEK 1 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 PLANT CHA RACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000354 CORPORATE CONTACT:
T.
J. MARTIN. VICE PRESIDENT CP NO. & DATE ISSUED: CPPR-120/ 11-04-74 ENGINEERING 8 CONSTRUCTION CP EXPIRATION DATE:
12-31-86 CORPORATE ADDRESS:
80 PARK PLAZA APPLICANT:
PUBLIC SERVICE ELECTRIC 3 GAS NEWARK, NEW JERSEY 07101 PLANT LOCATION:
18 MI SE OF WILMINGTON. DEL IE REGION:
1 CORPORATE PHONE NO (201) 430-8316 AE BECHTEL NS$$:
GENERAL ELECTRIC CONSTRUCTOR:
BECHTEL NRC LPM:
R. GILBERT REACTOR TYPE:
DER (MWE):
1067 IE RESIDENT INSPECTOR:
W. N. BATEMAN IN5PECT ION 5TA T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITYi Jan. 1932 - Mar, 1982 REPORT NEW REASON FOR CHANGE l
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY j
NUMBER OF INSP.
OF IN1P u 04-00-75 06-00-82 DELAY IN OBTAINING STATE OF NEW JERSEY 82-01 01-04-82 01-31-82 COASTAL AREAS FACILITY PERMIT.
82-02 01-18-82 01-22-82 05-00-76 12-00-82 REEVALUATION OF DEALY CAUSED BY H. J.
82-03 02-01-82 02-28-82 COASTAL AREAS FACILITY PERMIT.
82-04 03-01-82 04-04-82 10-00-76 11-00-83 RE-EXAMINATION OF THE EFFORT REQUIRED TO CONSTRUCT THE PLANT.
02-00-80 11-00-84 NO REASON GIVEN.
08-00-80 06-00-86 LOWER THAN ANTICIPATED ELECTRICITY SALES Inspection Reports are available at local PDRs.
GROWTH. CONTINUED INFLATION. AND RECESSIONARY TRENDS IN ECONOMY.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
SALEM FREE PUBLIC LIBRARY 112 WEST BROADWAY SALEM. NEW JERSEY 08079
C0NSTRUCT20N STATUS REPQRT PAGE NO: 2-059 NOPE CREEK 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 C0NSTRUCTION 5 T A T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
06-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-00-84 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
06-00-81 (LATEST) 12-31-86 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 12-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 46%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
- REACTOR BUILDING FOUNDATIDH TO RPV PEDESTAL.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START CQMPLETION COMPLETIRE % COMPLETE MOBILIZE AND PREPARE SITE:
02-00-76 03-00-76 08-00-77 08-00-77 100%
PLACE STRUCTURAL CONCRETE:*
07-00-77 08-00-77 10-00-79 09-00-79 100%
INSTALL REACTOR PRESSURE VESSEL:
11-00-80 11-00-80 12-00-80 12-00-80 i00%
INSTALL LARGE BORE PROCESS PIPE:
04-00-79 04-00-79 10-00-84 53%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
04-00-79 04-00-79 10-00-84 20%
INSTALL SMALL BORE PIPE:
12-00-81 07-00-81 08-00-85 2%
INSTALL CABLE TRAY:
08-00-79 b8-00-79 07-00-84 34%
INSTALL EXPOSED METAL CONDUIT:
09-00-81 05-00-81 04-00-85 5%
INSTALL POWER, CONTROL, INSTRUMENTATIGN AND SEC R.
(
LE:
02-00-83 04-00-85 0%
INSTALL ELECTRICAL TERMINATIONS:
03-00-83 05-00-85 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
01-00-86 01-00-86 0%
CONDUCT HOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
03-00-86 06-00-86 0%
C0NSTRUCT ION STA TUS 2EPORT PAGE NO: 2-060 LASALLE 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PL ANT C H A R A C T E R I S T I C 5:
KE" P E R S 0 N N E L:
DOCKET ND:
05000373 CORPORATE CONTACT:
B.
LEE, JR., VICE PRESIDENT CP HO. 8 DATE ISSUED:
CPPR-99 / 09-10-73 CP EXPIRATION DATE:
03-31-80 CORPORATE ADDRESS:
P.
O. BOX 767 A PP L IC A:4 T :
COMMONWEALTH EDISON CHICAGO, ILLINDIS 60690 PLANT LOCATION:
11 MI SE OF OTTAWA, ILL IE REGION:
3 CORPORATE PHONE NO:
(312) 294-3103 AE:
SARGENT 8 LUNDY HSSS:
GENERAL ELECTRIC CONSTRUCTOR:
COMMONWEALTH EDISDN NRC LPM:
A.
BOURNIA REACTOR TYPE:
H.
WESCOTT DER (MWE):
1078 IE RESIDENT INSPECTOR:
R. WALKER INSPECT ION S T A T U S:
FUEL L0AD DA T E CHANGES TIME PERIOD AS REPQRTED BY UTIL I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
04-01-76 LICENSING DELAYS.
8046 02-22-80 07-16-80 05-01-77 LICENSING DELAYS /PUBLIC HEARINGS.
8143 11-09-81 12-04-81 08-01-78 PUBLIC HEARINGS.
8144 12-22-81 01-29-82 08-03-76 11-00-78 CONTAINMENT DESIGN REVISIONS.
8145 12-08-81 12-30-81 04-20-77 03-00-79 REASSESSMENT OF CONSTRUCTION SCHEDULE 8147 12-08-81 12-11-81 STATUS.
8148 12-01-81 01-13-82 05-04-79 07-01-79 INCORPORATION OF KWU QUENCHER INTO PLANT 8149 12-02-81 12-15-81 DESIGN.
3150 11-16-81 12-31-81 09-24-79 06-00-80 DESIGN DELAYS AND CONSTRUCTION DELAYS 8151 12-22-81 12-22-81 CAUSED BY COMPLEXITY OF INCLUDING MARK II 8152 12-09-81 01-15-82 CONTAINMENT HYDRODYNAMIC LOADS.
8201 01-04-82 01-09-82 05-14-80 09-00-80 NO REASON PROVIDED.
5202 01-05-82 01-20-82 09-15-80 12-00-80 NO REASON PROVIDED.
8203 01-14-82 01-15-82 01-14-81 05-00-81 NO PEASON PROVIDED.
8204 01-26-82 02-12-82 09-30-81 12-00-81 DESIGN AND CONSTRUCTION DELAYS TO INSTALL 8206 01-04-82 02-05-82 REDESIGNED PIPE SUPPCRTS AND TO INCLUDE 8207 03-12-82 03-12-82 CHANGES FOR REVISED LOADS.
8209 02-16-82 02-17-82 12-31-81 03-15-82 ADDITIONAL TIME IS REQUIRED TO COMPLETE 8212 02-08-82 03-12-82 PREOPERATIONAL TESTS, CLEAN NRC OPEN ITEMS AND CLOSE OUTSTANDING DEFICIENCIES.
Inspection Reports are available at local PDRs.
03-31-82 04-15-82 LICENSING DELAY FOR FUEL LOADING.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
ILLINDIS VALLEY COMMUNIIY COLLEGE RURAL ROUTE NO. 1 CGLESBY. ILLINDIS 16348
~
~ ~ -.
C0NSTRUCYZ0N SToTUS REP 0RY PAGE NO: 2-061 i
LASALLE 1 NUCLEA2 POWER PLANTS STATUS AS OF:
03-31-82 C0NSTRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-1S-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
03-1S-82 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
03-01-75 (LATEST) 04-30-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 08-31-82 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 99%
CCMMENTS REGARDING CURRENT CONSTRUCTION STATUS: MINOR REPLACEMENTS / CHANGES IS THE ONLY REMAINING PART OF CONSTRUCTION.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
10-00-73 06-00-74 100%
PLACE STRUCTURAL CONCRETE:
06-00-74 09-00-76 100%
INSTALL REACTOR PRESSURE VESSEL:
09-00-76 10-00-76 100%
INSTALL LARGE BORE PROCESS PIPE:
11-00-76 07-00-78 100%
INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SHUBBERS:
03-00-76 01-00-82 01-00-82 100%
INSTALL SMALL BORE PIPE:
03-00-76 12-00-81 12-00-81 100%
INSTALL CABLE TRAY:
02-00-76 09-00-80 100%
INSTALL EXPOSED METAL CONDUIT:
02-00-76 09-00-81 100%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
01-00-77 01-00-82 02-00-82 100%
INSTALL ELECTRICAL TERMINATIONS:
01-00-77 01-00-82 02-00-82 100%
CONDUCT REACTOR COLD NYDR0 STATIC TEST:
11-00-80 11-00-80 100%
CONDUCT NOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
05-00-77 03-00-82 03-00-82 100%
a 8
3 C0NSTRUCTION STATUS REPORV PAGE NO: 2-062 LASALLE 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
05000374 CORPORATE CONTACT:
B. LEE, JR., VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-100/ 09-10-73 CP EXPIRATION DATE:
12-31-80 CORPORATE ADDRESS:
P. O. BOX 767 APPLICANT:
COMMONWEALTH EDISDN CHICAGG, ILLINDIS 60690 PLANT LOCATION:
11 MI SE OF OTTAWA. ILL IE REGION:
3 CORPORATE PHONE NO:
(312) 294-3103 AE:
SARGENT 8 LUNDY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
COMMONWEALTH EDISON NRC LPM:
A. BOURNIA REACTOR TYPE:
H. WESCOTT DER (MWE):
1078 IE RESIDENT INSPECTOR:
R. WALKER INSPECTION S T A T U S:
FG EL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY U T I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
09-01-76 LICENSING DELAYS.
8121 12-02-81 12-15-81 10-01-77 LICENSING DELAYS /PUBLIC HEARINGS.
8122 12-09-81 01-15-82 10-15-73 01-01-79 PUBLIC HEARINGS.
8201 01-04-82 01-05-82 10-17-74 06-01-79 ECONOMIC REASONS.
04-20-77 03-00-80 REASSESSMENT OF CONSTRUCTION SCHEDULE Inspection Reports are available at local PDRs.
STATUS.
09-24-79 06-00-81 DESIGN DELAYS AND CONSTRUCTION DELAYS CAUSED BY COMPLEXITY OF INCLUDING MARK II CONTAINMENT HYDRODYNAMIC LOADS.
05-14-80 12-08-81 NO REASON PROVIDED.
01-14-81 05-00-82 NO REASON PROVIDED.
09-30-81 12-00-82 FOCUS OH UNIT 1 ALTERATIONS WHICH REFLECT ON UNIT 2 INSTALLATION.
03-31-82 04-30-83 FOCUS ON UNIT 1 ALTERATIONS WHICH REFLECT ON UNIT 2 INSTALLATION.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
ILLINDIS VALLEY COMMUNITY COLLEGE RURAL ROUTE NO. 1 OGLESBY, ILLINDIS 16348
C0N5TRUCT80N SYAYUS R E,P O R T PAGE NO: 2-063 LASALLE a NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 C0N$TRUCTION 5 T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-30-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-00-82 DEFINED IN CP (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUARCE:
08-01-75 (LATEST) 03-31-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-31-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 85%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 1 TART COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
10-00-73 07-00-74 100%
PLACE STRUCTURAL CONCRETE:
07-00-74 09-00-76 100%
INSTALL REACTOR PRESSURE VESSEL:
11-00-76 11-00-76 100%
INSTALL LARGE BORE PROCESS PIPE:
11-00-76 02-00-82 03-00-82 100%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
01-00-77 11-00-82 50%
INSTALL SMALL BORE PIPE:
11-00-76 06-00-82 92%
INSTALL CABLE TRAY:
09-00-77 01-00-82 99%
INSTALL EXPOSED METAL CONDUIT:
01-00-77 09-00-82 83%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-00-78 10-00-82 90%
INSTALL ELECTRICAL TERMINATIONS:
02-00-78 10-00-82 76%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
08-00-82 08-00-82 0%
CD'NDUCT NOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
05-00-82 04-00-83 0%
___m i
t C0N5TRUCTION
$TATUS REP 0RT PAGE NO: 2-044 LIMERICK 1 NUCLEAR P0WER Ps ANTS STATUS AS OF:
03-31-82 PLAHT CHARACTERISTICSt KEY PERSONNEL:
DOCKET NO:
05000352 CORPORATE CONTACT:
V.
S.
BOYER. SENIOR VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-106/ 06-19-74 NUCLEAR POWER CP EXPIRATION DATE:
10-01-85 CORPORATE ADDRESS:
PHILADELPHIA ELECTRIC COMPANY j
APPLICANT:
PHILADELPHIA ELECTRIC 2301 MARKET STREET PLANT LOCATION:
35 MI HW OF PHILADELPHIA, PA PHILADELPHIA, PENNSYLVANIA 19101 4
IE REGION:
1 CORPORATE PHONE NO:
(215) 841-4500 AE:
BECHTEL 1
NSSS:
CONSTRUCTOR:
BECHTEL NRC LPM:
H. ABELSON REACTOR TYPE:
1 DER (MWE):
1065 IE RESIDENT INSPECTOR:
J. P.
DURR i
i
)
INSPECTION S T A T U S:
FUEL L0AD DATE CHANGES e
TIME PERIOD AS REPORTED BY U T I L I T Y:
l Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.
OF INSP.
3 09-27-74 10-01-80 DELAY ENTIRELY ATTRIBUTABLE TO FINANCING 82-01 08-28-81 01-21-82 PROBLEMS.
82-02 01-26-82 02-02-82 10-15-75 08-01-80 SCHEDULE REFINEMENT AND BUDGET 82-03 01-11-82 01-29-82 ADJUSTMENTS.
j 82-04 02-01-82 02-23-82 05-24-76 10-01-82 HIGHER CAPITAL COSTS AND LOWER THAN l
i 82-05 03-01-82 03-30-82 EXPECTED DEMAND FOR ELECTRICITY.
i 82-06 03-15-82 04-23-82 09-23-80 10-00-83 INCREASE OF SCOPE DUE TO DESIGN CHANGES i
8 NEW REGULATORY REQUIREMENTS. DESIGN PROBLEMS ASSOCIATED W/ MARK II CONTAINMENT, REFINEMENT OF ESTIMATES. AND LIMITS ON Inspection Reports are available at local PDRs.
YEARLY CAPITAL AVAILABLE.
L l
02-20-81 10-00-84 REFINEMENT OF MANHOUR ESTIMATES AND 3
DURATIONS REQUIRED TO COMPLETE i
REMAINING ENGINEERING AND FIELD WORK.
7
)
7 L0 CAL PUBLIC D0CUMENT R 0 0 M:
POTTSTOWN PUBLIC LIBRARY
]
500 HIGH STREET POTTSTOWN. PENNSYLVANIA 19464 4
i
C0NSTRUCTION STATUS REPORT PAGE NO: 3-065 LIMERIC% 1 NUCLEAR POWER PLANVS STATUS AS OF 03-31-82 C0NSTRUCTION STA T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
10-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-83 DEFINED IN CP: (EARLIEST) 10-00-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
04-00-79 (LATEST) 10-00-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 04-01-85 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE: 72%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: WE CONTINUE TO REPORT THE OVERALL COMPLETION PERCENTAGES BASED ON ON* TOTAL SCOPE AND MANHOUR EXPENDITURES.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMAT'ED START START COMPLETI04 COMPLETIDM % COMPLETE MOBILIZE AND PREPARE SITE:
05-00-70 05-00-70 09-00-74 09-00-74 100%
PLACE STRUCTURAL CONCRETE:
07-00-74 07-00-74 11-00-80 11-00-80 100%
INSTALL REACTOR PRESSURE VESSEL:
11-00-76 11-00-76 12-00-76 12-00-76 100%
INSTALL LARGE BORE PROCESS PIPE:
01-00-76 01-00-76 02-00-83 93%
INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SHUBBERS:
01-00-76 01-00-76 04-00-83 79%
INSTALL SMALL BORE PIPE:
01-00-77 01-00-77 06-00-83 74%
INSTALL CABLE TRAY:
01-00-76 01-00-76 02-00-83 100%
INSTALL EXPOSED METAL CONDUIT:
02-00-76 02-00-76 11-00-83 70%
IHSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
01-00-81 01-00-81 01-00-84 40%
INSTALL ELECTRICAL TERMINATIONS:
01-00-81 01-00-81 03-00-84 33%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
11 00-83 11-00-83 0%
CONDUCT HOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
07-00-82 10-00-84 0%
C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-066 LIMERICK 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
05000353 CORPORATE CONTACT:
V. S. BOYER, SENIOR VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-107/ 06-19-74 NUCLEAR POWER CP EXPIRATION DATE:
10-01-87 CORPORATE ADDRESS:
PHILADELPHIA ELECTRIC COMPANY APPLICANT:
PHILADELPHIA ELECTRIC 2301 MARKET STREET PLANT LOCATION:
35 MI NW OF PHILADELPHIA, PA PHILADELPHIA, PENNSYLVANIA 19101 IE REGION:
1 CORPORATE PH0;'E NO:
(215) 841-4500 AE:
BECHTEL NSSS GENERAL ELECTRIC CONSTRUCTOR:
BECHTEL NRC LPM:
H. ABELSON REACTOR TYPE:
DER (MWE):
1065 IE RESIDENT INSPECTOR:
J. P. DURR INSPECTION S T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY U T I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
09-27-74 10-01-81 DELAY ENTIRELY ATTRIBUTABLE TO FINANCING 82-01 01-26-82 02-02-82 PROBLEMS.
82-02 01-11-82 01-29-82 10-15-75 01-01-82 SCHEDULE REFINEMENT AND BUDGET 82-03 02-01-82 02-28-82 ADJUSTMENTS.
82-04 03-01-82 03-30-82 05-24-76 10-01-84 HIGHER CAPITAL COSTS AND LOWER THAN EXPECTED DEMAND FOR ELECTRICITY.
09-23-80 10-00-86 INCREASE OF SCOPE DUE TO DESIGN CHANGES 8 NEW REGULATORY REQUIREMENTS, DESIGN Inspection Reports are available at Iocal PDRs.
PROBLEMS ASSOCIATED W/ MARK II CONTAINMENT, REFINEMENT OF ESTIMATES AND LIMITS ON YEARLY GAPITAL AVAILABLE.
02-20-81 04-00-87 REFINEf. PT OF NANHOUR ESTIMATES AND DURATIONS R50UIRED TO COMPLETE REMAINING ENGINEERING AND FIELD WORK.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
POTTSTOWN PUBLIC LIBRARY 500 HIGH STREET PDTTSTOWN, PENNSYLVANIA 19464
C0NSTRUCTY0N STATUS REP 0RT PAGE NO: 2-067 LIMERICK 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 C0NSTRUCTION 5TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-00-87 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-86 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
09-00-80 (LATEST)
APPLICAHT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 04-00-87 CURREHT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 30%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: WE CONTINUE TO REPORT OVERALL COMPLETION PERCENTAGES BASED ON TOTAL SCOPE AND MANHCUR EXPENDITURES.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION
[DMPLETION $_[QMPLETE MOBILIZE AND PREPARE SITE:
05-00-70 05-00-70 09-00-74 09-00-74 100%
PLACE STRUCTURAL CONCRETE:
09-00-74 09-00-74 11-00-80 11-00-80 100%
INSTALL REACTOR PRESSURE VESSEL:
09-00-77 09-00-77 10-00-77 10-00-77 100%
INSTALL LARGE BORE PROCESS PIPE:
01-00-76 01-00-76 04-00-85 21%
l INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
01-00-76 01-00-76 12-00-84 15%
INSTALL SMALL BORE PIPE:
01-00-78 01-00-78 01-00-85 4%
INSTALL CABLE TRAY:
06-00-78 06-00-78 06-00-85 11%
INSTALL EXPOSED METAL CONDUIT:
12-00-82 04-00-86 0%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
01-00-84 09-00-86 0%
INSTALL ELECTRICAL TERMINATI0HS:
03-00-84 11-00-86 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
05-00-86 05-00-86 0%
CONDUCT HOT FUNCTIDHAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
08-00-85 04-00-87
.- -. _. - _ ~..
C0NSTRUCTION STATUS REPORT PAGE NO: 2-068 MARBLE NILL 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 j
PLANT C N A R A C T E R I S T I C S:
KEY PERSOHNEL DOCKET N3:
05000546 CORPORATE CONTACT:
S. W. SHIELDS. SEN. VICE PPESIDENT CP HO. 8 DATE ISSUED: CPPR-170/ 04-04-78 NUCLEAR DIVISION CP EXPIRATION DATE:
01-01-84 CORPORATE ADDRESS:
P. O.
BOX 190 APPLICANT:
PUBLIC SERVICE OF INDIANA NEW WASHINGTON, IN 47162 PLANT LOCATION:
10 MI S OF MADISON, IN IE REGION:
3 CORPORATE PHONE NO:
(812) 289-1000 i
AE:
SARGENT 4 LUNDY NSSS:
CONSTRUCTOR:
PUBLIC SERVICE Or INDIANA HRC LPM:
E. L. DOOLITTLE REACTOR TYPE:
P. PELKE DER (MWE):
1130 IE RESIDENT INSPECTOR:
J. J. HARRISON, JR.
i l
INSPECTION S T A T U S:
FUEL L0AD DATE CHANGES l
TIME PERIOD AS REP 0RTED BY U T I L I T Y:
Jan, 1982 - Mar. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.
