Monthly Operating Repts for Browns Ferry Nuclear Plant Units 1,2 & 3 for Sept 1990
ML20058A284
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/30/1990
From: Carier P, Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9010250378
Download: ML20058A284 (12)


Text

..

i 4 4Q.n.;.c F

.g.

' TENNESSEE VALLEY _ AUTHORITY

'P. O. Box 2000 Decatur, Alabama OCT 101990 L

2

_U.S. Nuclear Regulat_ory Commission

.ATTH: Document Control Desk Washington, D.C.-

20555 Centlemen:

In the Matter of-

)

Docket Nos.'50-259

.. Tennessee, Valley Authority

)

50-260 4

l 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF SEPTEMBER 1990 In accordance with the requirements of the BFN Technical Specifications (TS) section 6.9.1.3, the Monthly Operating Report for the iLonth of September 1990 I

is enclosed.

If you have any questions, please telephone me, at (205) 729-3570.

Very truly yours, TENNESSEE VALLEY AUTHORITY kb d4 1

Patrick P. Carier, Manager of Site Licensing Enclosures cc (Enclosures):

INPO Records Center Mr. Ted Marston, Director Institute of Nuclear Power Operations Electric Power Research Institute 1100 Circle 75 Parkway, Suite 1500 P.O. Box 10412

' Atlanta,-Georgia 30389 Palo Alto, California 94304 Regional Administration Mr. B. A. Wilson, Project Chief U.S. Nucicar Regulatory Commission U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Regulatory Commission Region II 101 Marietta Street NW, Suite 2900 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia Atlanta, Georgia 30323 Mr. Frederick J.'Hebdon, Director NRC Resident Inspector

. Project Directorate II-4 Browns Ferry Nuclear Plant Division of Reactor Projects I-II Route 12, Box 637 Office of Nuclear Reactor Athens, Alabama 35609-2000 Regulation, Mail 13 H3 Washington, D. C. 20555

+

'06040

/,

9010250378 900930

/

ADOCK O 29 gDR An Equal Opportunity Employer 15 1

J-a '.'

\\

(;

r V-

. s t

MONTHLY OPERATING REPORT

+

a BROWNS FERRY NUCLEAR PLANT 9

1 TENNESSEE VALLEY AUTHORITY 1

,c,1 h ri-SEPTEMBER 1990 I

I DOCKET NUMBERS 50-259, 50-260, AND 50-296 LICENSE NUMBERS DPR-33, DPR-52, AND DPR-68 1'

4

)

i

(

I e

i I

i i

i 1

i e

i l+

1 r

1

+ ;

k r

E-3 OPERATIONAL SUlttARY

(~

t.

-' ~

SEPTEMBER 1990 ii UNIT 1 Unit remains on administrative hold to resolve various TVA and NRC concerns.

UNIT 2

)

I Unit remains on administrative hold to resolve various TVA and NRC concerns.

Modification, operation, and maintenance work continues to support restart.

UNIT 3 Unit remains on administrative hold to resolve various TVA and NRC concerns.

I l

l.

1 1

i 1

l l

i l

1

'q

~

. AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO.30-259 J

Unit One-

[

PREPARED BY S. A. Rat 11ff TELEPHONE (205) 729-2937 MONTH SEPTEMARD 1990 g

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

l 9

0 25 0

10 0

26 0

11 0

27 0

12 0

28 0

4 13 0

29 0

14 0

30 0

j 15 0

l l

16 0

2 0449k/5 i

i t

l

r h, '

/:

f'

. AVERAGE DAILY UNIT POWER LEVEL L

s 5-7

]

r

'l 1

'i DOCKET NO.-

50-260 4'

Unit

- Two PREPARED'BY.

S.'A. Rat 11ff j, ;

TELEPHONE (205) 729-2937 L:

i MONTH -SEPTEMRED 1990 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(We-Net)

(We-Net) 1 0

17 0

.t 2-0 18 0

3 0

19 0

4 0

20 0.

5 0

21 0

6 0

22 0

F 7

0 23 0

8 0

24 0

,[

=!

-9 0

25 0

10 0

26 0

1,

- 11 0

27 0

i!

12 0

28 0

13-0

'29 0

~

i-y 14-0 30 0

e I

15 -

0

- 16 0

1^

0449k/6 o-i I l

0 1

f b

e 4-

<i 9;

' 4-14 ).

<=

,?., ; '4':

AVERAGE DAILY UNIT POWER LEVEL ni

~

.w

+

l DOCKET No.

