ML20058A807
| ML20058A807 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/17/1990 |
| From: | Doerflein L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9010290205 | |
| Download: ML20058A807 (2) | |
See also: IR 05000277/1990017
Text
'
a
,
,
el
OCT 17 1990
.
,
No.90-122
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
NOTICE OF SIGNIFICANT LICENSEE MEETING
Licensee:
Philadelphia Electric Company
l
Facility:
Peach Bottom Units 2 and 3
Docket Nos.:
50-277; 50-278
Time and Date:
1:30 p.m., October 26, 1990
Location:
DRP Conference Room, Region I Office, King of Prussia PA
Purpose:
Enforcement Conference to Discuss Reactor Water Level Trip
Setpoint Violations Identified in Combined Inspection
Report Nos. 50-277/90-17; 50-278/90-17.
NRC Attendees:
C.W. Hehl, Director, Division of Reactor Projects (DRP)
A.R. Blough, Chief, Projects Branch No. 2 DRP
L. T. Doerflein, Chief, Reactor Projects Section 2B, DRP
J.P. Durr, Chief Engineering Branch, Division of Reactor
Safety (DRS)
J.J. Lyash, Senior Resident Inspector
K. Smith, Regional Attorney
D. Holody, Enforcement Officer
G. Suh, Project Manager, NRR
Licensee Attendets: D. Smith, Senior Vice President Nuclear
D, Helwig, Vice President, Nuclear Engineering and Services
D. Miller, Vice President, Peach Bottom Atomic Power Station
J. Franz, Plant Manager, Peach Bottom Atomic Power Station
A. Fulvio, PBAPS Regulatory Engineer
J. Basilio, PBAPS Licensing Supervisor
M. Leahy, NSSS Electrical Engineering Branch Head
P. Hinnenkamp, I&C Supervisor, PBAPS
G. Segly, Engineer, NSSS Electrical Engineering Branch
D. Palena, Engineer, NSSS Mechanical Engineering Branch
Note: Enforcement Conferences are not open to the public. Attendance by NRC
personnel at this meeting should be made known by 4:00 p.m. on October 23, 1990
viatelephonecalltoL.T.Doerflein,RegionI,at0{S,8,-3g5}7pjorcommer-
F
cial (215) 337-5378.
k'iiicace T. 00Edleit)
g(
Prepared by:
e
Lawrence T. Doerflein, Chief, RPS 2B
0FFICIAL RECORD COPY
PB MEETING NOTICE - 90-122 - 0001.0.0
10/16/90
M6
9010290205 901017
gDR
ADoCK 0500
77
_ .
e
n'
.
Distribution:
J. Taylor, Executive Director for Operations-
J. Snierek, Deputy Executive Director for Nuclear Reactor Regulation,
Regional Operations and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards
and Operations Support (DEDS)
B. Grimes, Director, Division of Reactor Inspection and Safeguards NRR
J. Lieberman, Director, Office of Enforcement
T. Murley, Director, Office of Nuclear Reactor Regulation
W. Russell, Associate Director for Inspection and Technical Assessment, NRR
B. Boger, Assistant Director for Region I Reactors, NRR
J. Caldwell, Regional Coordinator E00
W. Regan, Chief. Human Factors Assessment Branch, NRR
S. Varga, Director, Division of Reactor Projects - I/II, NRR
W. Butler, Director, Project Directorate I-2, NRR
G. Suh, Project Manager, PD I-2, NRR
-
W. Baleman, Chief, PQEB Section A NRR
N. Green, Jr., Policy Development & Technical Support Branch
Public Document Room (PDR)
Local Public Document Room (LPDR)
Commonwealth of Pennsylvania
bec:
Regional Administrator
Deputy Regional Administrator
Division Directors
Branch Chiefs
Section Chiefs
Public Af fairs Officer (2 copies)
M. Miller, RI
K. Smith, RI
(Only for Enforcement Meetings)
D. Holody, RI (Only for Enforcement Meetings)
Region I Receptionist
DRMA Files
DRP Files
Bulletin Board
M. J. DiDonato, DRP
f
RI:DRP
RI:DRP
Doerflein/kig
Blough
30/l'?/90
/* ////90
0FFICIAL RECORD COPY
PB MEETING NOTICE - 90-122 - 0002.0.0
~
10/16/90
1