OF INSP.
}
08-00-80 06-00-86 NO REASON PROVIDED.
1 8121 11-01-81 11-30-81 1
8123 12-08-81 12-10-81 l
8124 12-01-81 12-31-81 1
8201 01-01-82 01-31-82 j
8202 02-01-82 02-28-82 i
8203 02-19-82 02-19-82 l
8204 03-02-82 03-05-82 Inspection Reports are available at local PDRs.
1 l
i i
d I
i i
L0 CAL PUBLIC D0CUMENT R 0 0 M:
i 4
MADISDN-JEFFERSON COUNTY i
PUBLIC LIBRARY 420 WEST MAIN STREET j
MADISON, INDIANA 47250
}
(
1
CDN5TRUCT ION 5TATUS REPORT PAGE NO: 2-069 MARBLE HILL 1 NUCLEAR POWER PLANVS SVATUS AS OF:
03-31-82 C0NSTRUCTION 5TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
06-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
04-00-82 nEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
04-00-82 (LATEST) 01-01-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 12-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 35%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: THE ABOVE NUMBER APPROXIMATES THE PERCENT MANNOURS CONSUMED. IT DOES NOT NECESSARILY INDICATE THE PHYSICAL COMPLETION OF THE PROJECT OR f
COMPLETION STATUS. STATUS AS OF 05-28-82.
1 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
08-00-77 06-00-86 85%
PLACE STRUCTURAL CONCRETE:
01-00-78 12-00-85 73%
INSTALL REACTOR PRESSURE VESSEL:
10-00-82 11-00-84 0%
INSTALL LARGE BORE PROCESS PIPE:
01-00-79 01-00-86 37%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
01-00-79 01-00-86 18%
INSTALL SMALL BORE PIPE:
02-00-80 03-00-86 9%
INSTALL CABLE TRAY:
04-00-80 03-00-85 37%
INSTALL EXPOSED METAL CONDUIT:
04-00-80 10-00-85 13%
INSTALL POWER, CONTROL, INSTRUMENTATIDH AND SECURITY CABLE:
01-00-82 12-00-85 1%
INSTALL ELECTRICAL TERMINATIONS:
01-00-82 03-00-86 1%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
08-00-85 08-00-85 0%
l CONDUCT HOT FUNCTIONAL TEST:
02-00-86 03-00-86 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
01-00-85 06-00-86 0%
l l
C0NSTRUCVION 5TATUS REPORT PAGE NO: 2-070 MARBLE HILL 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I 5 T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000547 CORPORATE CONTACT:
S. W.
SHIELDS. SEN. VICE PRESIDENT CP NO. 1 DATE ISSUED: CPPR-171/ 04-04-78 NUCLEAR DIVISION CP EXPIRATION DATE:
01-01-86 CORPORATE ADDRESS:
P. O. BOX 190 APPLICANT:
PUBLIC SERVICE OF INDIANA NEW WASHINGTON, IN 47162 t'LANT LOCATIGH:
10 MI S OF MADISON, IN IE REGION:
3 CORPORATE PHONE NO:
(812) 289-1000 AE:
SARGENT 8 LUNDY NSSS:
WESTINGHOUSE CONSTRUCTOR:
PUBLIC SERVICE OF INDIANA NRC LPM:
E. L. DOOLITTLE REACTOR TYPE:
P. PELKE DER (MWE):
1130 IE RESIDENT INSPECTOR:
J.
J. HARRISON, JR.
INSPECTION 5 T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY
- Jan. 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
08-00-80 06-00-87 NO REASON PROVIDED.
8121 11-01-81 11-30-81 8123 12-08-81 12-10-81 8124 12-01-81 12-31-81 8201 01-01-82 01-31-82 8202 02-01-82 02-28-82 8203 02-19-82 02-19-82 8204 03-02-82 03-05-82 Inspection Reports are available at Iccal PDRs.
L0CA L PUBLIC D0CUMENT R 0 0 M:
MADISDN-JEFFERSON COUNTY PUBLIC LIBRARY 420 WEST MAIN STREET MADISON, INDIANA 47250
C0NSTRUC7 ION STATUS REP 0RT PAGE NO: 2-071 MARBLE NILL 2 NUCLEAR P0WER ' PLANTS SVATUS AS OF:
@3-31-82 C0N5TRUCTION S T A T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
06-00-87 APPLICANTS CONSTRUCTION COM.'LETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
07-00-83 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
07-00-83 (LATEST) 01-01-86 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 12-00-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
17%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: THE ABOVE NUMBER APPROXIMATES THE PERCENT MANHOURS CONSUMED. IT DOES NOT NECESSARILY INDICATE THE PHYSICAL COMPLETION OF THE PROJECT OR COMPLETION STATUS. STATUS AS OF 05-28-82.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START
[DMPLETION COMPLETI1N % COMPLETE MOBILIZE AND PREPARE SITE:
12-00-77 06-00-86 85%
PLACE STRUCTURAL CONCRETE:
03-00-78 12-00-86 71%
INSTALL REACTOR PRESSURE VESSEL:
09-00-83 03-00-86 0%
INSTALL LARGE BORE PROCESS PIPE:
05-00-79 12-00-86 19%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
05-00-79 12-00-86 20%
INSTALL SMALL BORE PIPE:
05-00-80 03-00-87 2%
INSTALL CABLE TRAY:
06-00-81 12-00-85 26%
l INSTALL EXPOSED METAL CONDUIT:
10-00-81 03-00-86 1%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
09-00-83 12-00-86 0%
INSTALL ELECTRICAL TERMINATIONS:
03-00-84 03-00-87 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
08-00-86 08-00-86 0%
CONDUCT NOT FUNCTIONAL TEST 02-00-87 02-00-87 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
01-00-86 06-00-87 0%
l
C0NSTRUCTION STAYU$
REPORT PAGE NO: 2-072 MCGUIRE 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000370 CORPORATE CONTACT:
W. H. OWEN, SR. VICE PRESIDENT CP NO. 3 DATE ISSUED: CPPR-84 / 02-23-73 DESIGN & CONST., DUKE POWER CD.
CP EXPIRATION DATE:
03-01-77 CORPORATE ADDRESS:
PB 3032, 422 S. CHURCH STREET APPLICANT:
DUKE POWER CHARLOTTE, NORTH CAROLINA 28242 PLANT LOCATION:
17 MI N OF CHARLOTTE, NC IE REGION:
2 CORPORATE PHONE NO:
(704) 373-4120 AE:
DUKE POWER NS$$:
WESTINGHOUSE CONSTRUCTOR:
DUKE POWER NRC LPM:
R. BIRKEL REACTOR TYPE:
DER (MWE):
1180 IE RESIDENT INSPECTOR:
M. GRAHAM INSPECTION S T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY U T I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
05-01-77 INITIALLY DELAYED IN RECEIVING CONSTRUCT-8201 01-11-82 01-15-82 ION PERMIT. CONSTRUCTION DELAYED BY 8202 01-05-82 01-08-82 INCREASED DELIVERY TIME OF MATERIAL AND 8203 02-16-82 02-16-82 COMPONENTS.
07-26-74 12-15-77 CONSTRUCTION DELAYED BY INCREASED Inspection reports are available at local PDRs.
DELIVERY TIME OF MATERIAL AND COMPONENTS.
09-27-74 08-00-78 CONSTT"CTION DELAYS DUE TO CRITICAL CONDIT13NS EXISTING IN THE FINANCIAL MARKETS.
04-21-76 09-15-78 NO REASON GIVEN BY THE UTILITY.
l 04-18-77 08-00-79 CONSTRUCTION DELAY.
08-16-77 N/S LATE EQUIPMENT DELIVERIES. DESIGH MODIFICATIONS 09-20-77 10-10-80 DUE TO CHANGED REGULATORY REQUIREMENTS.
08-13-79 01-00-82 NO REASON GIVEN.
08-00-80 06-00-82 NO REASON PROVIDED.
10-29-81 04-01-83 NO REASON PROVIDED.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
PUBLIC LIBRARY OF CHARLOTTE AHD MACKLENBURG CDUHTY 310 NORTH TRYOH STREET CHARLOTTE, NORTH CAROLINA 28202
C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-073 MCGUIRE 2 NUCLEA R POWER PLANTS STATUS AS OF:
03-31-82 C0NSTRUCT ION 5TA T U St APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-01-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-00-82 DEFINED IN 4 : (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-76 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-01-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLC.TE:
98%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION
[DMPLETIqM 1_[DMPLETE MOBILIZE AND PREPARE SITE:
04-01-71 05-08-72 100%
PLACE STRUCTURAL CONCRETE:
07-08-72 07-01-82 99%
INSTALL REACTOR PRESSURE VESSEL:
06-09-75 06-10-75 100%
INSTALL LARGE BORE PROCESS PIPE:
03-01-75 03-01-82 03-01-82 100%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
04-01-75 07-15-82 95%
INSTALL SMALL EORE PIPE:
04-01-78 03-01-82 03-01-82 100%
INSTALL CABLE TRAY:
08-01-74 07-01-82 95%
INSTALL EXPOSED METAL CONDUIT:
08-01-74 07-01-82 95%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
04-01-77 10-01-82 90%
INSTALL ELECTRICAL TERMINATIONS:
04-15-77 08-01-82 95%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
07-19-82 07-28-82 0%
CONDUCT HOT FUNCTIONAL TEST:
09-01-C2 13-26-82 C%
CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LDAD:
10-27-82 03-01-83 0%
l l
1 l
9
C0N5T RUCT ION STATUS REPORT PAGE NO: 2-074 MIDLAND 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERIST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000329 CORPORATE CONTACT:
J. W. COOK, VICE PRESIDENT PROJECTS, ENG & CONSTRUCTION CP NO. 8 DATE ISSUED:
CPPR-81 / 12-15-72 CP EXPIRATICN DATE:
12-01-84 CORPORATE ADDR2SS:
1945 W.
PARNALL ROAD JACKSON, MICHIGAN 49201 APPLICANT:
CONSUMERS POWER PLANT LOCATION:
SW BOUNDARY OF MIDLAND, MICH.
IE REGION:
3 CORPORATE PHONE NO:
(517) 788-0453 AE:
BECHTEL NSSS:
BABCOCK 1 WILCOX CONSTRUCTOR:
BECHTEL NRC LPM:
D. HOOD REACTOR TYPE:
D. BOYD DER (MWEi:
0492 IE RESIDENT INSPECTOR:
R. J. COOK IN5PECTICN S T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD A$ REPQRTED BY UTILITY:
Jan. 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHED411 REPORTED BY UTILITY NUnFER OF INSP.
OF INSP.
11-07-74 11-00-80 CONSTRUCTION SCHEDULE STRETCHOUT TD 8201 01-12-82 01-12-82 REDUCE CURRENT CASH OUTFLOW.
(
8202 01-19-82 01-22-82 01-14-75 11-00-81 CONSTRUCTION SCHEDULE STRETCHED OUT TO l
8204 03-02-82 03-04-82 REDUCE CURRENT CASH OUTFLOW.
09-00-80 12-00-83 PROJECT SCHEDULE REEVALUATION 1
INCORPORATING OUTSTANDING LICENSING Inspection Reports are available at local PDRe.
ISSUES.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
GRACE DOW MEMORIAL LIBRARY 171C W. ST. ANDREWS ROAD MIDLAND MICHIGAN 48640
~. _. - -. - ~
- - _ _ ~ - -
C0NSTRUCTION STAVUS REP 0RT PAGE NO: 2-075 MIDLAND 1 NUCLEAR P0WER PLANTS SVATUS AS OF 03-31-82 i
C0NSTRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-00-81 DEFINED IN CP: (EARLIEST) 12-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
11-00-79 (LATEST) 12-01-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 07-00-84M CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 77%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: N COMMERCIAL OPERATION FOR BOTH PROCESS STEAM AND ELECTRICAL.
NN PERCENT COMPLETE IS LARGE BORE HANGERS. RESTRANTS AND SNUBBERS ARE NOT INCLUDED.
1 ESTIMATED ACTUAL.
ESTIMATED ACTUAL ESTIMATED 9
START START COMPLETION
$9MPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
03-00-73 08-00-73 100%
PLACE STRUCTURAL CONCRETE:
08-00-73 01-00-82 99%
INSTALL REACTOR PRESSURE VESSEL:
06-00-78 08-00-78 100%
INSTALL LARGE BORE PROCESS PIPE:
07-00-76 08-00-82 98%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:MW 12-00-77 12-00-82 93%
INSTALL SMALL BORE PIPE:
01-00-77 12-00-82 95%
q INSTALL CABLE TRAY:
04-00-77 12-00-82 97%
INSTALL EXPOSED METAL CONDUIT:
04-00-77 12-00-82 98%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
11-00-78 06-00-83 83%
j INSTALL ELECTRICAL TERMINATIONS:
06-00-78 06-00-83 58%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
12-00-82 12-00-82 0%
CONDUCT NOT FUNCTIONAL TEST:
05-00-83 06-00-83 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
05-00-82 12-00-83 0%
)
i i
ld
C0NSTRUCTION SVATUS REP 0RT PAGE NO: 2-07G MZDLAND 2 NUCLEAR. POWER PLANT $
STATUS AS OF 03-31-82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL DOCKET NO:
05000330 CORPORATE CONTACT:
J. W. COOK, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-82 / 12-15-72 PROJECTS, ENG 8 CONSTRUCTION CP EXPIRATION DATE:
07-01-84 CORPORATE ADDRESS:
1945 W.
PARNALL ROAD APPLICANT:
CONSUMERS POWER JACKSON, MICHIGAN 49201 PLANT LOCATION:
SW BOUNDARY OF MIDLAND, MICH.
IE REGION:
3 CORPORATE PHONE NO:
(517) 788-0453 AE:
BECHTEL NSSS:
BABCOCK 8 WILCOX CONSTRUCTOR:
BECHTEL NRC LPM:
D. HOOD REACTOR TYPE:
D. BOYb DER (MWE):
0818 IE RESIDENT INSPECTOR:
R. J. COOK INSPECTION S T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED 3Y UT I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
11-07-74 11-00-79 CONSTRUCTION SCHEDULE STRETCHED OUT TO 8201 01-12-82 01-12-82 REDUCE CURRENT CASH OUTFLOW ANNOUNCED BY 8202 01-19-82 01-22-82 UTILITY.
8204 03-02-82 03-04-82 01-14-75 11-00-80 CONSTRUCTION SCHti)ULE STRETCHED OUT.
09-11-79 06-00-81 DEVELOPMENT OF A TWO UNIT INTEGRATED TEST Inspection Reports are available at local PDRs.
SCHEDULE.
09-00-30 07-00-83 PROJECT SCHEDULE REEVALUATION INCORPORATING OUTSTANDING LICENSING ISSUES.
i L0 CAL PUBLIC D0CUMENT R 0 0 Mr GRACE'DOW MEMORIAL LIBRARY 1710 W. ST. ANDREWS ROAD MIDLAND MICHIGAN 48640
[
s
-... - - -. - ~
- - -. ~ -
~.
.n--_-
C0N5TRUCTION STATUS REP 0RT PAGE NO: 2-077 MIDLAND 2 NUCLEAR POWER PLANTS STATU$ AS OF:
03-31-82 C0NSTRUCTION 5TATUS:
j APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
07-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS i
APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-00-81 DEFINED IN CP: (EARLIEST) 07-J1-83 1
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
11~00-78 (LATEST) 07-01-84 l
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 12-00-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 77%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: M PERCENT COMPLETE IS LARGE BORE HANGERS. RESTRAINTS AND SNUBBERS ARE NOT INCLUDED.
1 i
iTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED i
START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPAF.E SITE:
03-00-73 08-00-73 100%
f PLACE STRUCTURAL CONCRETE:
08-00-73 04-00-83 99%
INSTALL REACTOR PRESSURE VESSEL:
04-00-78 05-00-78 100%
INSTALL LARGE BORE PROCESS PIPE:
04-00-76 08-00-82 98%
a INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SHUBBERS N 11-00-77 12-00-82 88%
INSTALL SMALL BORE PIPE:
01-00-77 12-00-82 88%
INSTALL CABLE TRAY:
04-00-77 03-00-83 97%
INSTALL EXPOSED METAL CONDUIT:
04-00-77 03-00-83 89%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
01-00-78 06-00-83 83%
1 INSTALL ELECTRICAL TERMINATIONS:
06-00-78 06-00-83 58%
j CONDUCT REACTOR COLD HYDROSTATIC TEST:
10-00-82 10-00-82 0%
CONDUCT HOT FUNCTIONAL TEST:
01-00-83 03-00-83 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
05-00-82 08-00-83 0%
i e
t i
C0N5TRUCTION STATUS REPQRT PAGE NO: 2-078 MILLSTONE 3 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERISTICSt KEY PERS0NNEL:
DOCKET NO:
050L0423 CORPORATE CONTACT:
W. G. COUNSIL. VICE PRESIDENT CP NO. 3 DATE ISSUED: CPPR-113/ 08-09-74 NUCLEAR ENGINEERING 3 OPERATIONS CP EXPIRATION DATE:
10-01-79 CORPORATE ADDRESS:
P. O. BOX 270 l
APPLICANT:
NORTHEAST NUCLEAR ENERGY HARTFORD. CONNECTICUT 06101 PLANT LOCATIDH:
5 MI SW OF NEW LONDON, CONN IE REGICN:
1 CORPORATE PHONE NO:
(203) 666-6911 AE:
ST0*lE 2 WEBSTER NSSS:
WESTINGHGUSE CONSTRUCT 0R:
S?ONE & WEBSTER NRC LPM:
J. GRANT REACTOR TYPE:
DER (MWE):
1159 IE RESIDENT INSPECTOR:
INSPECTION S T A T U S:
FUEL L'O A,D DATE C.HANGES TIME PERIOD AS REP 0RTED BY U 'T I L I T Y:
(
Jan, 1982 - Mar, 1982 REASON FOR CHANGE REPORT NEW REPORT BEG DATE END DATE DATE
}CHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
N 03-00-75 06-00-79 REEVALUATION OF PROGRAM STAl'JS.'
82-01 01-13-82 01-15-82 11-00-76 12-00-81 1.
UNCERTAIN FUEL SUPPLY.
82-02 01-11-82 02-23-82
- 2. CHAH6ES IN LOAD DEMAND.
82-04 03-01-82 04-09-82
'5.
INCREASES IN PROJECT COST.
- 4. PSDIFICATIDHS IN LONG RANGE PLAMMING.
10-20-77 12-00-85 FlhANCIAL CONSIDERATIONS.
Inspection Reports are available at local PDRs.
\\
r m
h L0 CAL PUBLIC D0CUMENT R 0 0 M:
5 WATERFORD PUBLIC LIBRARY ROPE FERRY ROAD, ROUTE 156 WATERFORD, CONNECTICUT 04385
\\ L k
~
C0NSTRUCTION 5TA TUS REP 0RT PAGE ND: 2-979 MILLSTONE 3 NUCLEAR POWER PLANTS STATUS AS-OF:
03-31-82 i
C0NSTRUCTION S T A T U 5:
s APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-01-85 APPLICANTS CONSTRUCTION CCMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-01-31 DEFINED IN CP: (EARLIEST) 12-01-78 APPLICANT'S ESTIMATED FUEL LOADING DATE.4T CP ISSUANCE:
12-01-78 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-01-86 t
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 43%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START
[gMPLETION
[gMPLETIQM I_ggFPLETE MOBILIZE AND PREPARE SITE:
05-00-74 09-00-74 09-00-74 100%
PLACE STRUCTURAL CONCRETE:
10-00-74 08-00-74 71%
INSTALL REACTOR PRESSURE VESSEL:
07-00-80 07-00-80 07-00-80 100%
INSTALL LARGE BORE PROCESS PIPE:
02-00-77 01-00-85 43%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
02-00-77 01-00-85 18%
INSTALL SMALL BORE PIPE:
02-00-77 01-00-85 20%
INSTALL CABLE TRAY:
03-00-77 01-00-85 43%
INSTALL EXPOSED METAL CONDUIT:
10-00-77 01-00-84 15%
INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLE:
03-00-78 12-00-84 0.8%
INSTALL ELECTRICAL TERMINATIONS:
03-00-78 01-00-85 0.5%
CONDUCT ftEACTOR COLD HYDROSTATIC TEST:
03-00-85 03-00-85 03-00-85 0%
CONDUCT HOT FUNCTIONAL TEST:
08-00-85 08-00-85 08-00-85 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
12-00-85 12-00-85 12-00-85 0%
C0NSTRUCTION STATUS REPQRT PAGE NO: 2-080 NINE MILE POINT 2 NUCLEAR POWER PLANTS STATUS AS CF:
03-31-82 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
05000410 CORPORATE CONTACT:
S.