50-296

' UNIT.'

-Three'

.n.

PREPAkED BY -

S. A. Rat 11ff I

TELEPHONE (205) 729-2937

. MONTH SEPTEMBER 1990 i

DAY'

= AVERAGE DAILY POWER LEVEL DAY-AVERAGE DAILY POWER LEVEL' f

(MWe-Net).

(MWe-Net) 1 0-17 O

t 2

0 18 0

4 3

0 19' 0

4 0

20 0

5 0

21 0

r 6,

o 22 0

f 7

0 23 0

i s

8 0

24 0

9 0

25 0

10.

0 26 0

t 11 0

27 0

t 12 0

28 0

13 0

29 0

14 0

30 0

f

.15 0

16 0

w 0449k/7 m,,

r h

e

\\:

6 1

W 6

1

+, u.ww w.i 7 s e e aw x sey i t

W q '.-

~

~

fI c.

p; OPERATING'DA1A REPORT

~

4 ;;t:

~

' MET W]i.'50-25W

^

J-

- PREPARED BY ~S. A. Ratiiff

~

y TELEPHONE (205) 729-2937 a: -

~ OPERATING STATUS

~

! Notes-

~

1.

Unit Namei Browns Ferry Unit One -

~ 2. -Reporting Period:

Sootember 1990 -

~

. 3.

Licensed Thermal Power (Mt): 3293

4.. Nameplate Rating (Gross Wa): - 1152 5.

Design Electrical Rating (Net We)E 1065' 6.

Maximum Dependable Capacity (Gross We): 1998.4 7.

Maximum Dependable Capactty'(Net We): 1065

8. -If Changes Occur in Capacity Ratings (Items Number 3 Through 7). Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictionsi I? Any:

N/A This Month Yr-to-Date.

-Cumulative

11. Hours in Reporting Period 720 6551 141775
12. Number of Hours Reactor Was Critical

- 0

'0 59521

13. Reactor Reserve Shutdown Hours 0

0 6997'

14. Hours Generator On-Line 0

0 58267

15. Unit Reserve Shutdown Hours'

' 0 0

0

16. Gross Thermal Energy Generated (MdH)

' O O

168066787

17. Gross Electrical Energy Generated (MdH) 0 0

55398130

18. Net Electrical Energy Generated (MdH)

-1743

-15400

$3567688

19. Unit Service Factor 0

0 41.1 f"

20. Unit Availability Factor 0

0 41.1

21. Unit Capacity Factor (Using PBC Net)

' 0-0 35.5

22. Unit Capacity Factor (Using DER Net) 0 0

35.5 l

23. Unit Forced Outage Rate 100 100 52.7

~

l

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

l N/A

25. If Shut Dowi 14 End Of Report Period, Estimated Date of Startup: To be determined l

7-e e

._%u.

p swpduara-ww*--

--J-(

ta sep',-dy9-.

p*'"d's-L*.


y-me'

.,y

.'nst

-d' r-

+rg ww

-a-w

.g-'4 y

-g e-#e-,,e.-fe*,.7 ma

,y

,,p,._a-7 4

-- -:_.3

.:L

-;"^ "=: x

-~/

4 4

OPERATING DATA REPOR7!

~

~

X ~

"~ a~

,; n i_.

n

.-y

^

8;'

3. -

' MET %.

~50-260

^

2*

1:'-JE'M".

~

PREPARED BYl S. A. Ratliff 9.~

J '~

t.

TELEPHONE (2051 729-2937

E

~

OPERATING STATUS

! Notes

.., Unit Namei ~ Browns'Ferrv' Unit Two 1.

2.

Reporting Period:

September 1990 3.

Licensed Thermal' Power (Wt): 3293

! ~

4.

Nameplate Rating (Gross We): '1152 i

~

~

5.

Design Electrical Rating' (Net We): 1065 6.

Maximum Dependable Capacity (Gross We): 1098.4-7.

Maximum Dependable' Capacity (Net W e): ~1065' 8.

If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:-

"~

N/A bx.

9.

