docketNo.50-285 DLau%a $dMd1(GYb
,m
., m. m 9 mm Mr. Terry L. Patterson NOV 101993 Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
On November 4,1993, the Commission published in the Federal Reaister (58 FR 58804 to 58807) proposed amendments to 10 CFR Part 73 that would modify the design basis threat for radiological sabotage to include use of a land vehicle by adversaries. The Federal Reaf ster notice refers to a draft regulatory guide prepared by t% staff that contains preliminary information for licensees on initial assessments of protective measures against vehicle intrusions and approaches to assess whether the Commission's design goals and criteria are met by measures taken to protect against vehicle intrusion.
The Commission's Office of Nuclear Regulatory Research is in the process of publishing this proposed guide.
A preliminary version of the draft guide was included as Enclosure 8 to SECY-93-270, " Proposed Amendments to 10 CFR Part 73 to Protect Against Malevolent Use of Vehicles at Nuclear Power Plants," September 29, 1993.
SECY-93-270 is available in the public document room.
To facilitate any comments you may have on the proposed rulemaking package, enclosed is Safeguards Information that is referenced in the preliminary draft guide.
It provides the proposed characteristics of the design basis vehicle (forwarded to you earlier),
guidance for barrier design, and guidance for blast analysis.
When the draft guide is formally issued, it will be forwarded to licensees through normal distribution without the enclosed Safeguards Information.
The Safeguards Information will be updated and forwarded to licensees after publication of any final rulemaking, if necessary.
Sincerely, Originalsigned by 9312010061 931116 L. J. Callan PDR ADDCK 05000285 Acting Associate Director for Projects F
PDR Office of Nuclear Reactor Regulation
Enclosure:
Safeguards Information cc w/o enclosure-See next page j
- S'"Blo'k"TD NN PD4-1 Reading DISTRIBUTION:
SG. *ggggpind W.13eckner PY Nifoha M ' * '
oni '
encirures, tNs docMnt G d0 con?Ond?
0FC LA:PD4f1)N D:PD4-1s-ADP(Ah NAME PNoonanpk WBeckner LJCalk hh k MM @y DATE H //d /93 h /d /93 JI/l(93 0FFICIAL RECORD COPY Document Name:
RGPDil.1tr I
g g
- 7. r r
~7sr 4\\
~
u m
umuh l
Docket No. 50-285
.-,-w e r r -, n e. r 3 b,!LdbnhaLOdnhldlld!
l*.
Mr. Terry L. Patterson NOV 161993 Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
I On November 4,1993, the Commission published in the Federal Reaister (58 FR 58804 to 58807) proposed amendments to 10 CFR Part 73 that would modify the design basis threat for radiological sabotage to include use of a land vehicle by adversaries.
The Federal Reaister notice refers to a draft regulatory guide prepared by the staff that contains preliminary information for licensees on initial assessments of protective measures against vehicle l
intrusions and approaches to assess whether the Commission's design goals and criteria are met by measures taken to protect against vehicle intrusion. The Commission's Office of Nuclear Regulatory Research is in the process of-publishing this proposed guide.
A preliminary version of the draft guide was included as Enclosure 8 to SECY-93-270, " Proposed Amendments to 10 CFR Part 73 to Protect Against Malevolent i
Use of Vehicles at Nuclear Power Plants," September 29, 1993. SECY-93-270 is available in the public document room. To facilitate any comments you may have on the proposed rulemaking package, enclosed is Safeguards Information that is referenced in the preliminary draft guide.
It provides the proposed characteristics of the design basis vehicle (forwarded to you earlier),
i guidance for barrier design, and guidance for blast analysis.
]
When the draft guide is formally issued, it will be forwarded to licensees through normal distribution without the enclosed Safeguards Information. The Safeguards Information will be updated and forwarded to licensees after publication of any final rulemaking, if necessary.
Sincerely, Originalsigned by L. J. Callan Acting Associate Director for Projects Office of Nuclear Reactor Regulation
Enclosure:
Safeguards Information cc w/o enclosure:
See next page mitted hergogtgrgs tjve PD4-1 Reading SG. *gg%(yPWNiio ab WEA I S FBloom "
DISTRIBUTION:
W. teckner encbsures, tr:s d:cument G decomro:!ed."
0FC LA:PD4f1)N D:PD4-1s ADP(Ah NAME PNoonan2pk WBeck er LJCalk DATE O //d /93 li/d /93 y /IT/93 0FFICIAL RECORD COPY Document Name:
RGPD41.ltr 7
m t--
. 7n, t.
amo..
f.
- e.. f%
[,'I;I
.b.2 hN~. i [1 I
g UNITED STATES 4'
NUCLEAR REGULATORY COMMISSION
(*****,/
WASHINGTON D.C. 20555-0001 l
NOV 161993 l
Docket No. 50-285 l
Mr. Terry L. Patterson Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Siwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
On November 4,1993, the Commission published in the Federal Reaister (58 FR 58804 to 58807) proposed amendments to 10 CFR Part 73 that would modify the design basis threat for radiological sabotage to include use of a land vehicle-by adversaries. The Federal Reaister notice refers to a draft regulatory guide prepared by the staff that contains preliminary information for j
licensees on initial assessments of protective measures against vehicle intrusions and approaches to assess whether the Commission's design goals and
. criteria are met by measures taken to protect against vehicle intrusion. The Commission's Cffice of Nuclear Regulatory Research is in the process of 1
publishing this proposed guide.
A preliminary version of the draft guide was included as Enclosure 8 to SECY-93-270, " Proposed Amendments to 10 CFR Part 73 to Protect Against Malevolent Use of Vehicles at Nuclear Power Plants," September 29, 1993.
SECY-93-270 is available in the public document room. To facilitate any comments you may have on the proposed rulemaking package, enclosed is Safeguards Information that is referenced in the preliminary draft guide.-
It~provides the proposed characteristics of the design basis vehicle (forwarded to you earlier),
guidance for barrier design, and guidance for blast analysis.
When the draft guide is formally issued, it will be forwarded to licensees through normal distribution without the enclosed Safeguards Information. The Safeguards Information will be updated and forwarded to licensees after publication of any final rulemaking, if necessary.
Sincerely, L.
Ca n.
A ng Associate Director for Projects 0 ice of Nuclear Reactor Regulation
Enclosure:
. Safeguards Informatic8G
- Document transmuted hettvith contains sensitive unclassified itmN '" a samed from cc w/o enclosure; encbMes, !!D dZ$xm is dcc;r.ucFed."
See next page on :
$-,3q.:qry pj Cm qp <-vM.o L 1.d G.):6.u acil e
1 Mr. Terry L. Patterson Omaha Public Power District Fort Calhoun Station, Unit I cc:
Mr. Michael F. McBride, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1875 Connecticut Avenue, NW Washington, D.C.
20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Nebraska Department of Health 301 Centennial Mall, South Post Office Box 95007 Lincoln, Nebraska 68509 Mr. James W. Chase, Manager Fort Calhoun Station Post Office Box 399 Fort Calhoun, Nebraska 68023