F. MANNO, PROJECT MANAGER CP NO. 8 DATE ISSUED: CPPR-112/ 06-24-74 CP EXPIRATION DATE:
07-13-78 CORPORATE ADDRESS:
300 ERIE BOULEVARD WEST APPLICANT:
NIAGARA MOHAWK POWER SYRACUSE. NEW YORK 13202 PLANT LOCATION:
8 MI NE OF OSWEGO, NY IE REGION:
1 CORPORATE PHONE NO:
(315) 474-1511 AE:
STONE & WEBSTER NS$$:
GENERAL ELECTRIC CONSTRUCTOR:
STONE 4 WEBSTER NRC LPM:
D. LYNCH REACTOR TYPE:
DER (MWE):
1080 IE RESIDENT INSPECTOR:
R.
D. SCHULE l
INSPECT IOH STATU5:
FUEL L0AD DAT E CHANGES l
TIME PERIOD A5 REPORT ED BY U T I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UIILITY NUFBER OF INSP.
OF INSP, 03-14-78 03-31-83 1 DESIGN CHANGES TO MITIGATE CONTAINMENT 82-01 01-18-82 02-26-82 DYNAMIC LOADS.
82-02 03-01-82 03-26-8?
- 2. DESIGN CHANGES TO IMPLEMENT SEPARATION 82-03 03-29-82 04-30-82 REQUIREMENTS OF REG. GUIDE 1.75.
12-14-78 03-31-84 1 WOPK STOPPAGES AND SHUTDOWN OF JCB.
- 2. DELAYS IN PROCUREMENT OF EQUIPMENT.
- 3. REESTIMATE OF SCHEDULE POWER REQMTS.
Inspection Reports are available at local PDRs.
- 4. HEARING DELAYS.
03-00-80 03-00-86 1 POWER GENERATION CONTROL COMPLEX (PGCC).
- 2. GEOLOGICAL IMPACTS.
- 3. MARK II CONTAihMENT.
4 BIOLOGICAL SHIELD WALL.
- 5. THREE MILE ISLAND IMPACTS.
- 6. NEW YORK STATE FUBLIC SERVICE COMMISSION.
L0 CAL PUBL IC D0CUMENT R 0 0 M:
STATE UNIVERSITY COLLEGE AT DSWEGO PENFIELD LIBRARY OSWEGO. NEW YORK 13126
C0NSTRUCT ION STATUS REPQRT PAGE NO: 2-081 NINE MILE POINT 2 NUCLEAR POWER PLANT 5 STATUS AS OF 03-31-82 C0NSTRUCT ION 5TA T U S:
APPLICANT'T CURRENT ESTIMATED FUEL LOADING DATE:
03-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL 10ADING DATE:
04-00-84 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-01-78 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-01-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 44%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED
__iTART START COMPLETION
[DMPLETIDM % COMPLETE MOBILIZE AND PREPARE SITE:
08-25-75 08-25-75 08-01-76 08-01-76 100%
PLACE STRUCTURAL CONCRETE:
05-09-77 05-09-77 08-19-85 74%
INSTALL REACTOR PRESSURE VESSEL:
08-13-79 08-13-79 08-08-80 08-08-80 100%
INSTALL LARGE BORE PROCESS PIPE:
06-07-76 06-07-76 12-03-84 42%
INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND SNUBBERS:
09-05-77 09-05-77 12-03-84 20%
INSTALL SMALL BORE PIPE:
02-01-82 03-11-85 0%
INSTALL CABLE TRAY:
11-06-78 11-06-78 07-09-84 33%
INSTALL EXPOSED METAL CONDUIT:
09-12-77 09-12-77 08-12-85 18%
INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLE:
01-04-82 03-01-82 10-07-85 0%
INSTALL ELECTRICAL TERMINATIONS:
03-01-82 12-30-85 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
04-29-85 05-20-85 0%
CONDUCT HOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
11-14-83 02-24-86 0%
s
C0N5TRUCTION STA TUS R EPQRT PAGE NO: 2-082 NORTH ANNA 3 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 P LA NT CHA RACTER IST I C St KEY PERS0NN EL 11 DOCKET NO:
05000404 CORPORATE C3NTACT:
S. C.
BROWN, JR., SR.
V. P. PSESC CP NO. 3 DATE ISSUED:
CPPR-114/ 07-26-74 POWER CP LXPIRATION DATE:
12-21-83 CORPORATE ADDRESS:
P.
O.
BOX 2666 APPLICANT:
VIRGINIA ELECTRIC 4 POWER RICHMOND, VIRGINIA 23216 PLANT LOCATION:
40 MI NW OF RICHMOND, VA IE REGION:
2 CORPORATE PHONE NO:
(804) 771-3274 AE:
STONE 3 WEBSTER NSSS:
BABCOCK 8 WILCOX CONSTRUCTOR:
STONE & WEBSTER NRC LPM:
R.
L. CAPRA REACTOR TYPE:
C.
R. MCFARLAND DER (MWE):
0907 IE RESIDENT INSPECTOR:
TIME PERIOD A$ REPORTED BY U T I L I T Y:
1 Jan. 1982 - Mar. 1982 l
REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY
!4AM_B_LB 0F INSP.
GF INSP.
03-21-75 07-00-80 ECONOMIC FACTOR $.
8201 02-10-82 02-12-82 07-23-76 11-01-80 SCHEDULE SLIPPAGF. IS DUE TO REEVALUATION OF CONSTRUCTION PROGRESS.
03-01-77 11-00-81 VOLUNTARY DELAY DUE TO EFFORTS AT Inspection reports are available at local PDRs.
CONSERVATION AND LOAD MANAGEMENT.
04-00-80 N/S NO REASON PROVIDED.
11-19-81 04-00-89 LOAD MANAGEMENT.
L 0CA L PUBL I C D0CUMEN T R 0 0 M:
ALDERMAN LIBRARY LOUISA COUNTY COURTHOUSE UNIVERSITY OF VIRGINIA P. O.
BOX 27 CHARLOTTESVILLE, VA 22901 LOUISA, VIRGINIA 23093
- ~ _ -
C0NSVRUCT ION
$TA TUS REP 0RT PAGE NO: 2-083 HORTH ANNA 3 NUCLEAR POWER PLAN TS STATUS AS OF:
03-31-82 C0N$TRUCT ICN STA T U St APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-00-89 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-00-81 DEFINED IN CP: (EARLIEST) 07-31-78 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
07-00-78 (LATEST) 12-31-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-00-89 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
8%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: DRILLING OF CAISSONS AND ROCK ANCHORS FOR SITE FOUHDATIONS 1
CURRENTLY UNDER WAY.
PERCENT CONSTRUCTION COMPLETE UNDER REVIEW.
APPLICATION FOR CP EXTENSION TO BE SUBMITTED IN JULY, 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETIQN % COMPLETE MOBILIZE AHD PREPARE SITE:
07-00-72 01-02-76 100%
PLACE STRUCTURAL CONCRETE:
01-02-76 11-29-86 19%
INSTALL REACTOR PRESSURE VESSEL:
10-21-85 11-18-85 0%
INSTALL LARGE BORE PROCESS PIPE:
09-06-84 03-30-87 0%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
09-06-84 03-30-87 0%
INSTALL SMALL BORE PIPE:
11-05-84 02-18-88 0%
INSTALL CABLE TRAY:
11-05-84 10-12-87 0%
l INSTALL EXPOSED METAL CONDUIT:
12-03-84 09-26-88 0%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
11-19-24 11-07-88 0%
INSTALL ELECTRICAL TERMINATIONS:
09-09-85 12-07-88 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
09-26-88 10-17-88 0%
CONDUCT HOT FUNCTIONAL TEST:
11-14-88 01-02-89 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
12-00-86 04-00-89 0%
l
C0NSTRUCT ION STA TUS REPQRT PAGE NO: 2-084 PALO VERDE 1 NUCLEAR POWER PLANT $
STATUS AS OF:
03-31-32 P LANT CHARA CT E,9 IST I C S:
K EY P E R S 0 N N E L:
DOCKET NO:
05000528 CORPORATE CONTACT:
E. E. VAN BRUNT.
JR..
VICE PRES.
CP HO. 8 DATE ISSUED:
CPPR-141/ 05-25-76 NUCLEAR PROJECTS MANAGEMENT CP EXPIRATION DATE:
11-01-82 CORPORATE ADDRESS:
P. O.
BOX 21666 APPLICANT:
ARIZONA PUBLIC SERVICE PHOENIX, ARIZONA 85036 PLANT LOCATION:
36 MI W OF PHOENIX, AZ IE REGION:
5 CORPORATE PHONE NO:
(602) 271-7900 AE:
BECHTEL NSSS:
COMBUSTION ENGINEERING CONSTRUCTOR:
BECNTEL NRC LPM:
J. KERRIGAN REACTOR TYPE:
DER (MWE):
1304 IE RESIDENT INSPECTOR:
L. VORDERBRUEGGEN INSP ECTION STA T U S:
FUEL L0AD DA TE CHANGES TIME PERIOD AS REPORTED BY UT ILITY:
Jan. 1982 - Mar. 1982 REPOR)
NEW REASON FOR CHANGE f
REPORT BEG DATE END DATE DATE SCHEDULE REPORTFD BY UTILITY NUMBER OF INSP.
OF INSP.
09-13-79 11-00-82 NO REASON REPORTED.
82-01 01-01-82 01-30-82 82-02 01-25-82 01-29-82 I
82-03 01-01-82 01-31-82 82-04 02-01-82 02-28-82 82-05 02-16-82 02-19-82 82-06 01-12-82 02-05-82 82-07 02-01-82 02-28-82 82-08 03-01-82 03-31-82 82-09 03-01-82 03-31-82 Inspection Reports are available at local PDRs.
L0 CAL POBL IC D0CUMEN T R 0 0 M:
PHOENIX PUBLIC LIBRARY 12 EAST MCDOWELL ROAD PHOENIX, ARIZONA 85004
.- _ = - -
C0NSTRUCT ION
$VA TUS R EPORT PAGE NO: 2-085 PA'3 VERDE 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-83 C0N5 iRUCT ION
$TA T U S:
4?PLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
11-01-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS At*LICANT'S PREVIOUS ESTIMATED FUdl LOADING DATE:
11-00-81 DEFINED IN CP: (EARLIEST) 06-01-81 AP?; IC AN T ' S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
11-00-81 (LATEST) 11-01-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-00-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 97%
CCMMENTS REGARDING CUPRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETIQH % COMPLETE MOBILIZE AND PREPARE SITE:
05-00-76 10-00-76 100%
PLACE STRUCTURAL CONCRETE:
08-00-76 01-00-81 100%
INSTALL REACTOR PRESSURE VESSEL:
11-00-78 12-00-78 100%
INSTALL LARGE BORE PROCESS PIPE:
03-00-77 07-00-82 99%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND $NUBBERS:
09-00-78 09-00-82 96%
INSTALL SMALL BORE PIPE:
06-00-78 08-00-82 93%
INSTALL CABLE TRAY:
10-00-77 01-00-82 11-00-81 100%
I INSTALL EXPOSED METAL CONDUIT:
03-00-78 08-00-82 92%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-00-79 09-00-82 89%
INSTALL ELECTRICAL TERMINATIONS:
08-00-79 10-00-82 80%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
05-00-82 05-00-82 0%
CONDUCT HOT FUNCTIONAL TEST:
06-00-82 08-00-82 0%
CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
01-00-82 10-00-81 11-00-82 3%
l l
l C0NSTRUCT ION
$VA TUS R EPORV PQGE NO: 2-086 l
PALO VERDE 2 NUCLEA R POWER PLANTS STATUS AS OF:
03-31-82 l
l PL AN T CHARACT ERIST I C S:
KEY PERSONNEL DOCKET NO:
05000529 CORPORATE CONTACT:
E.
E. VAN B RUN T. JR.. VICE PRES.
CP NO. 1 DATE ISSUED:
CPPR-142/ 05-25-76 NUCLEAR PROJECTS MANAGEMENT CP EXPIRATION DATE:
11-01-84 CORPORATE ADDRESS:
P.
O.
BOX 21666 AFPLICANT:
ARIZONA PUBLIC SERVICE PHOENIX. ARIZONA 85036 PLANT LOCATION:
36 MI W OF PHOENIX. AZ IE REGION:
5 CORPORATE PHONE NO:
(602) 271-7900 AE BECHTEL NSSS:
COMBUSTION ENGINEERING CONSTRUCTOR:
BECHTEL NRC LPM:
J. KERRIGAN REACTOR TYPE:
DER (MWE):
1304 IE RESIDENT INSPECTOR:
L. VORDERBUREGGEN l
l INSPECTION STA T U S:
FUEL L0AD DA TE CHANGES TIME PERIOD AS REPQRTED BY UT ILITY Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBE8 0F INSP.
OF INSP.
82-01 01-25-82 01-29-82 82-02 01-01-82 01-31-82 82-03 02-01-82 02-28-82 82-04 03-01-82 03-31-82 Inspection Reports are available at local PDRs.
L0CA L PUBL IC D0CUMENT R 0 0 M:
PHOENIX PUBLIC LIBRARY 12 EAST MCDOWELL ROAD PHOENIX. ARIZONA 85004
C0NSTRUCTZ0N 3TATUS REPDRT PAGE NO: 2-087 PALD VERDE 2 NUCLEAR POWER PLANTS SVATUS AS OF:
03-31-82 C0N$TRUCT ION 5TATUSt APPLICANT'S CURRENT ESTIMATCD FUEL LOADING DATE:
11-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-00-L3 DEFINED IN CP (EARLIEST) 02-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
11-00-83 (LATEST) 11-01-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 0S-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 85%
COMMENTS REGARDING CURRENT CONSTRUCTI0d STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
06-00-76 06-00-77 100%
PLACE STRUCTURAL CONCRETE:
08-00-77 12-00-81 12-00-81 100%
INSTALL REACTOR PRESSURE VESSEL:
06-00-80 07-00-80 100%
INSTALL LARGE BORE PROCESS PIPE:
09-00-78 07-00-82 97%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
10-00-78 10-00-82 76%
INSTALL SMALL BORE PIPE:
04-00-79 10-00-82 72%
INSTALL CABLE TRAY:
06-00-78 03-00-82 03-00-82 100%
INSTALL EXPOSED METAL CONDUIT:
01-00-78 10-00-82 79%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-00-81 12-00-82 53%
INSTALL ELECTRICAL TERMINATIONS:
05-00-81 02-00-83 40%
CONDUCT REACTOR COLD HYDROSTATIC TEST 02-00-83 02-00-83 0%
C0!! DUCT HOT FUNCTIONAL TEST 06-00-83 08-00-83 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
09-00-82 11-00-83 0%
C0NSTRUCT ION
$TATUS REPORT PAGE NO: 2-088 PALO VERDE 3 NUCLEAR POWER PL ANTS STATUS AS OF:
03-31-82 PLANT CHARACTERISTICS:
KEY PERS0NNEL DOCKET NO:
05000530 CORPORATE CONTACT:
E.
E. VAN BRUNT, JR.,
VICE PRES.
CP NO. 1 DATE ISSUED:
CPPR-143/ 05-25-76 NUCLEAR PROJECTS MANAGEMENT CP EXPIRATION DATE:
11-01-86 CORPORATE ADDRESS:
P.
O. BOX 21666 APPLICANT:
ARIZONA PUBLIC SERVICE PHOENIX, ARIZ0h4 85036 PLANT LOCATION:
36 MI W OF PHOENIX, AZ IE REGION:
5 CORPORATE PHONE NO:
(602) 271-7900 AE BECHTEL NSSS:
COMBUSTION ENGINEERING CONSTRUCTOR:
BECHTEL NRC LPM:
J. KERRIGAN REACTOR TYPE:
DER (MWE):
1304 IE RESIDENT INSPECTOR:
L.- VORDERBUREGGEN INSPECTION STA T U St FUEL L0AD DA TE CHANGES TIME PERIOD AS REP 0RTED BY UT IL I T Y:
Jan, 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
82-01 01-25-82 01-29-82 82-02 01-01-82 01-31-82 82-05 02-01-82 02-28-82 i
I 82-04 03-01-82 03-31-82 Inspection Reports are available at local PDRs.
L0 CAL PUBL IC D0CUMENT R 0 0 M:
PHOENIX PUBLIC LIBRARY 12 EAST MCDOWELL ROAD PHOENIX, ARIZONA 85004
C0NSTRUCTION SVA TUS REPORT P,
103 2-089 PALO UERDE 3 NUCL EAR POWER PLAN TS STATUS AS 0, 03-31-82 n.
C0NSTRUCT ION
$TA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
11-00-85 APPLICANsS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-00-85 DEFINED IN CP: (EARLIEST) *1-01-84 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
11-00-85 (LATEST) 11-01-86 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 39%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETICN CO*PLETION % COMPLETE MOBILIZE AND PREPARE SITE:
06-00-76 04-00-79 100%
PLACE STRUCTURAL CONCRETE:
03-00-79 12-00-83 81%
INSTALL REACTOR PRESSURE VESSEL:
04-00-82 05-00-82 0%
INSTALL LARGE BORE PROCESS PIPE:
04-00-79 08-00-84 47%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
10-00-80 12-00-84 11%
INSTALL SMALL BORE PIPE:
06-00-80 10-00-84 3%
INSTALL CABLE TRAY:
04-00-80 02-00-84 38%
INSTALL EXPOSED METAL CONDUIT:
01-00-80 10-00-84 24%
INSTALL POWER, CONTROL, INSTRUMENTATIDH AND SECURITY CABLE:
10-00-82 12-00-84 0%
INSTALL EL ECTRICAL TERMINATIONS:
01-00-83 02-00-85 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST 02-00-85 02-00-85 0%
CONDUCT NOT FUNCTIONAL TEST 06-00-85 08-00-85 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
09-00-84 11-00-8s 0%
C0NSTRUCT ION STATUS REPQRT PAGE NO: 2'-090 PERRY 1 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 PLANT CHA RACTER I$T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000440 CORPORATE CONTACT:
D. R. DAVIDSON, VICE PRESIDENT CP NO.
- DATE ISSUED:
CPPR-148/ 05-03-77 ENGINEERING CP EXPIRATION DATE:
CORPORATE ADDRESS:
P.
O. BOX 5000/55 PUBLIC SQUARE APPLICAN1:
CLEVELAND ELECTRIC ILLUMINATING CLEVELAND, ONIO 44101 PLANT IOCATION:
7 MI NE OF PAINESVILLE, OHIO IE REGION:
3 CORPORATE PHONE NO:
(216) 622-9808 AE:
GILBERT ASSOCIATES HSSS:
GENERAL ELECTRIC CONSTRUCTOR:
KAISER ENGINEERS NRC LPM:
M.
D.
NOUSTON REACTOR TYPE:
P.
PELKE DER (MWE):
1205 IE RESIDENT INSPECTOR:
M. GILDNER INSPECT ION S T A T U 5:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY:
Jan, 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMB 58 0F INSP.
OF INSP.
03-25-77 05-30-81 LICENSING DELAYS.
8116 11-17-81 12-15-81 01-18-79 05-00-82 SCHEDULE REEVALUATION.
8117 11-18-81 12-02-81 02-00-80 05-00-23 NO REASON PROVIDED.
8118 11-30-81 12-02-81 02-22-82 11-00-81 NO REASON PROVIDED.
Inspection Reports are available at local PDRs.