Power Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A-This Month'

~Yr-to-Date Cumulative

11. Hours in Reporting Period 720 6551 136662
12. Number of Hours Reactor Was Critical 0

0 55860

13. Reactor Reserve Shutdown Hours 0

0 14200 i

14. Hours Generator On-Line 0

0 54338

15. Unit' Reserve Shutdown Hours

'O O

O

16. Gross Thermal. Energy generated (ftfM) 0 0

153245167

17. Gross Electrical Energy Generated (ftfH) 0 0

50771798

18. Net Electrical Energy Generated (ftfH).-

-5512

-47629 49066795

19. Unit Service' Factor ~

0 0

39.8

20. Unit Availability Factor 0

0 39.8

21. Unit Capacity Factor (Using MDC Net) 0 0

33.7

22. Unit Capacity Factor (Using DER Net) 0 0

33.7

24. Shutdowns Scheduled Over Neut'.6 Months (TypeJ Date, and Duration of Each):

52.8~

23. Unit Forced Outage Rate 100 100

'N/A

^

[

25. If Shut Down At End Of Report Period, Estimated Date of Startupi February 1091 y

1' S

'h9 y %-e.e-r

+ -

yww,

,e9.,,

.W,4eg-

.y--r-sy g

p-

.y,--y

-v-Mi-y3.**-g=*y.-

m e1Ny

-est-wg-

..yp=-

-y gy-wei,yw-i.,,,=

w gjwur+iwey.--

gy.

dp,.y -y era q.

.,ig,7g

,gy,,

.4

,,9

M

. e c--

  • w' m --

m q; m OrLRATING DA!A EEPAl.

-d' "[

~

.1

~

~,

q 5 a 4 -'

DOCKET CD..; sn *t96'

~ 1I "' u

' PREPARED BY S. A. Ratiiff

.. s,

TELEPHONE -(205) 729-2937.

j.

~

p

~

f*3 OPERATING STATUS

'1.

Unit Name:

! Notes

- (

Browns Ferry Unit Three 2.

Reporting' Period:

Sootember 1990 '

~!

3.

Licensed Thermal Power. (Wt): 3293

~

=

4.

Nameplate Rating (Gross We): '1152

- 5.

Design Electrical ~ Rating (Net We): 1065

~1 q

6.

Maximum Dependable Capacity (Gross We):- 1098.4 1-7.

Maximum Dependable Capacity (Net MWe): 1065 8.

If Changes Occur;in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

(

N/A 9.

Power Level To Which Restricted If Any (Net We):

N/A

~

10. Reasons For Restrictions.:If.. Any:

N/A This Month Yr-to-Date Cumulative'

11. Hours in Reporting Period.

720 6551 119087

12. Number of Hours Reactor Was Critical 0 45306
13. Reactor Reserve Shutdown Hours 0

0 5150

14. Hours Generator On-Line 0-0 44195
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH).

O O

131868267

17. Gross Electrical Energy Generated (MWH);

0 0

43473760

18. Net Electrical Energy Generated (WH) -

-1905-

-17246 41977787

19. Unit Service' Factor.'

'O O

37.1 f'

20. Unit Availability Factor.

0 0

37.1

21. Unit Capacity Factor (Using MDC Net)-'

0' 0

33.1 i

l

22. Unit Capacity Factor (Using DER Net) 0 0

33.1 i

23. Unit Forced Outage Rate 100-100 56.8
24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):

N/A-

25. If Shut Down At End Of Report Period. Estimated Date of Startup: To be determined 0449k/10 a

1 a:

i-ea,

-w--

2, 6,

g,..e, e

-A--sr.

-*"r'"'*""--~-

t

  • W~

'F'*'*

~*##

  • C W-

~"e'

..m.

-ep.

,r..r:,.s-.-,..

-M'N' t'~'W

  • 'V

' + *

  • +'M'T-"*'*-'

'*'7'*

  • -'e-c*F*

r

+

7 :,y.,--

. gg

~

-7:

', _.i

u.

,, _.m ;- -,,

- 4

__~

gp } _

_k tmlT. SHUTDOWNS AND,POWE2 REDUCTIONS '

~ -

(JNIT IMME:

' One,-

'E

' ~J PREPARED BY:5. A2 RatliH :

~

eg di

' REPORT MONTH:

September 1990 --

d TELEPHONE:(205) 729 2937'

~ d 4

[

1:

' ! Method of'

-! Licensee

!~

Cause and Corrective :!

! Duration !-

' ! Shutting Down

!' Event

! System-. ! Component'!-

- Action to~

! No.

~!< Date

! Type

! (Hours) ' ! Reason 2 - !-Reactor 3:

! Report No.

-! Code l

4

! Code "

' Prevent Recurrence S

s.

e-e a

e e

e e-.

e e

s l'

- 1 t--

! 315

! 06/01/85-!--F

! 720

-'t F

4-

! Administrative hold to- !

