ML20058A357
| ML20058A357 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/17/1993 |
| From: | Wwigginton D Office of Nuclear Reactor Regulation |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20058A359 | List: |
| References | |
| RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, NUDOCS 9312010055 | |
| Download: ML20058A357 (4) | |
Text
T t " ")%g k
p
?
[
.. j t UNITED STATES 3
f.. j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20655-0001 r
\\...../
November 17, 1993 Docket No. 50-382 Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.
Post Office Box B Killona, Louisiana 70066
Dear Mr. Barkhurst:
SUBJECT:
INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (REGULATORY GUIDE 1.97) - WATERFORD STEAM ELECTRIC STATION, UNIT 3 Section 6.2 of Generic Letter 82-33 requested licensees to provide a report on their implementation of Regulatory Guide 1.97 (Revision 2), including their methods for complying with the Commission's regulations and a supporting technical justification for any proposed alternatives or deviations. A large number of exception requests were received from pressurized-water reactor licensees asking that the environmental qualification requirement for accumulator level and pressure monitoring instrumentation be relaxed from Category 2 to Category 3, allowing commercial grade instruments to be used.
Prior to 1987 these requests were denied by the staff. Since then, these exceptions have been considered as an open item until a generic resolution can be found.
The staff has now reviewed the bases for these exceptions and has concluded that no operator action is based on this post-accident instrumentation and that this instrumentation does not perform any post-accident safety function.
Accordingly, its qualification requirements can be reduced to Category 3.
A copy of our Safety Evaluation is enclosed.
You have already installed Category 2 instrumentation to monitor accumulator level and pressure.
You are no longer bound by this commitment and may, at your discretion, replace this instrumentation with Category 3 instrumentation.
This letter constitutes prior approval for use of Category 3 instrumentation.
to monitor accumulator level and pressure at the Waterford Steam Electric Station, Unit 3.
NRC Fli.E CENTER C8PY ju=oiB883166$2 f01 i
g
s Mr. R'oss P. Barkhurst If you have any questions regarding this issue, please do not hesitate to contact me at (301) 504-1301.
Sincerely, ORIGINAL SIGHED BY:
David L. Wigginton, Senior Project Manager Project Directorate IV-1 i
Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page DISTRIBUTION Docket File NRC & Local PDRs PD4-1 Reading D. Wigginton E. Adensam W. Beckner P. Noonan ACRS (10) (P-315)
OGC (15B18)
J. Roe A. B. Beach, RIV-A. Hansen i
r LA:PD4'11[- PM:PD4-Lhh7 0FC r
D:PD4-1 NAME PNoonanI[
DWiggirkobpk WBeckneW DATE il /> 7/93
/I/f7/93 il/11/93
)
COPY YEk7U0d
/YEkfNO YES/bO)
)
0FFICIAL RECORD COPY Document Name: WATRG197.ltr
Mr. Ross P. Barkhurst If you have any questions regarding this issue, please do not hesitate to contact me at (301) 504-1301.
Sincerely, 1
7 Dav d L. W g inton, Senior Project Manager Project Directorate IV-1 l
Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page I
i
)
Mr. Ross P. Barkhurst Entergy Operations, Inc.
Waterford 3 cc:
Mr. Hall Bohlinger, Administrator Regional Administrator, Region IV Radiation Protection Division U.S. Nuclear Regulatory Commission Office of Air Quality and Nuclear Energy 611 Ryan Plaza Drive, Suite 1000 Post Office Box 82135 Arlington, Texas 76011 Baton Rouge, Louisiana 70884-2135 Resident Inspector /Waterford NPS Mr. Jerrold G. Dewease Post Office Box 822 Vice President, Operations Killona, Louisiana 70066 Support Entergy Operations, Inc.
Parish President Council P. O. Box 31995 St. Charles Parish Jackson, Mississippi 39286 P. O. Box 302 Hahnville, Louisiana 70057 William A. Cross Bethesda Licensing Office Mr. Harry W. Keiser, Executive Vice-3 Metro Center President and Chief Operating Officer Suite 610 Entergy Operations, Inc.
Bethesda, Maryland 20814 P. O. Box 31995 Jackson, Mississippi 39286-1995 Mr. Robert B. McGehee Wise, Carter, Child & Caraway Chairman P.O. Box 651 Louisiana Public Service Commission Jackson, Mississippi 39205 One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Mr. D. F. Packer General Manager Plant Operations Mr. R. F. Burski, Director Entergy Operations, Inc.
Nuclear Safety P. O. Box B Entergy Operations, Inc.
Killona, Louisiana 70066 P. O. Box B Killona, Louisiana 70066 Mr. L. W. Laughlin, Licensing Manager Entergy Operations, Inc.
P. O. Box B Killona, Louisiana 70066 Winston & Strawn Attn:
N. S. Reynolds 1400 L Street, N.W.
Washington, DC 20005-3502
.