L 0CA L PUB L IC D0CUMENT R 0 0 Mr PERRY PUBLIC LIBRARY 3753 MAIN STREET PERRY, OHIO 44081
C0NSTRUCTION STAVUS REPORV PAGE NO: 2-091 PE23Y 1 NUCLEAR POWER PLANTS STAYUS AS OF:
03-31-82 C0NSTRUCTION
$TA TUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
11-00-83 APPLICANTS CONSTRUCTIDH COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
05-00-83 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
OE-30-81 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 81%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: ND UPDATE PROVIDED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11 ART COMPLETION COMPLETION % COMPLETE MOBILIZE AHD PREPARE SITE:
10-00-74 03-00-76 100%
3 PLACE STRUCTURAL CONCRETE:
03-00-76 05-00-83 99%
INSTALL REACTOR PRESSURE VESSEL:
07-00-78 09-00-78 100%
INSTALL LARGE BORE PROCESS PIPE:
07-00-78 07-00-83 93%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
08-00-83 73%
INSTALL SMALL BORE PIPE:
08-00-83 70%
i INSTALL CABLE TRAY:
06-00-82 99%
INSTALL EXPOSED METAL CONDUIT:
09-00-63 69%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
08-03-79 10-C0-83 53%
INSTALL ELECTRICAL TERMINATIONS:
10-17-79 10-00-83 58%
CONDUCT REACTOR COLD NYDR0 STATIC TEST 03-00-83 03-00-83 0%
CONDUCT HOT FUNCTIONAL TEST:
N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
03-00-79 10-00-83 0%
i.
i C0N5TRUCTION STATUS REPQRT PAGE NO: 2-002 PERRY 2 NUCLEAR POWER PLAN TS STATUS AS OF:
03-31-82 PLANT CHARACTER ISTICSt KEY PERS0NN E DOCKET NO:
05000441 CORPORATE CONTACT:
D. R.
DAVIDSON, VICE PRESIDENT CP HO. 4 DATE ISSUED:
CPPR-149/ 05-03-77 ENGINEERING CP EXPIRATION DATE:
CORPORATE ADDRESS:
P.
O.
BOX 5000/55 PUBLIC SQUARE APPLICANT:
CLEVELAND ELECTRIC ILLUMINATING CLEVELAND, OHIO 41101 PLANT LOCATION:
7 MI NE OF PAINESVILLE, OHIO IE REGION:
3 CORPORATE PHONE NO:
(216) 622-9808 AE GILBERT ASSOCIATES NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
KAISER ENGINEERS NRC LPM:
M. D. NOUSTON REACTOR TYPE:
P.
PELKE DER (MWE):
1205 IE RESIDENT INSPECTOR:
M.
GILDNER IN5PECTION STATUSt FUEL L0AD DATE CNANGES TIME PERIOD A S REPORT ED BY UT I L I TY Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
03-25-77 12-30-82 LICENSING DELAYS.
8116 11-17-81 12-15-81 01-18-79 09-00-83 SCHEDULE REEVALUATION.
8117 11-18-81 12-02-81 02-00-80 05-00-87 NO REASON PROVIDED.
8118 11-30-81 12-02-81 Inspection Reports are available at local PDRs.
L0 CAL PUBL IC D0CUMEN T R 0 0 M:
PERRY PUBLIC LIBRARY 3753 MAIN STREET PERRY, OHIO 44081 1
C0NSTRUCVION STA TUS REPORT PAGE NO 2-093 PERRY 2 NUCL EAR POWER PLANVS STATUS AS OF 03-31-82 C0NSTRUCTION STA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
05-00-87 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
09-30-83 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
12-30-82 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-00-88 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 41%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START _
COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
10-00-74 04-00-76 100%
PLACE STRUCTURAL CONCRETE:
04-00-76 10-00-85 89%
INSTALL REACTOR PRESSURE VESSEL:
10-00-78 01-00-79 100%
INSTALL LARGE BORE PROCESS PIPE:
04-00-79 11-00-86 18%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
04-00-79 11-00-86 14%
INSTALL SMALL BORE PIPE:
12-00-86 0%
INSTALL CABLE TRAY 10-00-78 09-00-85 30%
INSTALL EXPOSED METAL CONDUIT 10-00-78 01-00-87 24%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
04-00-80 02-00-87 0%
INSTALL ELECTRICAL TERMINATIONS:
06-00-80 02-00-87 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST 04-00-86 04-00-86 0%
CONDUCT HOT FUNCTIONAL TEST N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
01-00-85 04-00-87 0%
C0N STRUCT ION
- 5. T A i US REPQRT PAGE NO: 2-094 PHIPP5 BEND 1 NUCLEA R POWER PL AN TS STATUS AS OF 03-31-82 P L A N T CHARACT ER IST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000553 CORPORATE CONTACT:
G.
KIMMONS, MANAGER CP NO. 8 DATE ISSUED:
CPPR-162/ 01-16-78 0FFICE OF ENG. DESIGN & CONST.
CP EXPIRATION DATE:
04-00-84 CORPORATE ADDRESS:
400 CCMMERCE AVENUE APPLICANT:
TENNESSEE VALLEY AUTHORITY KNOXVILLE. TENNESSEE 37902 PLANT LOCATION:
15 MI SW OF KINGSPORT. TENN IE REGION:
2 CORPORATE PHONE NO:
(61S) 632-2911 AE:
TENNESSEE VALLEY AUTil0RITY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
TENNESSEE VALLEY AUTHORITY HRC LPM:
REACTOR TYPE:
DER (MWE):
1220 IE RESIDENT INSPECTOR:
FUEL L0A D DA T E CHA NGES TIME PERIOD AS R EPORTED BY UT I L I T Y:
Jan, 1982 - Mar, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.
OF INSP.
09-12-79 02-00-86 NO REASON STATED.
HONE.
09-10-80 12-00-87 NO REASON PROVIDED.
08-14-81 01-00-93 NO REASON PROVIDED.
Inspection reports are available at local PDRs.
L 0CA L PUBL IC D0CUMEN T R 0 0 M:
KINGSPORT PUBLIC LIBRARY BROAD & NEW STREETS KINGSPORT. TENNESSEE 37660
]
l C0NSTQUCTION 5TATUS REPORT PAGE NO: 2-095 i
PHIPPS BEND 1 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 l
CONSTRUCTIDH S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:
01-P2 -9 3 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-)O A-DEFINED IN CP (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
01-00 a3 (LATEST)
]
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-00-93 I
I CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 29%
i COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: CONSTRUCTION IN DEFERRED STATUS EFFECTIVE 01-01-82.
I i
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED
)
START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
10-19-77 12-04-89 70%
PLACE STRUCTURAL CONCRETE:
08-18-78 02-17-93 67%
INSTALL REACTOR PRESSURE VESSEL:
11-11-80 12-01-80 100%
i INSTALL LARGE BORE PROCESS PIPE:
04-30-79 06-29-92 19%
INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SHUBBERS:
0%
INSTALL SMALL BORE PIPE:
0%
j INSTALL CABLE TRAY:
04-14-80 04-26-91 14%
INSTALL EXPOSED METAL CONDUIT:
04-14-80 04-26-91 6%
i INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-27-81 02-17-93 6%
I INSTALL ELECTRICAL TERMINATIONS:
01-12-90 02-17-93 4%
i CONDUCT REACTOR COLD HYDROSTATIC TEST 06-22-92 06-29-92 0%
CONDUCT NOT FUNCTIONAL TEST N/A N/A 0%
CONDUCT PREOP,AND ACCEPTANCE TESTS NECESSARY FOR FULL LDAD:
06-23-91 12-29-92 0%
i l
4 i
i 4
4 4
1 l
C0NSVRUCTION
$TATUS REPQRT PAGE NO: 2-096 PHIPPS BEND 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARAeTERISTICSt KEY PERS0NNEL DOCKET NO:
0500037' CORPORATE CONTACT:
G. KIMMONS, MANAGER CP HO. 4 DATE ISSUED:
CPPR-163/ 41-16-78 0FFICE OF ENG. DESIGN
- CONST.
CP EXPIRATION DATE:
CORPORATE ADDRESS:
400 CCMMERCE AVENUE APPLICANT:
TENNESSEE VALLEY AUTHORITY KNOXVILLE, TENNESSEE 37902 PLANT LOCATION:
15 MI SW OF KINGSPORT. TENN IE REGION:
2 CORPORATE PHONE NO:
(615) 632-2911 AE TENNESSEE VALLEY AUTHORITY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
TENNESSEE VALLEY AUTHORITY NRC LPM:
REACTOR TYPE:
DER (MWE):
1220 IE RESIDENT INSPECTOR:
INSPECTIOH STATUSt FUEL L0AD DATE CHANGES j
TIME PERIOD AS REPORTED BY U T I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
09-12-79 05-00-88 NO REASON STATED.
HONE.
09-10-80 07-00-93 NO REASON PROVIDED.
08-14-81 N/S DEFERRED.
Inspection reports are available at local PDRs.
i i
l L0 CAL PUBL IC DOCUMENT ROOM KINGSPORT PUBLIC LIBRARY BROAD 3 NEW STREETS KINGSPORT, TENNESSEE 37660 g
p
C0NSTRUCT ION SVAVUS REPORT PAGE N0: 2-097 PHIPPS GEND 2 NUCLEAR POWER PLANTS STAVUS AS OF 03-31-82 C0NST RUCTION STA T U St APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
07-00-?,
DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
01-00-83 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
5%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
N/S PLACE STRUCTURAL CONCRETE:
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
INSTALL SMALL BORE PIPE:
INST ALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD NYDR0 STATIC TEST:
1.
CONDUCT NOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
i i
f I
C0NSTRUCTION
$TATUS REP 0RT PAGE NO: 2-098 i
RIVER BEND 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTER ISTICSt K EY P ERS0NNELa
{
l DOCKET NO 05000458 CORPORATE CONTACT:
J. E. 800KER', ENGR 8 LIC.
CP NO. 3 DATE ISSUED: CPPR145 / 03-25-77 RIVER BEND NUCLEAR GROUP i
j CP EXPIRATION DATEt 03-31-83 CORPORATE ADDRESS:
P. O. BOX 2951 j
APPLICANT:
GULF STATES UTILITIES BEAUMONT TEXAS 77704 PLANT LOCATION:
24 MI NhW OF BATON ROUGE, LA
(
IE REGION:
4 CORPORATE PHONE NO:
(713) 839-2181 AEt STONE 8 WEBSTER j
NSSS:
GENERAL ELECTRIC CONSTRUCTOR STONE & WEBSTER NRC LPM:
R.
L. PERCH REACTOR TYPE:
DER (MWE):
0934 IE RESIDENT INSPECTOR:
A.
B. BEACH i
l INSPECTION STA T U St FUEL L0AD DA TE CHANGES TIME PERIOD AS REPORTED BY UTILITY 8 Jan. 1982 - Mar. 1982 i
REPORT NEW REASON FOR CHANGE j
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILIH i
4 HUMP (8 0F INSP.
OF INSP.
l 1
05-13-77 03-00-83 DENIAL OF RATE INCREASE COMBINED WITH L
i 8201 01-01-82 02-20-82 REGULATORY AND CONSTRUCTION DELAYS.
t l'
8204 02-22-82 02-26-82 05-19-78 03-00-84 INABILITY TO OBTAIN ADEQUATE RATE RELIEF.
12-03-80 10-00-83 NO REASON PROVIDED.
I 11-10-81 04-00-85 FUNDING LIMITATIONS OF THE PROJECT.
if f
g Inspection reports are available at local PDRs.
[
}
I i
I i
I l
L I
j L
i l
l I
t i
I l
)
L0 CAL PUBLIC D0CUMEN T R 0 0 Mr AUDUBON LIBRARY GOVERNMENT DOCUMENTS DEPT.
F j
WEST FELICIANA BRANCH LOUISIANA STATE UNIVERSITY
{
j FERDINAND STREET BATON ROUGE, LOUISIANA 70803 i
ST. FRANCISVILLE, LA 70775 l
\\
i I
L t
4
~
-_____m_
C0N$TRUCTION 3TAVUS REPOQT PAGE ND: 2-099 i
RIVER BEND 1 NUCLEAR P0WER PLANTS STATUS AS OF:
03-31-82 l
C0N5TRUCTION 5TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:
04-00-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-83 DEFINED IN CP: (EARLIEST) 03-31-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-00-81 (LATEST) 03-31-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 12-00-85 l
1 t
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 46%
r l
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
04-08-79 04-08-79 10-31-84 90%
PLACE STRUCTURAL CONCRETE:
08-20-79 08-20-79 10-23-83 71%
j INSTALL REACTOR PRESSURE VESSEL:
06-21-81 06-21-81 06-26-81 06-26-81 100%
INSTALL LARGE BORE PROCESS PIPE:
07-01-79 07-01-79 02-29-84 37%
l INSTALL LARGE BORE PIPE NANGERS. RESTRAINTS AND SNUBBERS:
07-01-79 07-01-79 02-29-84 14%
j INSTALL SMALL BORE PIPE:
08-01-80 08-01-80 10-16-84 3%
INSTALL CABLE TRAY:
04-23-81 04-23-81 06-13-83 23%
I INSTALL EXPOSED METAL CONDUIT:
10-01-81 10-01-81 01-16-84 12%
i i
j INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLE:
10-16-81 10-16-81 03-03-84 1%
4 I
INSTALL ELECTRICAL TERMINATIONS:
10-16-81 10-16-81 03-03-84 1%
CONDUCT REACTOR COLD NYDR0 STATIC TEST 05-16-84 05-31-84 0%
I
+
l CONOUCT NOT FUNCTIONAL TEST N/A N/A N/A N/A CGNDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
10-01-83 04-00-85 0%
I
?
4
. _ _ - ~ - _ _. _ -
l
{
C0NSTRUCTION STATUS REPORT PAGE NO: 2-100 I
RIVER BEND 2 NUCLEAR PCWER PLANTS STATUS AS OF:
03-31-82
[
PLANT CHARACTERISTICSr KEY PERS0NNEL DOCKET ND:
05000459 CORPORATE CONTACT J. E. BOOKER. MNGR.-ENGR & LIC.
CP HO. 8 DATE ISSUED: CPPR146 / 03-25-77 RIVER BEND NUCLEAR GROUP CP EXPIRATION DATE:
03-31-83 CORPORATE ADDRESS:
P. O. BOX 2951 APPLICANT:
GULF STATES UTILITIES BEAUMONT. TEXAS 77704 PLANT LOCATIDH:
24 MI NNW OF BATON ROUGE. LA IE REGIDH 4
CORPORATE PHONE NO:
(713) 839-2181 AE STONE & WEBSTER NS$$r GENERAL ELECTRIC CONSTRUCTOR:
STONE 8 WEBSTER NRC LPM:
R. L. PERCH REACTOR TYPE:
DER (MWE):
0934 IE RESIDENT INSPECTOR:
A.
B. BEACH l
IN5PECTION S T A T U S:
FUEL L0AD DATE CHANGE 5 l
TIME PERIOD AS REPQRTED BY UT ILITY l
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE
[
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
l 05-19-78 INDEF.
INDEFINITE DELAY CONTINUES DUE TO FINANCIAL CONSIDERATIONS.
l Inspection reports are available at local PDRs.
t L0 CAL PUBLIC D0CUMENT R 0 0 M:
AUDUBON LIBRARY GOVERNMENT DOCUMENTS DEPT.
WEST FELICIANA BRANCH LOUISIANA STATE UNIVERSITY FERDINAND STREET BATON ROUGE. LOUISIANA 70803 ST. FRANCISVILLE. LA 70775 s
C0N5TRUCT20N
$VATUS REPORT PAGE NO: 3-101 RIVER BEND 2 NUCLEAR POWER PLANTS STATUS AS OF 83-31-82 C0NSTRUCTION STATU$*
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
N/S DEFINED IN CP: (EARLIEST) 03-31-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
N/S (LATEST) 03-31-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
1%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: INDEFINITE DELAY DUE TO FINANCIAL CONSIDERATIONS.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
N/S PLACE STRUCTURAL CONCRETE:
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD l
C0NSTRUCTION STA TUS REP 0RV PAGE NO: 2-102 SAN CHOFRE 3 NUCL EAR POWER PLAN TS STATUS AS OF 03-31-82 PLANT CHARACT ERISTI C S:
KEY P E R S O N N E La DOCKET NO:
05000362 CORPORATE CONTACT:
DR. L.
T. PAPAf, VICE PRESIDENT CP NO. 8 DATE ISSUED:
CPPR-98 / 10-18-73 ADVANCED ENGINEERING CP EXPIRATION DATE:
06-01-81 CORPORATE ADDRESS:
2244 WALNUT CROVE AVENUE APPLICANT:
SOUTHERN CALIFORNIA EDISON ROSEMEAD, CALIFORNIA 91770 PLANT LOCATION:
5 MI S OF SAN CLEMENTE, CA IE REGION:
5 CORPORATE PHONE NO:
(213) 592-1472 AE:
BECHTEL NSSS:
COMBUSTION ENGINEERING CONSTRUCIOR:
BECHTEL HRC LPM:
H. ROOD REACTOR TYPE:
DER (MWE)r 1100 IE RESIDENT INSPECTOR:
R. J. PATE I NSP ECT ION STA TUS FUEL L0AD DA T E CHANGES TIME PERIOD AS REPORTED BY UTILITY Jan. 1982 - Mar. 191,2 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPOPTED BY UTILITY NVMB(8 0F IN5P.
OF INSP.
11-14-74 11-00-80 ISSUANCE OF A PERMIT BY THE CALIFORNIA 82-01 01-04-82 01-05-82 COASTAL COMMISSION.
l 82-02 01-25-82 01-29-82 12-12-74 03-09-81 NO REASON NOTED.
i 82-03 02-22-82 02-26-82 10-22-75 05-00-81 LABOR DIFFICULTIES.
l 82-04 03-08-82 03-12-82 02-00-80 11-00-81 NO REASON PROVIDED.
02-18-81 09-00-82 NO REASON PROVIDED.
l Inspection Reports are available at local PDRs.
09-30-81 11-01-a? NO REASON PROVIDED.
l L 0 CAL PUBLIC D0CUMENT R 0 0 Mr I
MISSION VIEJO BRANCH LIBRARY 24851 CHRISANTA DRIVE l
MISSION VIEJO, CALIFORNIA 92676 e
C0NSTRUCT ION
$TATUS REPORT PAGE NO: 2-103 SAN ONOFRE 3 NUCL EA R POWER PLAN TS STATUS AS OF 03-31-82 C0N5 7RUCT ION STA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
11-01-82 APPLICANTS CONSTRUCTION COMPLETI0H ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
09-00-82 DEFINED IN CP: (EARLIEST)
APPLICAHT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-00-80 (LATEST) 03-02-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 08-16-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 87%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iTART COMPLETION
[0MPLETION % COMPLETE MOBILIZE AHD PREPARE SITE:
02-07-74 10-07-74 100%
PLACE STRUCTURAL CONCRETE:
11-24-74 06-16-75 100%
INSTALL REACTOR PRESSURE VESSEL:
12-19-77 12-23-77 100%
INSTALL LARGE BORE PROCESS PIPE:
04-01-77 12-00-81 99%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
09-01-77 03-00-82 96%
INSTALL SMALL BORE PIPE:
01-01-77 03-00-82 99%
INSTALL CABLE TRAY:
02-01-77 09-30-81 100%
INSTALL EXPOSED NETAL CONDUIT:
06-01-77 04-00-82 99%
IHSTALL POWER, COHTROL, INSTRUMENTATION AND SECURITY CABLE:
02-15-78 05-00-82 92%
INSTALL ELECTRICAL TERMINATIDHS:
02-01-79 06-00-82 84%
C0HDUCT REACTOR COLD HYDROSTATIC TEST:
03-10-82 03-23-82 0%
CONDUCT F.'JT FUNCTIONAL TEST:
06-04-82 07-28-82 0%
CONDUCT PREOP AND ALCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
08-01-81 10-15-82 0%
l l
l l
l d
Y
C0N5TRUCT ION
$TAVUS REPQRT PAGE NO: 2-104 SEABROOK t NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:
05000443 CORPORATE CONTACT:
W. C. TALLMAN, CHIEF EXEC. OFFICER CP NO. 8 DATE ISSUED: CPPR-135/ 07-07-76 CP EXPIRATION DATE:
06-30-83 CORPORATE ADDRESS:
1000 ELM STREET APPLICANT:
PUBLIC SERVICE OF HEW HAMPSHIRE MANCHESTER, NEW HAMPSHIRE 03105 PLANT LOCATION:
10 MI S OF PORTSMOUTH, NH IE REGICH:
1 CORPORATE PHONE NO:
(603) 669-4000 AE UNITED ENG. 8 CONSTRUCTORS NSSS:
WES11HGHOUSE CONSTRUCTOR:
UNITED ENG. & CONSTRUCTORS HRC LPM:
L. WHEELER REACTOR TYPE:
DER (MWE):
1198 IE RESIDENT INSPECTOR:
A.
C. CERNE IN5PECTION STATU5:
FUEL L0AD DA TE CHANGES TIME PERIOD A.S REPORTED BY UTILIT Y Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP, 09-06-77 09-01-82 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 82-01 01-11-82 02-12-82 APPROVAL OF ONCE THROUGH CIRCULATING 82-02 02-16-82 03-22-82 WATER SYSTEM 8 $UBSEQ. NRC WITHDRAWAL OF CONST PERf1IT, 8 TIME REQ TO REMOBILIZE 11-08-78 01-01-83 SCHEDULE REEVALUATION.