! resolve various TVA and !

~!

- ! NRC concerns.

1-t

,~ 1,.

1!

' t

~

t.

11:

l t

s I: Forced

' 2 Reason:

'3 Method:

' 4 F

Enhibit G-Instructions S: Scheduled A-Equipment Failure (Explain).

1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licenseei C-Refueling -

._4-Continuation of Entsting Outage (NUREG-061) 3-Automatic Scram

. Event Report (LER) File D-Regulatory Restriction E-Operator: Training and License Examination -

5-Reduction F-Administrative 94ther G-Operational Error (Emplain)

-5 Exhibit I-Same Sovree.

H-Other (Explain) 0449k/11 3

0 s..m.e.

q..-

.,r,-

e

%.r :

,.e.u m

e 3

.g.w_~y.--

f-.9.,,

o

.e 7%,

,.c.%.,gy-p

,9m.-.

p_.y,

,.p-.

3,.m..---,

w 3

j _

__y___

. -r, w

~

~:._ _,

.D[lCkET. W:

50-760,

. y:s -

._m

e - ; ;p %

. >~.-

-- UNIT SHU1 DOWNS AND POWER REDUCTIONS'

- UNIT NME:

Two

~

~

~

COMPLETED BY:5.D. Ratlif f ?

u

- U..

- REPORT MONTH:

Septem6er 1990 TELEPHONEi(205). 729-291U H

9-

.j

-a

-! Method of<

"! Licensee Cause and Corrective !

!~

'!' Duration 1

! Shutting Down' ! Event.

~ !' System.

! Component !-

Action.to' 1 --

u l

2

! Reactor 3'

! Report No.

! Code

! Code 5.

-ti Prevent Reevrrence d

! No.'

! Date-

! Type

! (Hours) ! Reason

! ~

~!'-

!~

1-

! 305

! 09/15/84 !

F.

! 720

.F.

4

!~

! Administrative hold to !t

~ !

! resolve various TVA and 1-

! NRC concerns.~-

~ !

!~

l' l'

('

I: Forced 2 Reason:

3 Method:

Exhibit G-Instructions F

S: Scheduled A-Equipment Failure (Explain) 1-Manual ~

for Preparation of Data B-Maintenance or Test 2-Manual Scram ~

Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage

-(NUREG-061);

E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other 5 Exhibit I-Same Source 1 G-Operational Error (Explain)

H-Other (Explain) 0449k/12 e

0 e WW' %

iN--.-^'s ita,_

e A<

g--

a.5 mneme..p.r,.g._,.

y,,

p.

-m>mp.,s..,,,_

y

Nim, s.a,aa*

,,-i...,

7 pay.*e.-=.

,y

-',3egne,,,,,..m ggw

,,.g Jw

,w

,g gme y,

p

,,g,g

-- :: =, ;_ -,.

+,..3 77n g.

., g 1 pun gw]-L; Of 5:

., ~.

. (W CTi ta0 :_.g_lJO-??6 '

_q-c : UNIT. SWIoni,Ju.o t'cwER RanJCTIONS.

... - 0911 esh r.

qurtUnaEvif.1A.Ja.tififf

.s....

,. p...

-^r~

.-g

$y 3r, RE%i 'I M t j;ptencer_19M_

-ILLU H AE:1795) 7N930~

_a(

.a;

I

! Method of-

. ! Licensee -

.t.!

'.. Action to.

!.Cause and Corrective !

~

!-~ Date '! Type ~

! (Hours)

1. Reason 2

.I Reactor 3

! Report No.

!' Duration'!-

! Shutting Down ! Event'

! Syst y ' :1 C yde

! No.

l

! Code

! Co

! ' Prevent Recurrence

1-

?

1.

~~

! 157

! 03/03/85 !-

F

.!' 720 F.

4

1. Administrative hold to ~!

! resolve various TVA and !

D!

~ !

! NRC concerns.

~!

I' I'

I'

. I

.. (

'3

~ !

4 4

I: Forced 2 Reason:

3 Method:

knhibitG-Instructions F

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee

^

C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Entsting Outage (IRNtEG-061)

E-Operator Training and License Examination -

5-Reduction.

F-Administrative 9-Other G-Operational Error (Explain)

- SEnhibit I-Same Source H-Other (Emplain)-

~ '

p.

1 D449k/13 O

+

G 9

9

..~n

,e

..,--,..,e r-n.

.,,.c,

..,.-,,, +.

.