04-04-81 11-30-83 SCHEDULE REEVALUATION.
Inspection Reports are available at Iocal PDRs.
l l
L0 CAL PUBLIC D0CUMENT R 0 0 Mt EXETER PUBLIC LIBRARY FRONT STREET EXETER, NEW HAMPSHIRE 03883 3
m
C0N$T RUCT ION STA TU$
REPORT PAGE NO: 2-105 SEABROOK 1 hUCL EAR POWER PLA N T$
STATUS AS OF:
03-31-82 l
C0HS TRUCT IOH S T A T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
11-3e-81 APPLICANTS COMSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIGUS ESTIMATED FUEL LOADING DATE:
01-01-82 DEFINED IN CP: (EARLIEST) 02-00-79 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
08-01-81 (LATEST) 06-00-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIGH DATE: 02-28-86 CURRENT ESTIMATED PERCENT CONST90CTION COMPLETE: 63%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
i l
ESTIMATED ACTUAL ESTIMATED ACTUAL E5TIMATED START START COMPLETIQM
[0MpLETION % C05PLETE MOBILIZE AND PREPARE SITE:
07-00-76 08-00-77 08-00-77 100%
l PLACE STRUCTURAL CONCRETE:
09-00-77 08-00-83 83%
INSTALL REACTOR PRESSURE VESSEL:
05-00-81 05-00-81 100%
INSTALL LARGE BORE PROCESS PIPE:
10-00-79 09-00-83 46%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
10-00-79 09-00-83 34%
INSTALL SMALL BORE PIPE:
09-00-80 09-00-83 9%
IHSTALL CABLE TRAY:
09-00-79 12-00-82 60%
INSTALL EXPOSED METAL CONDUIT:
04-00-79 07-00-83 43%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
05-00-81 07-00-83 23%
INSTALL ELECTRICAL TERMINATIONS:
06-00-81 08-00-83 12%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
07-00-83 07-00-83 0%
CONDUCT HOT FUNCTIONAL TEST:
08-00-83 09-00-83 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
02-00-82 11-00-83 0%
s e
d k'
C0N5T RUCT ION STATUS REPORT PAGE NO: 2-106 NUCL EA R POWER PLANTS STATUS AS OF:
03-31-82 SEADROOK 2 PL A N T CHARACTER IST I C S:
K EY P E R 0 0 N N E L:
DOCKET NO:
05000444 CORPORATE CONTACT:
W. C. TALLMAN, PRESIDENT CP NO.
- DATE ISSUED:
CPPR-136/ 07-07-76 CP EXPIRATION DATE:
10-31-84 CORPORATE ADDRESS:
1000 ELM STREET APPLICANT:
PUBLIC SERVICE OF NEW HAMPSHIRE l
MANCHESTER, NEW HAMPSHIRE 03105 PLANT LOCATION:
10 MI S OF PCRTSMOUTH, NH CORPORATE PHONE NO:
(603) 669-4000 IE REGION:
1 AE:
UNITED ENG. & CONSTRUCTORS NSSS:
WESTINGHOUSE CONSTRHCTOR:
UNITED ENG. & CONSTRUCTORS NRC LPM:
L. WHEELER REAC10R TYPE:
IE RESIDENT INSPECTOR:
A. C. CERNE DER (MWE):
1198 INSP ECT ION $TA T U S:
FUEL L0AD DA TE CNANGES TIME PERIOD AS REPORTED BY UT ILITY Jan, 1982 - Mar. 1982 REPORT HEW REASON FOR CHANGE REPCRT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP, OF INSP.
09-06-77 09-01-84 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 82-01 01-11-82 02-12-82 APPROVAL OF ONCE THROUGH CIRCULATING WATER SYSTEM & SUBSEQ. HRC WITHDRAWAL OF 82-02 02-16-82 03-22-82 CONST PERMIT, 8 TIME REQ TO REMOBILIZE 11-08-78 11-01-84 SCHEDULE REEVALUATION.
1 04-04-81 02-26-86 SCHEDULE REEVALUATION.
l Inspection Reports are available at local PDRs.
l L 0CA L PUB t IC D0CUMEN T R 0 0 M:
EXETER PUBLIC LIBRARY FRONT STREET EXETER, NEW HAMPSHIRE 03883
C0NSTRUCVION STAVUS REP 0RT PAGE NO: 2-107 SEABROOK 2 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 C0NSTRUCT ION 5TA TUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
02-28-86 APPLICANTS CONSTRUCTION COMPLETION ESTINATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-01-84 DEFINED IN CP: (EARLIEST) 01-00-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-83 (LATEST) 10-00-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE 05-31-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
12%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
07-00-76 08-00-77 100%
PLACE STRUCTURAL CONCRETE:
08-00-81 07-00-85 31%
INSTALL REACTOR PRESSURE VESSEL:
08-00-83 09-00-83 0%
INSTALL LARGE BORE PROCESS PIPE:
01-00-83 02-00-86 0%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND $NUBBERS:
01-00-83 02-00-86 0%
INSTALL SMALL BORE PIPE:
12-00-83 02-00-86 0%
INSTALL CABLE TRAY 06-00-83 04-00-85 0%
INSTALL EXPOSED METAL CONDUIT:
01-00-83 07-00-85 0%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
10-00-83 07-00-85 0%
INSTALL ELECTRICAL TERMINATIONS:
11-00-83 08-00-85 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
10-00-85 10-00-85 0%
CONDUCT NOT FUNCTIONAL TEST:
12-00-85 01-00-86 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
05-00-84 02-00-86 0%
C0N5TRUCTI ON STATUS REPORT PAGE N0: 2-10G SHOREHAM NUCL EA R POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERIST I C St KEY P E R S 0 N N E L:
DOCKET NO:
05000322 CCRPORATE CONTACT:
M.
S. POLLOCK, VICE PRESIDENT CP HO. 4 DATE ISSUED:
CPPR-95 / 04-14-73 I
CP EXPIRATION DATE:
03-31-83 CORPORATE ADDRESS:
175 EAST OLD COUNTRY ROAD APPLICANT:
LONG ISLAND LIGHTING CO.
HICKSVILLE, NEW YORK 11801 PLANT LOCATION:
BROOKHAVEN, NY (LI)
IE REGION:
1 CORPORATE PHONE NO:
(516) 733-4013 AE2 STONE 8 WEBSTER HSSS:
GENERAL ELECTRIC CONSTRUCTOR:
STONE 1 WEBSTER NRC LPM:
J.
N.
WILSON i
REACTOR TYPE:
L.
HARROW DER (MWE):
0849 IE RESIDENT INSPECTOR:
J. C. HIGGINS INSP ECTION STA T U St FUEL L0A D DA TE CHANGES TIME PERIOD AS REPORTED BY UT IL I T Y:
l Jan, 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE i
I REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY U.TILITY NUMBE8 0F INSP, OF INSP.
l 02-20-74 12-00-77
1 82-01 01-04-82 01-08-82 CRITERIA RESULTED IN 2 MONTHS 82-02 01-01-82 01-31-82 ADDITIONAL EFFORT IN THE INSTALLATICH 82-03 01-12-82 01-15-82 0F PRIMARY CONTAINMENT 4 PRV PEDESTAL.
82-04 02-08-82 02-26-82
- 2. DIFFICULTIES ENCOUNTERED DURING CON-82-05 02-01-82 03-29-82 STRUCTION OF PRIMARY CONTAINMENT WALL 82-06 03-08-82 03-12-82 4 RPV PEDESTAL AND IMBEDMENT FOR PIPE 82-07 03-15-82 03-17-82 BREAK INSIDE CONTAINMENT.
11-10-75 12-00-78 1 LABOR STRIKES, UNAVAILABILITY OF MATERIAL, WEATHER 4 CONSTRUCTION DIFFICULTIES HAJE RESULTED IN A 12 Inspection Reports are available at local PDRs.
MONTH DELAY.
09-21-77 03-00-80 1 LATE DELIVERY OF PURCHASED MATERIAL (PIPING AND VALVES).
2.
LOWER THAN EXPECTED LABOR PRODUCTIVITY 3.
DESIGN CHANGES DUE TO REG. REQUIREMENTS 01-10-79 06-00-80 MANPOWER CONSTRAINTS AND DESIGN-PROCUREMENT PROBLEMS.
02-00-80 11-00-80 NO REASON PROVIDED.
06-19-80 05-00-82 DELAY DUE TO COMPLETION OF SYSTEMS.
06-09-81 09-00-82 DELAY DUE TO COMPLETION OF SYSTEMS.
L0CA L PUBL IC D0CUMENT R 0 0 Ms SHOREHAM-WADING RIVER PUBLIC LIBRARY ROUTE 25A SHOREHAM, NEW YORK 11786
~
C0NSTRUCTION STA TUS REPORV PAGE ND: 2-109 Sh0REHAM NUCL EAR POWER PLANTS STATUS AS OF:
03-31-G2 C0NSTRUCTION STA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
09-23-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
05-00-82 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
03-00-77 (LATEST) 09-00-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 03-31-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 38%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIhATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
11-00-72 03-00-73 100%
PLACE STRUCTURAL CONCRETE:
03-00-73 12-00-77 100%
INSTALL REACTOR PRESSURE VESSEL:
03-00-75 12-00-75 100%
INSTALL LARGE BORF PROCESS PIPE:
05-00-75 10-00-79 100%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
07-00-75 09-00-82 91%
INSTALL SMALL BORE PIPE:
05-00-75 09-00-82 95%
INSTALL CABLE TRAY:
02-00-76 09-00-82 99%
INSTALL EXPOSED METAL CONDUIT:
02-00-76 09-00-82 96%
INSTALL POWER, CONTROL, INSTRUMENTATIOH AND SECURITY CABLE:
06-00-76 09-00-82 95%
INSTALL ELECTRICAL TERMINATIONS:
06-00-76 09-00-82 92%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
10-00-79 10-00-79 10-00-79 100%
CONDUCT HOT FUNCTIONAL TEST:
N(A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
01-00-80 09-00-82 61%
C0N $TRUCT ION ST A TUS REPOR T PAGE NO: 2-110 SOUTH TEXAS 1 NUCL EAR POWER PLA NTS STATUS AS OFr 03-31-32 PL AN T CHARACT ERIST I C St KEY P ERS0NN E La DOCKET NO:
0$000498 CORPORATE CONTACT:
J.
H.
GOLDBERG, VICE PRESIDENT CP NO. 4 DATE ISSUED:
CPPR-128/ 12-22-75 NUCLEAR ENGINEERING & CONSTRUCTION CP EXPIRATION DATE:
05-31-82 CORPORATE ADDRESS:
P.
O. BOX 1700 APPLICANT:
HOUSTON LIGHTING AND POWER COMPANY HOUSTON, TEXAS 77001 PLANT LOCATION:
12 MI SSW OF BAY CITY, TEX IE REGION:
4 CORPORATE PHONE NO:
(711) 486-3828 AE BECHTEL NSSS:
WESTINGHOUSE CONSTRUCTOR:
FSASCO NRC LPM:
D. SELLS REACTOR TYPE:
Nw IE PROJECT INSPECTOR:
DER (MUE):
1250 IE RESIDENT INSPECTOR:
W. HILL IS SP ECT I ON STA U S:
FUEL L0AD DATE CHAN GES TIME PERIOD AS REP 0RTED BY UT IL I T Yi Jan, 1952 - Mar, 1932 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE EATE SCHEDULE REPORTED BY UTILITY NUMPER OF INSP.
OF INSP.
10-30-78 11-00-81 SCHEDULE REEVALUATION.
8201 01-11-82 01-31-82 Ot-18-80 09-00-83 SCHEDULE REEVALUATION.
11-18-81 N/A NA : NOT AVAILABLE i
Inspection reports are available at local PDRs.
L 0CA L PU BL IC D0CUMENT R 0 0 Mr M*TAGORDA COUNTY LAW LIBRARY P.
O.
BOX 457 BAY CITY. TEXAS 77414 I
I
C0NSTRUCT20N SVATUS REP 0RT PAGE ND: 2-111 SOUTH TEXAS 1 MUCLEAR POWER PLANV5 STATUS AS OF:
03-31-02 C0NSTRUCTIOH STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LC4 DING DATE:
N/A APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL L'OADING DATE:
09-01-83 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
0S-01-80 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/A CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 45%
COMMENTS REGA1 DING CURRENT CONSTRUCTION STATUS: SCHEDULE BEING RE-EVALUATED.
N/A = NOT AVAILABLE.
ESTIt1ATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START
[pMPLETION
[QMPLETIQH 3_$0MPLETE MOBILIZE AND PREPARE SITE:
09-00-75 12-00-75 100%
PLACE STRUCTURAL CONCRETE:
04-00-76 NA NA INSTALL REACTOR PRESSURE VESSEL:
09-00-79 09-00-79 100%
INSTALL LARGE BORE PROCESS PIPE:
10-00-78 NA NA INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
10-00-78 NA NA INSTALL SMALL BORE PIPE:
10-00-78 NA NA INSTALL CABLE TRAY:
10-00-78 NA NA INSTALL EXPOSED METAL CONDUIT:
07-00-78 NA NA INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
NA NA NA INSTALL ELECTRICAL TERMINATIONS:
NA NA NA CONDUCT REACTOR COLD NYDR0 STATIC TEST:
NA NA NA CONDUCT HOT FUNCTIONAL TEST:
NA NA NA CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
NA NA NA
C0NSTRUCT ION STA TUS REPORT PAGE NO: 2-112 SOUTH TEXAS 2 NUCL EAR POWER PLAN TS STATUS AS OF 03-31-82 PLANT CHARACTER ISTICSt KEY P E R S 0 N N E La DOCKET NO:
05000499 CORPORATE CONTACT:
J.
H.
GOLDBERG, VICE PRESIDENT CP HO. & DATE ISSUED:
CPPR-129/ 12-22-75 NUCLEAR ENGINEERING & CONSTRUCTION CP EXPIRATION DATE:
10-31-83 CORPORATE ADDRESS:
P.
O.
BUX 1700 APPLICANT:
HOUSTON LIGHTING AND POWER COMPANY HOUSTON, TEXAS 77001 PLANT LOCATION:
12 MI SSW OF BAY CITY, TEX IE REGICH:
4 CORPORATE PHONE NO:
(713) 486-3828 AE BECHTEL NSSS:
WESTINGHOUSE CONSTRUCTOR:
EBASCO NRC LPM:
D. SELLS REACTOR TYPE:
P!JR IE PROJECT INSPECTOR:
DER (MWE):
1250 IE RESIDENT INSPECTOR:
W. HILL l
INSPECT ION STA TUS FUEL L0A D DA T E CHANGES l
TIME PERIOD AS REPORTED BY UTILI TY Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
10-30-'78 11-00-82 SCHEDULE REEVALUATION.
8201 01-11-82 01-31-82 01-18-80 09-00-85 SCHEDULE REEVALUATION.
11-18-81 N/A N/A : NOT AVAILABLE.
Inspection reports are available at local PDRs.
i L0 CAL PUBLIC D0CUMENT R 0 0 Mr MATAGORDA COUNTY LAW LIBRARY P.
O.
BOX 487 BAY CITY, TEXAS 77414
C0N STRUCTION STA TUS REPQR T PAGE NO: 2-113 SOUTH TEXAS 2 NUCLEAR PONER PLANTS STAVUS AS OFs 03-31-82 C0N STRUCT ION
$T A T U St APPLICAHT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/A APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICAHT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
09-01-85 DEFIHED Id CP: (EARLIEST)
APPLICINT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-81 (LATEST)
APPLICiNT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/A CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
18%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: SCHEDULE BEING iE-EVALUATED.
H/A : NOT AVAILABLE.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION
[pMPLETION % COMPL'ET E MOBILIZE AND PREPARE SITE:
09-00-75 12-00-75 100%
plt.CE STRUCTURAL CONCRETE:
03-00-77 NA NA INSTALL REACTOR PRESSURE VESSEL:
NA NA HA INSTALL LARGE BORE PROCESS PIPE:
NA NA NA INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
NA NA NA INSTALL SMALL BORE PIPE:
NA NA NA INSTALL CABLE TRAY:
NA NA NA INSTALL EXPOSED METAL CONDUIT:
NA NA NA INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:
NA NA NA INSTALL ELECTRICAL TERMINATIONS:
NA NA NA CONDUCT REACTOR COLD HYDROSTATIC TEST NA NA NA CONDUCT HOT FUNCTIONAL TEST:
NA NA NA CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
NA NA NA
C0NSTRUCT ION STATUS REPORY PAGE NO: 2-114 ST LUCIE 2 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 PL ANT CHARACTERIST I C St KEY PERS0NN E L:
DOCKET NO:
05000389 CORPORATE CONTACT:
R.
E. UHRIG, VICE PRESIDENT CP NO. 8 DATE ISSUED:
CPPR-144/ 05-02-77 HUCLEAR AFFAIRS CP EXPIRATION DATE:
CORPORATE ADDP~.SS:
P. O.
BOX 529100 APPLICANT:
FLORIDA POWER 8 LIGHT MIAMI, FLORIDA 33152 PLANT LOCATION:
12 MI SE OF FT. PIERCE. FLA IE REGION:
2 CORPORATE PHONE N0s.
(305) 552-3842 AE:
EBASCO NSSS:
COMBUSTION ENGINEERING CONSTRUCTOR EBASCO NRC LPM:
V.
HERSES REACTOR TYPE:
DER (MWE):
0842 IE RESIDENT INSPECTOR:
S.
A.
ELROD INSPECTION STATUS
. FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITYr Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMB [R OF INSP.
OF INSP.
03-24-77 06-00-83 1 LWA HALTED BY COURT ORDER.
6201 03-09-82 03-12-82
- 2. CP WAS ANTICIPATED 03-01-75 BUT 8202 02-02-82 02-05-82 EARLIEST ANTICIPATED DATE 06-01-77.
8203 01-11-82 02-12-82 03-01-78 10-28-82 1 FROJECT AUTHORIZED TO USE TWO SHIFTS.
8204 02-13-82 03-10-82 8205 02-10-82 02-11-82 8207 02-16-82 02-19-82 8208 02-23-82 02-23-82 8209 03-01-82 03-05-82 8210 03-09-82 03-12-82 8211 03-09-82 03-12-82 8212 03-17-82 03-19-82 Inspection reports are available at local PDRs.
L0CA L POBLIC D0CUMENT R 0 0 M:
INDIAN RIVER JUNIOR COLLEGE LIBRARY 3209 VIRGINIA AVENUE FT. PIERCE, FLORIDA 33450
C0NSTRUCTION STATUS REPQRV PAGE NO: 2-115 ST LUCIE 3 H U C L E A-R P0WER PLANTS STATUS AS OF 03-31-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
10-28-8; APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-00-83 DEFINED IN CP (EARLIEST) 05-13-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-13-83 (LATEST) 05-13-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 05-13-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 84%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
05-02-77 05-02-77 07-00-77 07-00-77 100%
PLACE STRUCTURAL CONCRETE:
07-06-77 07-07-77 10-05-81 09-18-81 100%
INSTALL REACTOR PRESSURE VESSEL:
06-18-80 06-22-80 12-21-81 12-06-81 100%
INSTALL LARGE BORE PROCESS. PIPE:
09-00-78 10-00-78 04-30-82 95%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
09-00-78 11-00-78 07-02-82 76%
INSTALL SMALL BORE PIPE:
10-00-78 11-00-78 06-30-82 89%
IHSTALL CABLE TRAY:
10-30-78 02-00-79 05-30-82 98%
INSTALL EXPOSED METAL CONDUIT 01-05-79 02-00-79 11-30-82 90%
INSTALL POWER, CONTROL, INSTRUMENTATION AHD SECURITY CABLE:
01-30-79 05-00-79 11-30-82 71%
INSTALL ELECTRICAL TERMINATIONS
- 05-00-79 08-00-79 12-30-82 48%
CONDUCT REACTOR COLD HYDROSTATIC TEST 03-17-82 04-28-82 0%
CONDUCT HOT FUNCTIONAL TEST:
07-03-82 08-11-82 0%
CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LDAD:
04-20-80 03-19-80 10-27-82 43%
C0NSTRUCT I0N STA *US REPORT PAGE HO: 2-116 SUMMER 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLA N T CHA RA CTER I ST I C S:
KEY PERS0NN E L:
DOCKET NO:
05000395 CORPORATE CONTACT:
E. H.
CREWS.
JR.,
VICE PRESIDENT CP HO. 8 DATE ISSUED:
CPPR-94 / 03-21-73 CONST.
- PROD. ENGINEERING CP EXPIRATION DATE:
01-01-78 CORPORATE ADDRESS:
P.
O.
BOX 764 APPLICANT:
SOUTH CAROLINA ELECTRIC 3 GAS CO.
COLUMBIA, SOUTH CAROLINA 29218 PLANT LOCATION:
26 MI NW OF COLUMBIA, SC IE REGION:
2 CORPORATE PHDHE NO:
(803) 748-3268 AE GILBERT ASSOCIATES HSSS:
WESTINGHOUSE CONSTRUCTOR:
DAHIEL INTERNATTOHAL NRC LPM:
W.
KANE REACTOR TYPE:
DER (MWE):
0900 IE RESIDENT INSPECTOR:
J. SK0LDS INSPECTION STA TUS FUEL L0AD DA T E CHANGES i
TIME PERIOD AS REPOR TED BY UT I LI T Y:
Jan, 1982 - Mar. 1982 RE*0RT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTTLITY NUMBER OF INSP.
OF INSP.
y 11-12-74 11-01-78 POWER NEEDS DEFERRED; FINANCIAL 8201 01-04-82 01-08-82 DETERMENTS.
8202 01-04-82 01-08-82 01-07-77 11-30-79 NO REASON GIVEN.
1 8204 01-18-82 01-22-82 11-07-78 07-01-80 H0 REASON GIVEN.
8205 01-25-82 01-29-82 01-31-80 12-01-80 NO REASOH GIVEH.
8206 01-05-82 01-31-82 01-31-80 12-01-80 HD REASOH GIVEN.
8207 01-11-82 01-15-82 05-05-80 01-03-80 HD REASON GIVEN.
4 8208 01-12-82 01-15-82 08-00-80 06-00-81 NO REASON GIVEN.
i 5209 01-19-82 01-22-82 01-16-81 08-00-81 NO REASON PROVIDED.
8210 01-12-82 01-15-82 11-25-81 02-00-82 NO REASON PROVIDED.
8211 01-11-82 01-14-82 04-30-82 05-00-82 HD REASON PROVIDED.
8212 01-07-82 01-07-82 8213 01-26-82 01-29-82 8214 01-25-82 01-28-82 8215 01-25-82 01-29-82 8216 02-01-82 02-28-82 8217 02-09-82 02-12-82 8218 02-17-82 02-17-82 8219 03-01-82 03-04-82 8220 03-01-82 03-02-82 8221 02-22-82 02-26-82 8222 03-01-82 03-31-82
.l 8223 02-16-82 02-19-82 8224 03-23-82 03-26-82 8225 05-23-82 03-26-82 8228 03-22-82 03-26-82 L0CA L Pt SL IC D0CUNEN T R 0 0 M:
5 RICHLAND COUNTY PUBLIC LIBRARY 1400 SUMTER STREET
{
COLUMBIA, SOUTH CAROLINA 29201
C0N$T RUCT ION STA TUS REP 0RT PAGE NO: 2-117 SUMMER 1 NUCL EAR POWER PLANTS STATUS AS OF8 03-31-82 C0NSTRUCTION STA T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
05-00-82 APPLICAHTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
02-00-82 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-77 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 11-00-82 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 99%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED' START START COMPLETION COMPLETION % COMPLETE 04-00-73 02-00-74 100%
MOBILIZE AND PREPARE SITE:
03-00-74 02-00-82 03-15-82 100%
PLACE STRUCTURAL CONCRETE:
09-00-77 11-00-77 100%
INSTALL REACTOR PRESSURE VESSEL:
01-00-77 02-00-82 02-01-82 100%
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS RESTRAINTS AND SHUBBERS:
03-00-77 02-00-82 99%
01-00-77 02-00-82 03-31-82 100%
.HSTALL SMALL BORE PIPE:
02-00-77 02-00-82 02-15-82 100%
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
01-00-76 02-00-82 99%
f INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:+
09-00-77 02-00-82 99%
1 INSTALL ELECTRICAL TERMINATIONS:
11-00-77 02-00-82 99%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
11-01-79 11-09-79 100%
CONDUCT HOT FUNCTIONAL TEST:
08-00-80 09-00-80 100%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
06-00-78 02-00-82 95%
1ll ll l
il 8 2 1
8 1
1 2 3
?
3 1
S 0
0 0
N T
1 0
N 8
8 E :
9 G F DO 1
A O
II P
ST A
E S
EC I
H A
RU N
T PR A
S TTV R
U ESEL O
T CNEY F
A IORS T
VCTH S
S SN 1
T
,8 E 8 S Y S
S NP 3
S Y
A....
IGO 5
D E
T T
CDDDD TNT, -
A EI EEEEE RILN 0
O G
I GL RDDDD URIW 7
H H NI OIIII CEMO 7
C R N
L AT FVVVV EAT R
HU OOOO
.NHN
)
E A
I C
DRRRR WI E
5 P G Y
APPPF
.G1 L
1 H T RB O
N0L 2
O LNNNN NE9A
(
R G C U FD OOOO E
DSSSS t
NT EAAAA L
- R T
B AP V
T RO EE EOOOO N
OT A
RR RNNNN R
O TC D
N T
S N
CE D
0 C
S EP E
E 01122 0 A E
E PS L
88888 P
T R
N SN D T U
S S N D
O NI WD 19151 E
O D H
I A
R EE 00010 T
R C A P
T HH R
TN 0 O C
54647 N
E E E E
CE S
00000 T
T T
- ED L
P A
P A
A A
MJI S
R R
R POS E
49011 L
O O
O LRE L
77888 U
F P
P PR R
T P
Y R R
R C
E R
01001 T
O O
O REE OE 13333 E C C
C NII U S PT A
EA 92092 R
K F
A RD 01101 T
E S
W O
N P
O s
R I
D k
P T
A l
C a
E T
c U
H E.
2 222222 o
L G
TP 8 888888 l
R I
AS C
LA DN 2
419956 t
M T
P I
2N001 120 a
U 8
D E-0 S
NF 1P232324 e
H 3
RK EO 0O000000 l
0 N
t 7
EC b
S WI C
a R
0 2 OW I
2 l
C 0
PR R
8 C
E T
9 ia T
I i
AB C
1 E.
22222222 v
f I
E D
TP 88888888 a
N T
NF L
O.
AS e
E 0
1
/
AO E
I r DN 95176798 S
71 1V Ra I
12021110 r
7 308LE LLL EM G
a M
8 I
31 YN EAE S P EF 11212323 1
0 - 1 S TRT BO 00000000 s
U R
0R0NI HEH 2 U E t
0P-NM CNCR5 M2 r
C A
E 5P3E EEEW0 T
I8 o
I 0C0P71BGBB1 T9 p
0 TN T
A 1
D YEV C
T RE 00000000 RRL D
n OB n
ATY A
E:
S a
PM 22222222 o
EU 88888888 i
B N
R ST RN t
I INN SA N
c LIE A
ID e
L LP N
O p
EK H
EN O
s B
EN,
TO I
- E I
n RAE C
AI T
RP I
U FRR
- DT: A:
OY:
T FR O
ATCN TT)
P T
A N4RNOO C E C
UH?
1 T
IALI URW OT -
A T.PC G
N H
EOXITE
- ROM E
L HUS TT(
ROE N
KHELNR SSC P
A ESK A
A C
- SNAR T
L H
OPPPLEESCEE S
C S1I E
L DCCAPIANCRD O7W U
N 0
Q P
S I
L U
S I
llll1lll
C0N5VRUCTION STATUS REP 0RT PAGE NO: 2-119 SUSQUENANNA 1 NUCLEAR POWER PLANTS STATUS AS OF 03-31-02 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
07-01-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
04-15-82 DEFINED IN CP: (EARLIEST) 05-01-79 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-01-79 (LATEST) 12-31-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-15-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 93%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION
[DMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
11-00-73 03-00-74 100%
PLACE STRUCTURAL CONCRETE:
09-00-74 08-00-78 100%
INSTALL REACTOR PRESSURE VESSEL:
02-00-76 10-00-76 100%
INSTALL LARGE BORE PROCESS PIPE:
08-00-74 03-00-82 04-00-82 100%
INSTALL LARGE BORE PIPE HANGERS RESTRAINTS AND SNUBBERS:
08-00-75 05-00-82 96%
INSTALL SMALL BORE PIPE:
08-00-75 03-00-82 04-00-82 100%
INSTALL CABLE TRAY:
09-00-75 03-00-82 04-00-82 100%
INSTALL EXPOSED METAL CONDUIT:
04-00-76 03-00-82 04-00-82 100%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
01-00-78 03-00-82 04-00-82 100%
INSIALL ELECTRICAL TERMINATIONS 01-00-78 05-00-82 99%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
12-00-78 10-00-80 100%
CONDUCT HOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD 12-00-79 06-00-82 82%
l C0Nt RUCT ION STA TUS R EP0R T PAGE NO: 2-120 l
l SUSQUEhANNA 2 NUCL EA R POWER PL AN T S STATUS AS OF:
03-31-82 P LANT CHARACT ER IST I C S:
K EY P E R S 0 N N E L:
DOCKET NO:
05000388 CORPORATE CONTACT:
H.
W.
CURTIS. VICE PRESIDENT CP NO. 8 DATE ISSUED:
CPPR-102/ 11-02-73 ENGINEERING & CONSTRUCTION l
CP EXPIRATION DATE:
09-01-82 CORPORATE ADDRESS:
2 NORTH NINETH STREET l
APPLICANT:
PENHSYLVANIA POWER 8 LIGHT ALLENTCUN, PENNSYLVANIA 18101 PLANT LOCATION:
7 MI NE OF BERWICK, PA IE REGION:
1 CORPORATE PHONE NO:
(215) 770-5381 AE:
BECHTEL NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
BECHTEL NRC LPM:
R.
PERCH REACTOR TYPE:
DER (MWE):
1052 IE RESIDENT INSPECTOR:
G.
G.
RHOADS l
IN SPECTION S T A T U S:
FUEL L 0A D DA T E CH A N GES l
TIME PERIOD A S REP 0R T ED BY UT I L I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPDPTED BY UTILITY NUMSER OF INSP.
OF INSP.
09-10-74 11-01-81 REVISED LOAD FORECASTS FOR THE 1980's.
l 82-01 01-19-82 01-22-82 02-00-80 04-00-82 NO REASON PROVIDED.
82-02 02-01-82 02-04-82 10-30-80 11-00-82 NO REASON PROVIC;7.
l 82-03 02-19-82 02-25-82 09-30-81 07-00-83 NO REASON PROVIDED.
I 12-31-81 01-01-84 NO REASON PROVIDED.
Inspection Reports are available at local PDRs.
l i
L0CA L PUBL IC D0CUMEN T R 0 0 M:
OSTERHOUT FREE LIBRARY 71 SOUTH FRANKLIN STREET WILKES-SARRE, PENNSYLVANIA 18701 AR?
j C0NSTRUCT20N STATUS REPORT PA*f NO: 2-121 SUSQUEHANNA 2 NUCLEAR POWER PLANTS STATUS AS'O'-
03-31-82 C0N$TRUCT ION STATUSi i
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
01-00-84 APPLICANTS CONSTRUCTION COMPLSTION ESTIMATE AS APPLIC4NT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
07-15-83 DEFINED IN CP (EARLIEST) 11-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
11-01-80 (LATEST) 03-31-84 j
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 11-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 65%
1 l
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
5 1
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START SOMPLETION COMPLETIRN % COMPLETE j
MOBILIZE AND PREPARE SITE:
11-00-73 07-00-74 1004 PLACE STRUCTURAL CONCRETE:
10-00-74 09-00-78 100%
l INSTALL REACTOR PRESSURE VESSEL:
12-00-76 07-00-77 100%
INSTALL LARGE BORE PROCESS PIPE:
04-00-82 04-00-82 99%
j INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SNUBBERS:
08-00-77 03-00-83 70%
i j
INSTALL SMALL BORE PIPE:
09-00-75 10-00-82 87' INSTALL CABLE TRAY:
04-00-77 03-00-82 04-00-82 100" I
INSTALL EXPOSED METAL CONDUIT 07-00-75 04-00-82 9 'e t INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
04-00-79 12-00-82 96%
i INSTALL ELECTRICAL TERMINATIONS:
10-00-79 01-00-83 72%
i CONDUCT REACTOR COLD HYDROSTATIC TEST-06-00-80 11-00-52 0%
C0!! DUCT NOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A COHDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:
06-00-84 0%
I t
i e
1 d
C0NSTRUCT ION
$TATUS REP 0RT PAGE NO: 2-122 V0GTLE 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I S T I C S:
KEY PERS0NNEL:
DOCKET NO:
05000424 CORPORATE CONTACT:
D. E. DUTTON, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-108/ 06-28-74 GENERATING PLANT PROJECTS CP EXPIRATION DATE:
04-30-81 CORPORATE ADDRESS:
GEORGIA POWER COMPANY APPLICANT:
GEORGIA POWER 333 PIEDMONT PLANT LOCATION:
25 MI SSE OF AUGUSTA, GA ATLANTA, GEORGIA 30302 IE REGION:
2 CORPORATE PHONE NO:
(404) 522-6060 AE:
SOUTHERN SERVICES 8 BECHTEL NSSS:
WESTINGHOUSE CONSTRUCTOR:
GEORGIA POWER CD.
NRC LPM:
J. GRANT REACTOR TYPE:
DER (MWE):
1100 IE RESIDENT INSPECTOR:
W. F. SANDERS INSPECT ION STATUS:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED 8Y U T I L I T Y:
j Jan. 1982 - Mar. 1982 1
REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMSfg 0F INSP.
OF INSP.
09-27-74 NOT KNOWN CONSTRUCTION SUSPENDED FOR FINANCIAL 8201 01-73-82 01-07-82 REASONS.
8202 01-12-82 01-15-82 05-11-77 05-00-83 NO REASON GIVEN.
8203 02-09-82 02-12-82 01-09-78 05-01-84 OVERESTIMATED PROJECTED NEED FOR POWER.
8204 01-10-82 02-10-82 07-17-80 11-00-84 NO REASON PROVIDED.
8205 03-09-82 03-12-82 11-18-81 09-01-86 SCHEDULE REASSESSMENT.
8206 02-11-82 03-11-82 Inspection reports are available at local PDRs.
I l
L0 CAL PUBLIC D0CUMENT R 0 0 M:
BURKE COUNTY LIBRARY 4TH STREET WAYNESBORD, GEORGIA 30830
''-::::_._.....:'A.
C0NSTRUC I ION 5VATUS REP 0RY PAGE NO: 2-123 UOGTLE 1 NUCLEAR P0WER PLAHT3 STATUS AS OF:
03-31-82 C0N5TRUCT IOH S T A T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
09-01-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-00-84 DEFINED IN CP: (EARLIEST) 04-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-79 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 03-01-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 29%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETIQ3 %_$QMPLET:
MOBILIZE AND PREPARE SITE:
08-01-76 09-15-77 100%
PLACE STRUCTURAL CONCRETE:
09-01-78 02-15-84 54%
INSTALL REACTOR PRESSURE VESSEL:
02-01-83 03-15-83 0%
INSTALL LARGE BORE PROCESS PIPE:
09-01-80 05-01-86 11%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
09-01-80 05-01-86 5%
INSTALL SMALL BORE PIPE:
07-01-81 05-01-86 1%
INSTALL CABLE TRAY:
08-01-80 09-01-85 10%
INSTALL EXPOSED METAL CONDUIT 11-01-81 01-01-86 0%
INSTALL POWER, COHTROL, INSTRUMENTATION AND SECURITY CABLE:
03-01-83 11-01-85 0%
INSTALL ELECTRICAL TERMINATIONS:
05-01-83 01-01-86 04 CONDUCT REACTOR COLD HYDROSTATIC TEST:
03-01-86 04-01-86 0%
CONDUCT HOT FUNCTIONAL TEST:
05-15-86 07-15-86 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
07-24-84 08-01-86 0%
C0NSTRUCVION STATUS REPQRT PAGE NO2 2-124 UOGTLE 2 NUCLEAR POWER PLANTS STATUS AS oft 03-31-82 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000425 CORPORATE CONTACT:
D.
E. DUTTON, VICE PRESENT CP NO. & DATE ISSUED: CPPR-109/ 06-28-74 GENERATING PLANT PROJECTS CP EXPIRATION DATE 04-30-82 CORPORATE ADDRESS GEORGIA POWER COMPANY APPLICANT GEORGIA POWER 333 PIEDMONT PLANT LOCATION:
25 MI SSE OF AUGUSTA, GA ATLANTA, GEORGIA 30302 IE REGION:
2 CORPORATE PHONE NO:
(404) 522-6060 AE SOUTHERN SERVICES & BECHTEL HS$$1 WESTINGHOUSE CONSTRUCTOR:
GEORGIA POWER CO.
NRC LPM:
J. GRANT REACTOR TYPE PWR IE PROJECT INSPECTOR:
DER (MWE)*
1100 IE RESIDENT INSPECTOR
- W.
F. SANDERS INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY
- Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPCRT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
09-27-74 NOT KNOWN CONSTRUCTION SUSPENDED FOR FINANCIAL 8201 01-05-82 01-07-82 REASONS.
8202 01-12-82 01-15-82 05-11-77 05-00-84 NO REASON GIVEN.
8203 02-09-82 02-12-82 11-02-77 05-00-85 OVERESTIMATED PROJECTED NEED FOR POWER.
8204 01-10-82 02-10-82 07-17-80 05-00-87 NO REASON PROVIDED.
8205 03-09-82 03-12-82 11-18-81 03-01-88 SCHEDULE REASSESSMENT.
8206 02-11-82 03-11-82 Inspection reports are available at local PDRs.
l l
i l
l L0 CAL PUBLIC D0CUMENT R 0 0 M:
BURKE COUNTY LIBRARY 4TH STREET WAYNESBORD, GEORGIA 30830 I
C0NSTRUCTION
$VAVUS REPQRV PAGE NO: 2-125 V0GTLE 2 NUCLEAR P0WER PLANVS SVATUS AS OF:
03-31-82 C0NSTRUCTION STA TUS APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
03-01-88 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
05-00-87 DEFINED IN CP* (EARLIEST) 04-01-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-80 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 09-01-88 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE $
10%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMA1ED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION
[QMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
08-01-76 09-15-77 100%
PLACE STRUCTURAL CONCRETE:
02-17-81 08-15-84 40%
INSTALL REACTOR PRESSURE VESSEL:
08-01-84 09-15-84 0%
INSTALL LARGE BORE PROCESS PIPE:
09-01-80 11-01-87 10%
INST ALL LARGE BORE PIPE HANGERS RESTRAINTS AND SHUBBERS:
09-01-80 11-01-87 0%
INSTALL SMALL BORE PIPE:
02-01-83 01-04-82 04-01-88 0%
INSTALL CABLE TRAY:
08-01-80 10-01-86 5%
INSTALL EXPOSED METAL CONDUIT:
03-01-83 07-01-87 0%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
09-01-84 05-01-87 0%
INSTALL ELECTRICAL TERMINATIONS:
11-01-84 07-01-87 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST 09-01-87 10-01-87 0%
CONDUCT HOT FUNCTIONAL TEST:
12-1S-87 02-15-88 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
01-24-86 02-01-88 0%
C0NSTRUCT IOH
$TATUS REPORT PAGE NO: 2-126 WASHINGTON NUCLEAR 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 4
PLANT CHARACTERIST I C S:
KEY PERS0NNEL:
DOCKET NO:
05000460 CORPORATE COHTACT:
R. L. FERGUSON, MANAGING DIRECTOR CP NO. 8 DATE ISSUED:
CPPR-134/ 12-24-75 CP EXPIRATION DATE:
01-01-82 CORPORATE ADDRESS:
P. O. BOX 968 APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM RICHLAND, WASHINGTON 99352 PLANT LOCATION:
30 MI HW OF RICHLAND, WASH IE REGION:
5 CORFORATE PHONE NO:
(509) 372-5000 AE:
UNITED ENG. 8 CONSTRUCTORS NS$$:
BABCOCK & WILCOX CONSTRUCTOR:
BECHTEL NRC LPM:
R. HERHAN REACTOR TYPE:
P. P. HARBUT DER (MWE):
1267 IE RESIDENT INSPECTOR:
A. TOTH INSPECT ION STA TUS:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITYi Jan, 1982 - Mar, 1982 REPORT HEW REASON FOR CHANGE REPOPT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBLR OF THSP.
OF INSP.
04-15-76 08-00-80 REASON FOR CHANGE NOT REPORTED BY THE 82-01 01-01-82 01-30-82 UTILITY.
82-02 02-01-82 02-28-82 09-00-76 03-00-81 DELAY IN COMPLETION OF ENGINEERING AND 82-03 01-18-82 02-05-82 LABOR DIFFICULTIES.
82-04 02-22-82 02-26-82 01-00-78 06-00-82
- 1. LABOR PRODUCTIVITY BELOW PLANNED LEVELS 82-05 03-01-82 03-31-82 2.
INCREASE IN PLANNED DURATIONS FOR PIPINC AND ELECTRICAL ACTIVITIES.
3.
EXTENDED DURATION FOR PREOPERATIONAL Inspection Reports are available at local PDRs.
TESTING TO COMMERCIAL CPERATION.
03-07-79 06-00-83 SCHEDULE REEVALUATIDH/ LABOR PRODUCTIVITY BELOW PLAHHED LEVELS.
06-00-80 01-00-84 NO REASON PROVIDED.
12-17-81 08-01-85 NO REASON PROVIDED.
?2-00-81 12-00-85 REEVALUATION OF WORK REMAINING TO COMPLETE FROJECT. TARGET COMPLETI0H DATE IS 8/85.
4 l
l L0 CAL PUBL IC D0CUMENT R 0 0 M:
I l
RICHLAND PUBLIC LIBRARY I
SWIFT AND 110RTHGATE STREETS RICHLAND, uASHINGTON 99352
C0N5TQUCVION 3TAYUS REP 0RT PAGE NO: 2-127 WASH 5NGTON NUCLEAR 1 NUCLEAR POWER PLANY9 STATUS AS OF 03-31-82 C0N5TRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-00-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
08-01-85 DEFINED IN CP (EARLIEST) 01-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
03-00-80 (LATEST) 01-01-82m APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 06-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 61%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: *CP EXTENSION PENDING - NEW ESTIMATES FOR LATEST COMPLETION - JUNE 1,
1986 l
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
08-01-75 08-08-75 100%
PLACE STRUCTURAL CONCRETE:
04-00-76 05-00-82 97%
INSTALL REACTOR PRESSURE VESSEL:
08-31-79 08-31-79 100%
INSTALL LARGE BORE PROCESS PIPE:
08-01-79 03-00-84 82%
INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SHUBEERS:
08-15-79 06-00 59%
INSTALL SMALL BORE PIPE:
04-01-41 09-00-84 27%
INSTALL CABLE TRAY:
01-01-79 08-00-83 82%
INSTALL EXPOSED METAL CONDUIT:
04-01-81 09-00-84 32%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
08-07-81 12-00-84 13%
l INSTALL ELECTRICAL TERMINATIONS:
10-06-81 02-00-85 2%
1 CONDUCT REACTOR COLD HYDROSTATIC TFST:
06-00-85 06-00-85 0%
CONDUCT NOT FUNCTIONAL TEST:
08-00-85 08-00-85 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:
05-00-84 08-00-85 0%
C0N5TRUCTION STATUS REPORV PACE NO: 2-128 WASHINGTON NUCLEAR 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERI$TICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000397 CORPORATE CONTACT:
R.
L. FERGUSON, MANAGING DIRECTOR CP NO. & DATE ISSUED: CPPR-95 / 03-19-73 CP EXPIRATION DATE:
12-01-81 CORPORATE ADDRES$8 P. O. BOX 968 APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM RICHLAND, WASHINGTON 99352 PLANT LOCATION:
30 MI NW OF RICHLAND, WASH XE REGION:
5 CORPORATE PHONE NO:
(509) 372-5000 AE BURNS 8 ROE NSSS:
GENERAL ELECTRIC IE PRINCIPAL INSPECTOR:
CONSTRUCTOR:
BECHTEL HRC LPM:
R.
ALUCK REACTOR TYPE:
DER (MWE):
1103 IE RESIDENT INSPECTOR:
R.
FEIL IHSPECTION S T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UT IL I T Y:
Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
08-15-74 07-00-77 NO REASON NOTED.
82-01 01-11-82 01-15-82 01-10-75 12-00-77 INSUFFICIENT MANPOWER BY MAJOR 82-02 01-08-82 01-31-82 CONSTRUCTOR.
82-03 02-01-82 02-04-82 08-00-75 04-00-78 PERSISTING CIRTICAL PROBLEMS.
82-04 02-08-82 02-12-82 02-00-76 01-00-79 CONTINUED SLIPPAGE BY MAJOR CIVIL AND 82-05 02-01-82 02-28-82 MECHANICAL CONTRACTORS.
82-06 03-01-82 03-05-82 07-31-76 06-15-79 CIVIL CONTRACT DEFAULT AND EXTENDED 82-07 03-01-82 03-31-82 LABOR DISPUTE.
10-12-76 12-00-79 CONTINUED SLIPPAGE BY MAJOR CIVIL AND Inspection Reports are available at local PDRs.
MECHANICAL CONTRACTOR AND CONTINUING PIPE FITTER STRIKE.
01-17-77 03-00-80 PIPE FITTER STRIKE.
04-27-79 03-00-81 SCHEDULE REEVALUATION 06-00-80 08-00-82 NO REASON PROVIDED.
11-20-81 03-30-83 QUALITY PROBLEMS, LABOR DISPUTE, SCHEDULE RE-EVALUATION.
03-31-82 09-00-83 SCHEDULE RE-EVALUATION.
i L0 CAL PUBLIC D0CUMENT R 0 0 M:
RICHLAND PUBLIC LIBRARY SWIFT AND NORTHGATE STREETS RICHLAND, WASHINGTON 99352
C0NSTRUCTION 5YATUS REPORT
,PAGE NO: 2-129 WASHINGTON NUCLEAR 2 NUCL EAR POWER PLANTS STATUS AS OF:
03-39-82 C0NSTRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
09-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
03-00-83 DEFINED IN CP: (EARLIEST) 12-00-82 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
04-00-77 (LATEST) 02-00-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE. 02-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 89%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iT A ll_
COMPLETION
$2MPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
08-03-72 05-00-73 100%
PLACE STRUCTURAL CONCRETE:
05-00-73 03-00-78 100%
INSTALL REACTOR PRESSURE VESSEL:
03-00-77 100%
INSTALL LARGE BORE PROCESS PIPE:
07-00-75 09-00-82 97%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
07-00-75 12-00-82 90%
INSTALL SMALL BORE PIPE:
07-00-75 11-00-82 86%
INSTALL CABLE TRAY:
02-00-75 100%
INSTALL EXPOSED METAL CONDUIT 02-00-75 12-00-82 88%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-00-75 01-00-83 92%
INSTALL ELECTRICAL TERMINATI0HS:
02-00-75 01-00-83 75%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
08-00-82 0%
CONDUCT HOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
09-00-82 09-00-83 0%
C0NSTRUCTION STATUS REP 0RT PAGE ND: 2-130 WASHINGTON NUCLEAR 3 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERIST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000508 CORPORATE CONTACT:
R. L. FERGUSON, M5NAGING DIRECTOR CP HO. 4 DATE ISSUED:
CPPR-154/ 04-11-78 CP EXPIRATION DATE:
01-01-83 CORPORATE ADDRESS:
P. O. BOX 968 APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM RICHLAND, WASHINGTON 99352 PLANT LOCATION:
26 MI W OF OLYMPIA, WA IE REGION:
5 CORPORATE PHONE NO:
(509) 372-5000 AE EBASCO HSSS:
COMBUSTION ENGINEERING CONSTRUCTOR:
EBASCO NRC LPM:
L. WHEELER REACTOR TYPE:
DER (MWE):
1242 IE RESIDENT INSPECTOR:
W. G.
ALBERT IN5PECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITYi Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
05-22-79 06-00-84 SCHEDULE REEVALUATION.
82-01 01-11-82 01-15-82 06-00-80 12-00-85 REASON FOR 18 MONTH SLIP WAS:
82-02 01-01-82 01-31-82 6 MONTHS - DUE TO LATE PIPING START 82-03 02-01-82 02-05-82 12 MONTHS - DUE TG REVISED QUANTITY 82-04 03-01-82 03-19-82 AND PRODUCTIVITY ESTIMATES.
82-05 02-01-82 02-28-82 82-06 03-01-82 03-31-82 11-00-81 08-00-85 FOUR MONTHS SCHEDULE RECOVERY 82-07 03-23-82 03-25-82 BASED ON REASSESSMENT OF PROJECT CAPABILITY AND CONTRACT INCENTIVES Inspection Reports are available at local PDRs.
FOR PRIME CONTRACTORS.
l l
L0 CAL PUBLIC D0CUMENT R 0 0 M:
l W. H. ABEL MEMORIAL LIBRARY 125 MAIN STREET, SOUTH i
MONTESANO, WASHINGTON 98563 l
l C0NSTRUCTION STATUS R EP0RT PAGE NO: 2-131 WASHINGTON NUCLEAR 3 NUCLEAR POWER PLA NT$
STATUS AS OF:
03-31-82 C0NSTRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
08-00-85w APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-00-85 DEFINED IN CP: (EARLIEST) 01-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATd AT CP ISSUANCE:
07-00-83 (LATEST) 01-01-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 02-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE: 50%
COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS: *0FFICIAL PUBLISHED SCHEDULE IS JUNE 1986.
AUGUST 1985 REPRESENTS PROJECT TARGET FUEL LOAD DATE.
ALL ESTIMATED START AND COMPLETION DATES ARE BASED ON THE AUGUST 1985 PROJECT TARGET DATE.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION 1_CpfPLETE MOBILIZE AND PREPARE SITE:
04-00-77 04-00-77 04-00-78 100%
PLACE STRUCTURAL CONCRETE:
09-00-78 09-00-78 01-00-84 84%
INSTALL REACTOR PRES $URE VESSEL:
08-00-81 08-00-81 08-00-81 100%
INSTALL LARGE BORE PROCESS PIPE:
03-00-80 03-00-80 10-00-84 58%
l INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
03-00-80 03-00-80 04-00-85 37%
INSTALL SMALL BORE PIPE:
03-00-81 03-00-81 07-00-84 19%
INSTALL CABLE TRAY:
09-00-80 09-00-80 10-00-84 61%
INSTALL EXPOSED METAL CONDUIT:
04-00-81 04-00-81 12-00-84 12%
INSTALL POWER CONTROL, INSTRUMENTATIDH AND SECURITY CABLE:
02-00-82 01-00-82 12-00-84 2%
INSTALL ELECTRICAL TEF. MIN / TIONS:
03-00-82 04-00-85 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
02-01-84 12-07-84 0%
CONDUCT NOT FUNCTIONAL TEST:
03-01-85 03-29-85
,0 %
CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
09-15-83 08-00-85 0%
4
l C0N5TRUCTION STATUS REP 0RT PAGE NO: 2-132 WATERFORD 3 HUCLEAR POWER PLANTS STATUS AS OF 03-31-82 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
05000382 CORPORATE CONTACT:
L.
V. MAURIN, VICE PRESIDENT CP NO. 4 DATE ISSUED: CPPR-103/ 11-14-74 NUCLEAR OPERATIONS CP EXPIRATION DATE:
10-31-83 CORPORATE ADDRESS:
142 DELARONDE STREET APPLICANT:
LOUISIANA POWER 8 LIGHT NEW ORLEANS, LOUISIANA 70174 PLANT LOCATION:
20 MI W OF HEW ORLEANS, LA IE REGIDH:
4 CORPORATE PHONE NO (504) 366-2345 AE EBASCO NSSS:
COMBUSTION ENGINEERING CONSTRUCTOR:
EBASCO NRC LPM:
S. BLACK REACTOR TYPE:
DER (MWE):
1151 IE RESIDENT INSPECTOR:
L. CONSTABLE IN5PECTION STATUSr FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITYi Jan. 1982 - Mar. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
09-27-74 06-00-79 INORDINATELY LENGTHY LICENSING PROCEEDING, 8130 11-16-81 12-15-81 WHICH IS CURRENTLY BEING PROLONGED BY THE 8131 12-07-81 12-11-81 ANTI-TRUST ISSUE.
8201 01-04-81 01-07-82 11-20-74 08-00-79 INORDINATELY LEHGHTY LICENSING PROCEEDING, 8203 12-16-81 02-15-82 WHICH WAS PROLONGED BY THE ANTI-TRUST 8207 02-16-82 03-15-82 ISSUE.
02-06-76 11-00-80 REEVALUATION OF CONSTRUCTION SCHEDULE.
CHANGE REFLECTS A MORE REALISTIC AND PRECISE CONSTRUCTION SCHEDULE.
Inspection reports are available at local PDRs.
09-19-78 05-00-81 REEVALUATION OF CONSTRUCTION SCHEDULE.
CHANGE REFLECTS A MORE REALISTIC AND PRECISE CONSTRUCTION SCHEDULE.
01-12-81 10-00-82 NO REASON PROVIDED.
04-12-82 01-00-83 NO REASON PROVIDED.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
UNIVERSITY OF HEW ORLEANS LIBRARY LOUISIANA COLLECTION, LAKEFRONT NEW ORLEANS, LOUISIANA 70122
~
l C0NSTRUCT ION
$TA TUS REP 0RT PAGE NO: 2-133 WATERFORD 3 NUCL EA R POWER PLANTS STATUS AS OF 03-31-82 C0NSTRUCT ION STA T U S:
APPL ICAt!T'S CURRENT ESTIMATED FUEL LOADING DATE:
01-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-82 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
06-00-78 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 07-00-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 94%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED l
START START COMPLETION COMPLETION %_SOMPLETE MOBILIZE AND PREPARE SITE:
11-14-74 100%
PLACE STRUCTURAL CONCRETE:
12-08-75 12-31-82 99%
INSTALL REACTOR PRESSURE VESSEL:
10-01-78 01-21-79 100%
INSTALL LARGE BORE PROCESS PIPE:
09-01-77 06-30-82 99%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
09-01-77 08-30-82 94%
INSTALL SMALL BORE PIPE:
09-01-77 08-30-82 90%
INSTALL CABLE TRAY:
02-02-78 06-30-80 100%
INSTALL EXPOSED METAL CONDUIT:
02-02-78
!2-31-82 91%
INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:
09-01-78 01-31-83 90%
INSTALL ELECTRICAL TERMINATIONS:
05-01-79 02-28-83 81 CONDUCT REACTOR COLD NYDR0 STATIC TEST:
06-15-82 06-29-82 0%
CONDUCT HDT FUNCTIONAL TEST:
08-27-82 10-02-82 0%
CONDUCT PREOP AND ACCEPTANC'E TESTS NECESSARY FOR FUEL LOAD:
02-19-79 12-01-82 42%
,/
O A
4 k
C0N5TRUCTION STATUS REP 0RT PAGE NO: E-134 WATTS BAR 1 NUCL EAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERISTICSt KEY PERS0NNEL:
DOCKET NO:
05000390 CORPORATE CONTACT:
H. G. PARRIS, MANAGER CP NO. 8 DATE ISSUED:
CPPR-91 / 01-23-73 0F POWER CP EXPIRATION DATE:
06-01-79 CORPORATE ADDRESS:
500A CHESTHUT STREET TOWER II APPLICANT:
TENNESSEE VALLEY AUTHORITY CHATTANDOGA, TENNESSEE 37401 PLANT LOCATION:
10 MI S OF SPRING CITY, TENN IE REGION:
2 CORPORATE PHONE NO:
(615) 751-2823 AE:
TENNESSEE VALLEY AUTHORITY NSSS:
WESTINGHOUSE CONSTRUCTOR:
TENNESSEE VALLEY AUTHORITY NRC LPM:
T. KENYON REACTOR TYPE:
R. V. CRLENJAK DER (MWE):
1165 IE RESIDENT INSPECTOR:
J. MCDONALD INSPECTION STATU5:
FUEL L0AD DATE CHANGES I
TIME PERIOD AS REPQRTED BY UT I L I T Y:
l Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
11-16-73 01-16-78 INABILITY TO OBTAIN STEEL ANCHOR BOLTS 8201 01-05-82 01-06-82 AND REINFORCING RODS.
8202 01-12-82 01-15-82 05-14-74 06-00-78 REDESIGN OF CONTAliiMENT TO ACCOMMODATE 8203 01-25-82 01-29-82 HIGHER TRANSIENT PRESSURES, INABILITY TO 8204 02-08-82 02-12-82 DBTAIN REDF. SIGNED STEEL ANCHOR BOLTS AND 8206 02-08-82 02-12-82 REINFORCING RODS, PLUS AN INCREASE IN TIME 8207 01-30-82 02-23-82 TO ERECT STEEL PLATE THICKER THAN THE 8208 02-22-82 02-22-82 ORIGINAL DESIGN.
8210 03-08-82 03-12-82 07-23-76 12-05-78 LATE DELIVERY OF PRINCIPAL PIPING, VALVES, AND HANGERS WHICH FORCED IMPOSSIBLE PEAKS Inspection reports are available at local PDRs.
IN STEAMFITTER MANPOWER.
01-09-78 06-00-79 LATE DELIVERY OF ICE CONDENSER EMBEDMENTS 11-07-78 12-00-79 HO REASON GIVEN.
09-12-79 09-01-80 NO REASON GIVEN.
09-10-80 11-00-81 NO REASON PROVIDED.
09-10-81 08-00-82 STEAM GENERATOR PROBLEMS AND PIPING.
04-09-82 08-00-83 NO REASON PROVIDED.
L0 CAL PUBLIC D0CUMENT R00Ms CHATTANDOGA-HAMILTON COUNTY BICENTENNIAL LIBRARY 1001 BROAD STREET CHATTAN00GA, TENNESSEE 37402
C0NSTRUCT IOH STA TUS R EPQR T PAGE NO: 2-135 WATTS BAR 1 NUCLEAR POWER PLAHTS STATUS AS OF:
03-31-82 C0HSTRUCTION S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
08-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
08-00-82 DEFIHED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
11-00-76 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL CPERATION DATE: 06-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 81%
COMMEHTS REGARDING CURRENT CONSTRUCTIDH STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START _
COMPLETION
[QMPLETION % COMPLETE MOBILIZE AHD PREPARE SITE:
12-26-72 04-15-74 100%
PLACE STRUCTURAL CONCRETE:
04-09-74 03-01-83 100%
INSTALL REACTOR PRESSURE VESSEL:
12-07-76 05-0S-77 100%
INSTALL LARGE BORC PROCESS PIPE:
10-17-77 03-01-83 97%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
10-17-77 03-01-83 55%
IHSTALL SMALL BORE PIPE:
07-01-77 03-01-83 93:
INSTALL CABLE TRAY:
11-02-73 03-01-83 97%
INSTALL EXPOSED METAL CONDUIT:
09-08-75 03-01-83 03-24-77 76%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
06-03-76 03-01-83 84%
INSTALL ELECTRICAL TERMINATIONS:
06-03-76 03-01-83 77%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
10-15-81 10-15-81 10-24-81 10-24-81 100%
CONDUCT HOT FUNCTIDHAL TEST:
03-29-83 06-00-83 0%
CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
01-02-79 08-01-83 30%
b 1
l A
q
C0NSTRUCTION STATUS REPORT PAGE NO: 2-136 WATTS BAR 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET ND:
05000391 CORPORATE CONTACT:
H.
G.
PARRIS. MANAGER CP NO. 3 DATE ISSUED:
CPPR-92 / 01-23-73 0F POWER CP EXPIRATIDH DATE:
03-01-80 CORPORATE ADDRESS:
500A CHESTNUT STREET TOWER II APPLICANT:
TENHESSEE VALLEY AUTHORITY CHATTANDOGA, TENNESSEE 37401 PLANT LOCATIDH:
10 MI S OF SPRING CITY, TEHN IE REGIDH 2
CORPORATE PHONE NO:
(615) 751-2823 AE TENNESSEE VALLEY AUTHORITY HSSS:
WESTINGHOUSE CONSTRUCTOR:
TEHNESSEE VALLEY AUTHORITY HRC LPM:
T.
KENYON REACTOR TYPE:
R.
V.
CRLENJAK DER (MWE):
1165 IE RESIDENT INSPECTOR:
J. MCDONALD l
INSPECTION $ T A T U S:
FUEL L0AD DATE CHAHGES TIME PERIOD AS REP 0RTED BY U T I L I T Y:
Jan, 1982 - Mar, 1982 i
REPORT NEW REASON FOR CHANGE i
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
11-16-73 10-16-78 INABILITY TO OBTAIN STEEL ANCHOR BOLTS 3201 01-05-82 01-06-82 AND REIHFORCING RODS.
8202 01-12-82 01-15-82 05-14-74 03-05-79 REDESIGN OF CONTAINMENT TO ACCOMMODATE 8204 02-08-82 02-1?-82 HIGHER TRANSIENT PRESSURES. INABILITY TO 8205 01-30-82 02-23-82 OBTAIN REDESIGNED STEEL ANCHOR BOLTS AND 8206 02-22-82 02-22-82 REINFORCING RODS, PLUS AN INCREASE IN TIME 8208 03-08-82 03-12-82 TO ERECT STEEL PLATE THICKER THAN THE ORIGINAL DESIGN.
Inspection reports are available at local PDRs.
07-23-76 09-05-79 L ATE ' ELIVERY OF PRINCIPAL PIF ING, VALVES, U
AND HANGERS WHICH FORCED IMPOSSIBLE PEAKS IN STEAMFITTER MANPOWER.
01-09-78 03-00-80 LATE DELIVERY OF ICE CONDENSER EMBEDMENTS 11-07-78 09-00-80 NO REASON GIVEN.
09-12-79 06-01-81 NO REASON GIVEN.
09-10-80 08-00-82 H0 REASON GIVEN.
09-10-81 06-00-83 NO REASON GIVEN.
i 04-09-82 08-00-84 STEAM GENERATOR PROBLEMS AND PIPING.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
CHATTANDOGA-HAMILTON COUNTY BICENTENNIAL LIBRARY 1001 BROAD STREET CHATTANDOGA, TENNESSEE 37402
C0NSTRUCT ION STATUS REPQRT PAGE NO: 2-137 WATTS BAR 2 NUCLEAR POWER PL A NTS STATUS AS OF:
03-51-82 C0NSTRUCT I ON
$T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
08-00-84 APPLICANTS CCHSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-01-83 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-00-77 (LATEST)
APPLICANT'S CURRENT ESTIMATED CCMMERCIAL OPERATION DATE: 06-01-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 58%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETIQB 1_{QMPLETE MOBILIZE AND PREPARE SITE:
12-26-72 04-15-74 100%
PLACE STRUCTURAL CONCRETE:
05-10-74 03-01-84 85%
INSTALL REACTOR PRESSURE VESSEL.
06-30-77 10-10-77 100%
INSTALL LARGE BORE PROCESS PIPE:
12-09-77 03-01-84 74%
INSTALL LARGE BORE PIPE HANGETS, RESTRAINTS AND SNUBBERS:
03-10-78 03-01-84 45%
INSTALL SMALL BORE PIPE:
11-01-77 03-01-84 54%
INSTALL CABLE TRAY:
11-02-73 03-01-84 81%
INSTALL EXPOSED METAL CONDUIT:
09-08-75 03-01-84 63%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
08-20-76 03-01-84 77%
INSTALL ELECTRICAL TERMINATIONS:
08-20-76 03-01-84 63%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
05-00-83 05-07-83 0%
CONDUCT HOT FUNCTIONAL TEST:
03-01-84 06-00-84 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
12-00-82 08-00-84
?5%
t O
r
C0N$TRUCTION STATUS REPORT PAGE NO: 2-138 WOLF CREEK 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PL AN T CHARACTER IST I C 5:
K EY P E R S 0 N N E L:
d DOCKET NO:
05000482 CORPORATE CONTACT:
G.
L.
K0 ESTER, VICE PRESIDENT CP NO. & DATE ISSUED:
CPPR-147/ 05-17-77 HUCLEAR CP EYPIRATION DATE:
03-01-84 CORPORATE ADDRESS:
P.
O.
BOX 208 APPLICANT:
KANSAS GAS 3 ELECTRIC WICHITA, KANSAS 67201 PLANT LOCATION:
3.5 MI NE OF BURLINGTON, KAN IE REGION:
4 CORPORATE PHONE NO:
(316) 261-6451 AE:
bECNIEL N3SS:
WESTINGHOUSE CCNSTRUCTOR:
DANIEL INTERNATIONAL NRC LPM:
J. HOPKINS REACTOR TYPE:
DER (MWE):
1150 IE RESIDENT INSPECTOR:
T. VANDEL IN5PECT ION STA T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRT ED BY U T I L I T Y:
Jan, 1982 - Mar. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
01-14-81 04-01-83 NO REASON PROVIDED.
8120 01-02-82 02-28-82 11-27-81 12-16-83 NO REASON PROVIDED.
8201 01-02-82 02-28-82 8202 01-18-82 01-22-82 8203 01-26-82 02-19-82 8205 03-12-82 03-12-82 Inspection reports are available at local PDRs.
I L 0CA L PUBL IC D0CUMENT R 0 0 M:
WILLIAM ALLEN WHITE MEMORIAL LIBRARY EMPORIA STATE UNIVERSITY 1200 COMf1ERCIAL EMPORIA, KANSAS 66801
C0NSTRUCT IOH S? A TUS REPQRT PAGE NO: 2-139 WOLF CREEK 1 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 C0NSTRUCTION STA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-16-83 APPLICANTS CONSTRUCTION COMPLETION ESTIPATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
04-01-83 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-82 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-31-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 80%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE FIRST QUARTER OF 1982.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START EART COMPLFS QN G MPLETION 7._CDMPLETt MOBILIZE AND PREPARE SITE:
01-24-77 01-24-77 08-01-77 12-01-77 100%
l PLACE STRUCTURAL CONCRETE:
08-01-77 06-01-77 06-01-83 97%
INSTALL REACTOR PRESSURE VESSEL:
10-01-79 02-29-80 11-01-79 04-11-80 100%
INSTALL LARGE BORE PROCESS PIPE:
03-01-78 04-01-83 89%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
04-01-78 12-01-82 65%
INSTALL SMALL BORE PIPE:
08-01-78 04-01-83 51%
INSTALL CABLE TRAY:
08-01-78 04-01-82 90%
INSTALL EXPOSED METAL CONDUIT:
02-01-78 12-01-82 53%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-01-80 04-01-83 65%
INSTALL ELECTRICAL TERMINATI0HS:
06-01-80 08-01-83 29%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
05-20-83 05-27-83 0%
CONDUCT HOT FUNCTIONAL TEST:
09-02-83 09-23-83 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
05-25-81 07-29-81 10-01-83 0%
C0NSTRUCT ION STA TUS R EPORT PAGE NO: 2-140 YELLOW CREEK 1 NUCL EA R POWER PLAN TS STATUS AS OF:
03-31-82 PLAN T CHARACTER I5T I C S:
KEY PERS0NN E L:
DOCKET NO:
05000566 CORPORATE CONTACT:
H.
G.
PARRIS, MANAGER CP No. 4 DATE ISSUED:
CPPR-172/ 11-29-78 0F POWER CP EXPIRATION DATE:
05-01-85 CORPORATE ADDRESS:
500A CHESTNUT STREET TOWER II APPLICANT:
TENNESSEE VALLEY AUTHORITY CHATTANDDGA, TEENESSEE 37401 PLANT LOCATION:
15 MI E OF CORINTH, MISS IE REGICH:
2 CORPORATE PHONE NO:
(615) 751-2823 AE:
TENNESSEE VALLEY AUTHORITY NSSS:
COMBUSTION ENGINEERING CCNSTRUCTOR:
TENNESSEE VALLEY AUTHORITY NRC LPM:
L. WHEELER REACTOR TYPE:
R.
V.
CRLENJAK DER (MWE):
1285 IE RESIDENT INSPECTOR:
IN5PECTION STA T U 5:
FUEL L0A D DAT E CHA N GES TIME PERIOD A S REP 0RT ED BY UT IL I T Y:
Jan, 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE EEPORTED BY UTILITY NUMBE8 OF INSP.
OF I N1P.
09-12-79 01-02-85 NO REASON GIVEN.
8201 03-10-82 03-12-82 09-10-80 10-00-86 NO REASON PROVISED.
08-14-81 07-00-89 NO REASON PROVIDED.
Inspection reports are available at local PDRs.
l L0CA L PUBL IC D0CUMENT R 0 0 M:
CORINTH PUBLIC LIBRARY 1023 FILLMORE STREET CORINTH, MISSISSIPPI 38834
C0N S TRUCT ION STA TUS REP 0RT PAGE NO: 2-141 YELLOW CREEK 1 N UCL EA R POWER PL AN TS STATUS AS OF:
03-31-82 C0NST RUCT ION ST A T U 5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
07-01-89 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-86 DEFINED IN CP: (EARLIEST) 02-01-84 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
02-01-84 05-01-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 01-01-90 CURRENT ESTIMATED PEPCENT CONSTRUCTION COMPLETE: 35%
CCMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITN OPTION TO RESTART AS NECESSARY.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION
[pHP1ETION 3_SQMPLETE MOBILIZE AND PREPARF SITE:
02-09-78 12-14-78 100%
i 1
i PLACE STRUCTURAL CONCRETE:
12-14-78 05-30-88 87%
INSTALL REACTOR PRESSURE VESSEL:
05-30-88 06-28-88 0%
INSTALL LARGE BORE PROCESS PIPE:
02-25-81 11-27-87 1%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
02-25-81 01-14-88 1%
INSTALL SMALL BORE PIPE:
07-07-83 01-14-88 0%
INSTALL CABLE TRA(:
05-13-81 12-31-87 1%
INSTALL EXPOSED METAL CONDUIT:
02-11-83 12-25-86 0%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
03-24-83 01-14-88 0%
INSTALL ELECTRICAL TERMINATIONS:
03-24-83 01-14-88 0%
CONDUCT REACTOR COLD NYDR0 STATIC TEST:
11-30-87 12-14-87 0%
CONDUCT NOT FUNCTIONAL TEST:
03-10-88 04-21-88 0%
CONCUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
05-01-84 07-01-89 0%
C0N $T RUCTION STA TUS REPOR7 PAGE NO: 2-142 YELLCW CREEK 2 NUCLEAR POWER PL4NTS STATUS AS OF:
03-31-82 PL A NT C H A R A C T E R I S T I C 5:
KEY PERS0N N E L:
DOCrET NO:
05000567 CORPORATE CONTACT:
H.
G.
PARRIS, MANAGER CP NO. 3 CATE ISSUED:
CPPR-173/ 11-29-78 0F POWER CP EXPIRATION PATE:
05-01-86 CORPORATE ADDRESS:
500A CHESTHUT STREET TOWER II APPLICANT:
TENNESSEE VALLEY AUTHORITY CHATTAN00GA, TENNESSEE 37401 PLANT LOCATION:
15 MI E OF CORINTH, MISS IE REGICN:
2 CORPORATE PHONE NO:
(615) 751-2823 AE:
TENNESSEE VALLEY AUTHORITY NSSS:
CCMBUSTION ENGINLEPING CCNSTRUCTCR:
TENNESSEE VALLEY AUTHORITY NRC LPM:
L. WHEELER REACTOR TYPE:
R.
V. CRLENJAK DER (MWE):
1285 IE RESIDENT INSPECTOR:
IN5PECT ION 5TA T U S:
FUEL L0AD DAT E CHANGES TIME PERIOD AS REPQRTED BY UT IL I T Y:
Jan. 1932 - Mar, 19R2 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NU"BE9 0F INSP.
OF INSP.
09-12-79 10-05-87 NO REASON GIVEN.
3201 03-10-82 03-12-82 01-15-80 04-01-87 NO REASON GIVEN.
09-10-80 10-00-92 NO REASON GIVEN.
08-14-81 N/S DEFERRED.
Inspection reports are available at local PDRs.
L0CA L PUBLIC D0CUMENT R 0 0 M:
CORINTH PUBLIC LIBRARY 1023 FILLMORE STREET CORINTH, MISSISSIPPI 38834
C0NSTRUCT ION 5TA TUS REP 0RT PAGE NO:
2-M 3 YELLOW CREEK 2 NUCLEAR POWER PL ANTS STATUS AS OF:
03-31-82 C0NSTRUCT ION STA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/S APPLICANTS CONSTRUCTION COM'LETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-92 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
N/S (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
3%
CCMNENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITN OPTION TO RESTART AS HECESSARY.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 1 TART _
COMPLETION
[pMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:
N/S PLACE STRUCTURAL CONCRETE:
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BDRE PIPE HANGERS. RESTRAINTS AND SNUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER,CCNTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
W
C0N STRUCT ION ST A TUS R EP0R T PAGE NO: 2-144 ZIMMER 1 N UCL EA R POWER P L A N T S STATUS AS OF:
03-31-82 T
PLAN T CHA RACT ER I S T I C S:
K EY P ERSONN E L:
DOCKET NO:
05000358 CORFORATE CONTACT:
E.
A.
BORCMSN, VICE FRESIDENT CP NO. 8 DATE ISSUED:
CPPR-88 / 10-27-72 ENGINEERIhG CP EY,PIRATICH DATE:
01-01-77 CORPORATE ADDRESS:
139 EAST 4TH STREET APPLICANT:
CINCINNATI GAS 8 ELECTRIC CINCINNATI, OHIO PLANT LOCATION:
24 MI SE OF CINCINNATI, OH IE REGICN:
3 CORPORATE PHCNE NO:
(513) 632-2663 AE-SARGENT 8 LUNDY NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
KAISER ENGINEERS NRC LFM:
I. PILTIER REACTOR TYPE:
E.
SCHWEIBINEZ l
DER (MWE):
0810 IE RESIDENT INSPECTOR:
W.
CHRISTIANSON I NSPECT ION STA T U 5:
FUEL L0A D DA T E C H A N GES TIME PERIOD A S REPQR T ED BY UT IL I T Y:
Jan, 1932 - Mar.
1992 REPORT NEW REASON FOR CHANGE REPCRT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMB _(3 0F INSP.
OF INSP.
09-26-74 02-00-78 1.
PRODUCTIVITY.
3127 08-24-81 11-16-81 2.
SOME MATERIAL SHCRTAGES.
8128 10-01-81 10-26-81 3.
CRAFT STRIKES UHICH CONSU!1ED MOST OF 8129 11-02-81 11-30-81 THE sum 1ER BUILDING SEASON.
3130 11-16-81 11-19-81 10-15-74 04-00-78 REEVALUATION OF NOS.
1, 2 AND 3 ABOVE.
8132 12-01-81 01-29-82 10-18-77 10-00-78 REEVALUA1 ION OF CONSTRUCTION NETWORK.
04-00-78 06-00-79 CONSTRUCTION EXTENDED SCHEDULE.
Inspection Reports are available at local PDRs.
05-14-79 10-00-79 NO REASON GIVEN.
09-21-79 08-00-80 NO REASON GIVEN.
06-03-80 11-00-81 NO REASCN GIVEN.
10-22-81 07-00-82 NO REASON GIVEN.
04-19-82 12-00-82 NO REASON GIVEN.
L 0CA L PUBL I C D0CUMEN T R 0 0 M:
CLERMONT COUNTY LIBRARY THIRD AND CRDADWAY STREETS BATAVIA, OHIO 45103 l
C0N5TRUC TION 5TA TUS REPQRT PAGE NO: 2-145 ZIMMER 1 N UCL EA R POWER P L AN TS STATUS AS OF:
03-31-82 C0N S T RUCT I ON ST A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-00-82 APPLICANTS CONSTRUCTION COMPLEiION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
07-00-82 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADIwn DATE AT CP ISSUANCE:
0.-00-77 (LATEST)
APPLICANT'S CURRENT ESTIMATED Cucr.RCIAL CPERATION DATE: 0*-00-83 4
CURRENT ESTIMATED PERCENT CONSTRUCTION CCMPLETE: 95%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: UPDATE NOT FROVIDED IN NEW FORMAT.
l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED l
l START START COMPLETION CQ$PLE1103 7.
COMPLETE 03-00-71 06-00-71 100%
MOBILIZE AND PREPARE SITE:
06-00-73 PLACE STRUCTURAL CONCRETE:
11-00-75 01-00-76 100%
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
03-00-75 06-00-82 92%
INSTALL SMALL BORE PIPE:
08-00-73 05-00-81 100%
INSTALL CABLE TRAY:
08-00-73 05-00-81 100%
INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER, CONTROL. INSTRUMENTATION AND SECURITY CABLE:
02-00-70 02-00-82 98%
INSTALL ELECTRICAL TERMINATIONS:
05-00-78 07-00-78 100%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:
l l
Cv")
E O
t.)
LaJ C/)
SCH EDUL E F0R UPDA T ES PAGE NO: 3-001 CA L ENDA R Y EA R 1 982 This report isa quarterly publication.
Updates from the respondents for Calendar Year 1932 are due as follows:
FIRST QUARTER 1982 DUE APRIL 30, 1982 l
l SECOND QUARTER 1952 DUE JULY 30, 1982 THIRD QUARTER 1982 DUE OCTOBER 29, 1982 FOURTH QUARTER 1982 DUE JANUARY 23, 1933 The update information should be forwarded to:
Chief, Management Information Branch Office of Resource Management U.
S.
Nuclear Roqulatory Ccenission kla sh i n g t o n,
D.
C.
20555
PAGE NO: 3-Or*
C0N5TRUCT ION 5TA TUS REPORT PAGE NO: 2-XXX FACILITY HAME APPEARS HERE NUCLEAR POWER PLA NTS STATUS AS OF:
PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
OS000XXX CORPORATE CONTACT:
CP HO. 8 DATE ISSUED:
CP EXPIRATION DATE:
CORPORATE ADDRESS:
APPLICANT:
PLANT LOCATION:
IE REGION:
CORPORATE PHONE NO:
AE:
NSSS:
CONSTRUCTOR:
NRC LPM:
REACTOR TYPE:
IE PROJECT INSPECTOR:
DER (MWE):
IE RESIDENT INSPECTOR:
IN5PECT ION 5 T A T U 5:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPOR TED BY UT IL I T Y:
REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
l I
i L0 CAL PUSLIC DDCUMENT R 0 0 Mr I
V
l PAGE NO: 3-003 C0N STRUCTION STA TU$
R EPQRT PAGE NO: 2-XXX FACILITY NAME APPEARS NERE NUCL EA R POWER PL ANTS STATUS AS OF:
C0N5TRUCT ION STA T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
APPLICANTS CONSTRUCTICN COMPLETION ESTIMATE AS APPLICANT'S PREVICUS ESTIMATED FUEL LOADING DATE:
DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
(LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE:
CURRENT ESTIMATED PERCENT CCHSTRUCTION COMPLETE:
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED i START STAPT CCMPLETION COM"tETTON t C0r'PL F T f f MOBILIZE AND PREPARE SITE:
PLACE STRUCTURAL CONCRETE:
I l
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
I i
INSTALL SMALL BORE PIPE:
I INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
li INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
I t
CONDUCT REACTOR COLD NYDR0 STATIC TEST:
i CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
I 1
4 I
e r
nc8 OHM 335 "t"
U S NUC L E A R HF G < ' AT OR Y C OMMISSifW NUREG-0030, Vol. 6, No. 1 BIBLIOGRAPHIC DATA SHEET 111i V AN D SUB1l1 L t (A dd Votume No, oI.apprHor a'el 2 fleave tuank i Nuclear Power Plants - Construction Status Report Data as of 03/31/82 3 HE CIPIE NT'S ACCE SSION NO AU T HOHISp 5 DATE HEPOHT COMPLE TED l YE AR MON TH June 1982 l P[ H DH MING OHG ANI/A D ON N AME. AND M AILIN 5 A DD M SS o ade Inp Codel DATE REPORT ISSUED U.S. Nuclear Regulatory Conmission I "1982 N'"
^"
une Office of Resource Management 6 " ' ' " ' " ' " ' '
Management Infonnation Branch Washington, D.C.
20555 8 (Leave blank) 1 LFONSOHING OHG ANI/ ATION N AME AND M AILING ADOHE SS tinclude 2 0 Codel 10 PROJE CT T AS A WOH A UNIT NO U.S. Nuclear Regulatory Conmission Of fice of Resource Management 3,
cONTH ACT NO Management Infonnation Branch Washington, C.C.
20555 et 9:00 c ov t nt O IInclui ve detest 3 1 y Pf of Hi PDij i Construction Status Report January 1, 1982 Thru yarch 31, 1982 s
5 buPPt i Mt N T AH) NOTE S 14 IL edve p*' A l 6 A HS I H A C T (200.w m ds or /e s s l The " Construction Status Report," also referred to as the " Yellow Book," is a quarterly publication containing nuclear power plant construction data and actual progress. The infonnation contained in this report is supplied to the NRC by applicants with Construction Permits.
! ? k t Y WORDS AND (HWUMt N T AN At y $is l la OL 5C HtP T OH5 1
l 9 iDt N ils it Hs oct N t N Dt O it HMS L._ __
m 5m.i s 8 u Ait Atu t ir, s t A rt ve N r n se cu m i, c t :ch. r, -
z' 1
Unlimited Unclassifded 6-20 st c.mm T v c t,.' < p, 7 *. r e.+
t i Unclass1fied U.S. GMTRNMENT PRINTING OF FICE: 1982 361-302/538
UNITED STATES
,,ast ciass us t NUCLEAR REGULATORY COMMISSION
'05GQ 8 O
,g WASHINGTON. D C. 20565 wasa a t n avis n. in o*HCIAL SUSINESS P(NALTY FOR PRiv ATE USE. SET)
I